MEP PROJECT PROGRESS REVIEW
PRESENTED TO:
MR. IMRAN ASLAM MUGHAL (GM-C)
PRESENTED BY:
MR. NORBERT ANIS (SR. MEP COORDINATOR)
FAHAD SALEEM (ELECTRICAL COORDINATION ENGINEER)
YOUSAF AHMED (ASST. COORDINATION ENGINEER)
Presentation Outline 2
1. Project Progress FDL -021
a) Execution Status
b) Birds Eye View of Logs
c) Submittal Details
d) Purchase Order Details
e) Pictorial View- Work Progress
2. Project Progress FDL -022
a) Execution Status
b) Birds Eye View of Logs
c) Submittal Details
d) Purchase Order Details
e) Pictorial View- Work Progress
3
ELECTRICAL WORKS
FDL-021
1.a Execution Status (FDL-21) 4
• Points marking on Floor-9 Slab / Pour-4
Apartments • Points marking on Floor-10 Slab / Pour-1
• Conduit Laying on Floor-9 Slab / Pour-4 • Conduit Laying on Floor-10 Slab / Pour-1
• Wiring in mockup Apartment 80% Done
• Points opening on Floor-8/ Pour-3 • Points opening on Floor-8/ Pour-4
• Back box marking on Ground Floor-Apartment-
• Power Cable tray marking (Basement-1) • Back box marking on Ground Floor-Apartment-
Type-B1
Type-A2
• Power Cable tray marking (Ground Floor)
• Power Cable tray marking (Basement-1)
Ongoing Upcoming
Activities Activities
1.b Birds Eye View of Logs (FDL-021) 5
Purchase
RFI Submittal MIR IR
Order
• Total = 9+0=9 • Total = 15+0=15 • Total=3 • Total = 12+3=15 • Total = 44+5=49
• Responded 9+0=9 • Approved = 10+0=10 • Issued = 2 • Responded = 12+2=14 • Responded = 44+2=46
• Awaiting = 0 • Rejected = 4 • In progress = 1 • Awaiting = 1 • Awaiting = 3
• Response Awaiting = 1
1.c Submittal Details (FDL-021) 6
Appr oved
PVC Condu i t & Fl ex i bl e Cond ui t
Rejected Critical
PVC & M et a l Back Boxe s
Awaited
PVC Wi r es & Cabl es
Shop Drawing for Lighting Layout
(3rd to 8th Floor) Cable Trays
Design change from Client end
S h o p D raw in g fo r 3 rd to. 8 th F. lo o r
(T y p foical) r p o w er
S h o p d raw in g o Ef lectria sy stem s
In M o ck u p A p artm en ts
Shop Drawing of Security
M et ho dol og y of El ec t r i cal Cond ui t W or ks
System (Typical 3rd to 8th Floor) Hanging Supports
Design change from Client end
P V C cab le1 .5 m m sq ,2 co re
(F ireA larm )
Shop Drawing for Fire Alarm
(3rd Floor to 8th Floor) Lightening Protection
Design change from Client end
Shop Drawing Basement 1-Main Feeder
(Dated: 02-12-20)
Work Methodology Schedule (Execution / Procurement)
Power & Lighting System Wiring Execution Schedule shared with MPL Planning Engineer
Misc. Comments (Primavera P6)
1.d Purchase Order Details (FDL-021) 7
# PO# PO Description Make/Supplier Amount
01 2393 Lighting & Power Cables Pioneer Cables PKR 106,129,281/-
02 2409 Conduit & Accessories Dadex PKR 8,954,988/-
03 Fire Resistant Cable (In Progress) 2M Kable PKR 9,091,200/-
1.e Pictorial view of Work Progress
8
Figure 1 & 2: Conduit laying at slab (9th Floor)
Pictorial view of Work Progress; Continue 9
Figure 3 & 4: Appt. B marking of Back Box
10
MECHANICAL WORKS
FDL-022
2.a Execution Status (FDL-022) 11
●
Marking of Sleeves (4’’, 6’’) placed on slabs (Drainage, GSS) 9th Floor P4
●
Submission of drainage proposal shop drawings for ground floor low level.
