By: Kapil Gambhir: Presentation On Basic Knowledge Railway Siding & Its Major Components
By: Kapil Gambhir: Presentation On Basic Knowledge Railway Siding & Its Major Components
Major Components
By: KAPIL GAMBHIR
RAILWAY SIDING
FUNCTION of Siding:
• Sidings may be used for storing, loading, and unloading vehicles.
• Common sidings store stationary rolling stock especially for loading and
unloading.
• Industrial sidings go to factories, mines ,collieries and ware house .
In Single line Main Track, siding can also be used to pass the crossing train
from other side.
2
GAUGE
GAUGE:
Distance between inner faces of the two parallel rail heads is called Gauge.
3
Formation of BG track
RAIL
Sustainable: World: World (not
Sustainable restricting to nation)
PSC sleeper
buildings / AND also, fulfilling
infrastructure and dreams. Customer’s
Ballastresponsibility dream infra / home
towards project which means
environment. world to them.
Stone Dust
4
FORMATION of BG TRACK
Safer : for
everyone Sustainable: World: World (not
associated with Sustainable restricting to nation)
us and our buildings / AND also, fulfilling
customers. infrastructure and dreams. Customer’s
Superior quality responsibility dream infra / home
of products. towards project which means
environment. world to them.
5
MAJOR COMPONENTS OF RAILWAY TRACK
1. Rails
2. PSC SLEEPERs
3. BALLAST
4. Turnouts (Point & crossing)
5. AT WELDING
6. Fittings
Safer : for
everyone Sustainable: World: World (not
associated with Sustainable restricting to nation)
us and our buildings / AND also, fulfilling
customers. infrastructure and dreams. Customer’s
Superior quality responsibility dream infra / home
of products. towards project which means
environment. world to them.
6
RAIL
RAIL:
These are Steel sections laid in two parallel lines on
sleepers to form a TRACK on which locomotives can
run.
MATERIAL of RAIL:
Material of rail should be such as to provide
minimum possible wear.
Safer : for
Ideal steel for rails and wheels are the one that
everyone
achieve even
associated wear on both rail and wheels. Hardness
with
of us
both
and should
our be same as possible.
customers. Chemical % in 880 Grade Rails
Superior quality
RAIL SECTION:
of products. C 0.4-0.8
Flat footed section: Mn 0.9-1.45
60 KG, 52 KG, 90R etc. Si 0.03-0.30
P 0.06 max
S 0.06 max
Al -
H2 content 3 ppm max 7
Hardness 260 BHN min
FLAT FOOTED RAIL SECTIONS
8
PSC SLEEPER
SLEEPER:
It is a component of track structure transversely places , on which rails are laid.
FUNCTION of SLEEPER:
1. Transmit the load to formation below ballast
2. To maintain Gauge of track
3. To provide lateral and longitudinal resistance to track.
Safer : for
SLEEPER DENSITY: Sustainable: World: World (not
everyone
1540 SLEEPERS
associated with per KM Sustainable restricting to nation)
us and our buildings / AND also, fulfilling
customers. infrastructure and dreams. Customer’s
TYPE OF SLEEPER: responsibility dream infra / home
Superior quality
ofPSC Sleepers
products. towards project which means
environment. world to them.
9
PSC SLEEPER SECTIONAL VIEW
10
11
BALLAST
BALALST:
It is a granular material, usually broken stone, which laid on the formation to
form a bed for the track fittings like sleepers.
FUNCTION of Ballast:
1. Transmit the uniform load to formation below ballast
2. Allow Efficient drainage
3. Holding track in vertical, lateral and longitudinal direction without much of
Safer : for
permanent deformation. Sustainable: World: World (not
everyone
associated with Sustainable restricting to nation)
usBallast
and our Cushion: buildings / AND also, fulfilling
customers. infrastructure and dreams. Customer’s
250-300 mm Cushion responsibility dream infra / home
Superior quality
of products. towards project which means
Size of Ballast: environment. world to them.
20mm -65 mm (98 %)
12
THERMIT WELDING
Thermit Welding
This only form of site welding adopted in Railway.
ANIMATED VIDEO:
https://www.youtube.com/watch?v=19jqMckL8bA
FIELD VIDEO
https://www.youtube.com/watch?v=zzXX1DMY-DA
13
POINT & CROSSING
• Points –A pair of tongue rail with their stock rails are termed
as points.
• Crossing –A crossing is a device introduced at the junction
where two rails cross to permit the wheel flange of railway
vehicle to pass from one track to another track.
14
POINT & CROSSING
15
POINT & CROSSING
16
FITTINGS
1. ERC CLIP
2. RUBBER PAD
3. LINER
4. FISH PLATE
5. NUT BOLTS
17
Elastic Rail Clips (ERC)
ERC: Elastic rail clips are used with concrete railway sleepers
to fasten rails on both sides.
The rail clips are usually made of forged spring steel, which
are manufactured by hot forging process
18
Grooved Rubber Pad
RUBBER PAD:
Railway rubber pad is installed between Steel Rail and sleeper.
FUNCTION
1. The function of the railway rubber pad is to protect the
sleepers from impacting and crushing.
2. Dampening of vibration
3. Railway rubber pad can make the electrical isolation of the
signal system.
19
VIBRATION ABSORPTION
20
LINER
LINER:
Liners are inserted between foot of ral and ERC .
TYPE:
METAL liner: For non-track circuit area
GFN liner: For Track circuiting area or in corrosion prone area
FUNCTION
Maintain Gauge of track
21
FISH PLATES
FISH PLATES:
These are used to connect two railway together with fish bolts.
It provides continuity across rail joint for movement of vehicle.
22
SCHEDULE OF DIMENSION
23
Schedule of Dimension ( 1676 mm GAUGE (BG))
24
Schedule of Dimension ( 1676 mm GAUGE (BG))
25
Clearance of Check Rails
Clearance of Check
Rails on Level Crossing =
51-57 mm
26
Minimum Horizontal Distance
Buildings and Structures : Minimum Horizontal Distance from
centre of track to any structure except a platform
SL Item Recommended Minimum
27
28
MINIMUM VERTICAL CLEARANCES
SL Item Minimum
29
30
Clearances for Power Line Crossings
Clearances for Power Line Crossings in Non-Electrified & Electrified Territory :
Minimum Clearance Between
Highest Traction Conductor
Minimum Clearances From Rail Level And LowestTransmission
Line Crossing Conductor
Over Head Crossing Voltage
Existing Power Line New Power Line
Crossing For Non - Crossing Or Crossing
Electrified Territory Planned For Alteration
SL Item Minimum
1 Upto and including 11 kV Normally By Underground Cable
31
ANY QUESTIONS ??
32
THANK YOU
ALL THE BEST
33
RAILWAY SIDING
34
FUTURE TOPICS
1. Gradient
2. OHE
3. Liasioning
4. Steps in approval
35
36
CONING OF WHEELS
Flanges of Train wheel never made flat , But they are in shape of CONE with a
slope of 1:20.
Its Maintains the vehicle in Center position with respect to the track
37