Edgeware Edge Equation Lite Modular Outdoor Cabinet Main Slides
Edgeware Edge Equation Lite Modular Outdoor Cabinet Main Slides
3 Future Challenges
Edge to the Convergence
Edge Network
Big Site • IoT Edge Aggregation
Wireless
Quantity • 5G Small Cell
• Edge Computing
• AI Outdoor
• 4G Small Cell
Small but • Smart Traffic
Distributed • Wifi Outdoor Node
Small Site
Power
Usage
Difficult Solar
Power Power
Acquisition
Difficult
Power
Site
Backup Outdoor Edge
Acquisition
Deployment
Outdoor Power Solution Expert
• Hardware • Customization
• Software • Integration
Complex •
• Design Deployment
Deployment High Opex
4
Edge to the Convergence
Provider 1 Provider 1
Power
Network
Monitoring
Project Analyze Purchase Design and Integration Final Site Analyze and Design One Stop Purchase Final Delivery
Traditional Outdoor Solution Design-Maze and Puzzle End to End Solution with Clear Picture
• Has to break down the requirement and purchase in different providers. • Early participation in the project design.
• The design and purchase is like a maze. • End to end providing, one stop purchase.
• The on site integration is like puzzle, you never know how it will be , how it will • Customization and integration for you.
work and how long it will work. • On site integrated products, reduce on site work.
• No provider is responsible for overall. • We will be responsible for overall.
5
Edge to the Convergence
Outdoor
Customization
• We believe that outdoor scenarios will keep on changing.
• We help customer customize their solution case by case.
Integration
• We help customer integrate the solution as much as possible.
Localization Integration • So they will have less build and integration on site.
• We can also help customer integrate different vendors product.
Localization
• We believe that local staff talk to local market.
Customization • Local team understand local requirement.
Power Network
6
02.
Edge Equation Lite Series
x=(e+v)C
One Equation Unlock Everything
Edge to the Convergence
WIFI and LTE Small Cell Coverage Rural Area Facility and School Power
To provide WIFI and LTE Small Cell solar power anywhere Fast and cheapest way to provide power to the facility and school in rural area.
8
Edge to the Convergence
LoRa or IoT Gateway Power and Backhaul Smart City Sensors Power and Backhaul
To provide solar power and backhaul for IoT gateway enable flexible deployment. City Management Sensors such as PM2.5 , Temp, Humidity sensors
9
Edge to the Convergence
Power
Smart Grid
Traffic
UPS
Video User
Surveillance Authorization
IoT
Battery Installation
Statistics
Power
Industrial Surge
5G Power Control Protection Configuration
Backup
Outdoor ICT
Scenarios Outdoor Solution
Key Functions Monitoring
Solar OAM
Network
Backhaul
Outdoor
Smart WIFI Environment
City
Switch Cabinet
LTE
FAN
Telecom
Power 4G Microwave
Small Cell Heater
Edge
Router
Computing Waterproof
AI Outdoor
10
Edge to the Convergence
Provider 1
Provider 4
11
Edge to the Convergence
Serialization
Standard Components
5G Power Outdoor
Backup IoT
WIFI Changeable
Requirement x=(e+v)C Case by Case
Customization
Convergence
Software Platform
4G Smart Video
Small Cell City Surveillance x=(e+v)C
Software
Requirement
Telecom Edge
Power Computing AI Outdoor
12
Edge to the Convergence
13
Edge to the Convergence
5G Station
5G Station
5G Power Outdoor
Backup IoT
WIFI Data Center
14
Edge to the Convergence
U300 UPS Version for Power Grid Available Scenario S300 Solar Version for Solar Power Scenario
• 300W UPS • 800W Solar Power Max
• 48V 15.8AH Lithium Batter • 48V 50AH Lithium Batter
• Full system monitoring by Convergence Platform • Full system monitoring by Convergence Platform
• Modular design but accept customization • Modular design but accept customization
15
Edge to the Convergence
PWU
(1U)
Solar Surge Suppressor Smart Breaker
BTU
(3U)
Battery Unit
Control
16 Power
Edge to the Convergence
SCU
(2U)
Solar Surge Suppressor Smart Breaker
BTU
(5U)
Battery Unit
Control
Power
18
Edge to the Convergence
Scenario 1 :Outdoor WIFI AP Scenario 2 :Outdoor Video Scenario 3 :Outdoor Satellite Scenario 4:Outdoor Satellite Site
Solar Power Cabinet Surveillance Solar Power Site Power Cabinet(Lithium Power Cabinet(Lead Acid Battery)
* SCU,BTU,MCU,SPP configured. Cabinet Battery) * SCU,MCU,SPP configured.