Ongoing Activity
2.b Birds Eye View of Logs – Plumbing 12
Purchase
RFI’s Submittal MIR IR
Order
●
Total = 10 ●
Total = 18+2=20 ●
Issued: 2 ●
Total = 7 ●
Total = 25
●
Response Awaiting = ●
Approved = 5 ●
In Progress: 1 ●
Approved = 3 ●
Approved = 19
1 ●
Rejected = 4 ●
Rejected = 2 ●
Awaiting = 5
●
Resubmission = 0 ●
Awaiting = 2 ●
Resubmitted = 1
●
Response Awaiting =
5+6
2.c Plumbing Submittal Details
13
A p pr ov ed
Awaited
Hanging SupportSystem SIKLA
Rejected / Resubmission
PRR Pipes & Fittings (Flow Tech)
uPVC Pipes & Fittings (Flow Tech)
Critical (Submitt
Shop Drawing of Ground Floor High Level Mock up Drainage
System Layout
Miscellaneous items for PL Works (Non Shrink grout)
(Verbal Approval)
PPRC Ball Valves (Hot & Cold Water
S h o p D rawin g o f G F M o ck u p Dra in ag e
P i p e & W ate r S u p p l y
Supply)
SS Floor Drain Hepworth Brand
Ha n g in g S u p p o rt S y ste m ( No r m,U n iq u e,M an g o )
Prev iously appr oved & c hange d wit h Sikl a
Shop drawing of Ground Floor Low Level Drainage System
Hanging Support System (INKA) & PPR
pipe & fittings DADEX
Shop Drawing of Drainage Piping Layout (3rd to 8th Floor
Typical)
PPR Ball Valves (Hot & Cold Water
Shop Drawing of Water Supply 3rd to 6th Floor & 7th to 8th
Floor piping layout Supply)
SCR advised to go for alternative brand
Shop Drawings of 3rd to 8th Floor Plan
Plumbing Sleeves Layout Shop Drawing for Gas Supply System (Mockup Appt. GF) & 3rd
to 8th
2.b.1 Birds Eye View of Log- Fire Fighting 14
Purchase
RFI Submittal MIR IR
Order
●
Total = 4 ●
Total = 9 ●
Issued: 2 ●
Total = 9 ●
Total = 1
●
Responded = 4 ●
Approved = 6 ●
In Progress: 1 ●
Approved = 4 ●
Approved = 1
●
Awaiting = 0 ●
Rejected = 1 ●
Rejected = 1
●
Resubmission = 2 ●
Resubmission = 1
●
Awaiting = 3
2.c.1 Fire Fighting Submittal Detail 15
Approved
Rejected / Resubmission
Hanging Support System SIKLA
Response Awaited Critical (Submittals)
MS Seamless Pipe & Fittings (Lontrin , Jintai and Muller)
Shop Drawing Mockup Firefighting Layout
Hanging Support System
INKA
Hanging Support System
(Mungo,Norm,Unique)
Previously approved & changed with Sikla
Changed with Sikla
Miscellaneous Items for FF works
Shop Drawing 3rd
to 8th Floor typical Hanging Support System
SIKLA
Shop Drawing of Fire Fighting
Piping Layout
Fire Fighting (MIR Rejection)
Unreadable font size Piping Layout
2.d Purchase Order Details (FDL-022) 16
# PO# PO Description Make/Supplier Amount
01 2398 Delivery of Hollow concrete blocks Required for LAYYAH GROUP OF PKR142,800 /-
Store/wash room of MEP at FDL-022. SERVICES
02 2427 u-PVC Pipes for Sleeves TAKHAT HAZARA PKR 149,375/-
03 2422 Crescent Corporation (MEP PKR 28,529,472/-
Firefighting material requirement for FDL-022 Works)
04 2479 Purchase order of Hanging supports for whole project Ingenious Engineering products PKR 7,729,138/-
Sukh Chayn
05 u-PVC Pipes for Sleeves (9th to 12th Floor) TAKHAT HAZARA PKR 245,287/-
(In Progress)
2.e Pictorial view of Work Progress 17
Figure 5: Drainage sleeves grouting testing Completed Figure 6: WC Flush Tank Sample Installation
Pictorial view of Work Progress; Continue 18
Figure 7: Water Supply Pipe Pressure Testing Figure 8: PPRC piping in Powder Room
Pictorial view of Work Progress; Continue 19
Figure 9: Sleeves for Drainage Piping in 9th Floor P4 Figure 10: Sleeves Fixing in EPS Panel for Pipe
Slab Fixing
Pictorial view of Work Progress; Continue 20
Figure 11 & 12: Material Stored In Designated Racks
21