* SCU 800W Solar Rated Power Max * SCU,BTU,MCU,SPP configured. * SCU,BTU,MCU,SPP configured. * Lead Acid Battery
* BTU with 48V40AH battery. * SCU 800W Solar Rated Power Max * BTU with 48V50AH battery. * Layer 3 Router
* Layer 3 Router with 4 ports * BTU with 48V40AH battery. * Layer 3 Router * Satellite Router
POE/POE+/POE++ * Layer 2 switch with 4-8 ports * Satellite Router * PBX
* Perfect outdoor WIFI power and POE/POE+/POE++. * PBX * Cost down all in one remote telecom
backhaul solar power node in rural area * One stop outdoor power and * All in one remote telecom coverage coverage node with solar power. Perfect
that is difficult to acquire power. backhaul solar power node for video node with solar power. Perfect solution solution in rural area.
surveillance deploy in rural area that is in rural area.
difficult to acquire power.
Width
300mm
Anti-Thief Cooling Sensor
Alarm Defending
Supporting
System Highly Integrated Power Unit with Full Protection
• Highly integrated power module, no more on site
assembly.
• Fully protected with smart breaker and surge
PWU suppressor.
(1U) • Full power system under monitoring for better
Solar Surge Suppressor Smart Breaker maintenance.
Control
20 Power
No Traditional Cabling in Power and Energy
Edge to the Convergence
DC48V AC110/220V
Full Series Voltages to be provided by Requirement Customization
• Mainstream voltage DC48V DC36V DC24 DC12V AC110V/22V all can provided and
Signal and Power feed to devices slots directly. No more on site cabling.
Panel
Customized Power Connector Project By Project
• Design together with customer in advance for the power connector.
• Case by case customization and build in factory
Customer Device Power
Interface
• On site plug in and play , no need extra work.
• Integrated and one stop solution.
Service Slots
Service Slots
Interface
Service Slots
One Stop Power Feeding
No More Power Adapter Customized for You
21
Edge to the Convergence
Power Unit-PWU
Items Specification
Control
AC in Power
Signaling
AC
Signaling
DC48V
PWU Module Name Power Unit(PWU)
Dimension 300mm*180mm*44mm(W*D*H) 1U
Surge Smart DC-UPS
Suppressor Breaker
Surge Suppressor
Smart Breaker
• PWU is the all in one unit that integrated with UPS, Smart Breaker, Surge DC-UPS
Suppressor.
• It works as power source of Equation Lite. Provides power , system Rated Input Voltage 90-280VAC
PFC 0.99
22
Edge to the Convergence
Problems from Power Input Lightning Protection Anti-shock current, 8/20μS combined wave is not less than 10kA;
All in One Surge Protection and Smart Breaker Module to Give Comprehensive
• The power input and daily operation of the power system will face challenges. Protection
• Lighting surge frequently happen in Central America during raining season. • Surge suppressor will absorb the surge from lighting and power grid.
• Power grid electricity quality is not good bring over or under voltage. Solar panel • The smart breaker will provide over/under voltage , over current , short circuit
voltages changes also bring same problems. and current leakage protection.
• Short circuit sometimes happen will damage the whole system if we don’t have • When these happen, the smart break will go into protection mode and can off the
protection. load power .
• Current leakage will put engineer in danger. • When the electricity comes back to normal status, the smart breaker will recover
23 by itself. Not need on site operation.
Edge to the Convergence
Battery Unit(BTU )
Control
Power
Signaling
BTU
Items Specification
DC48V
Dimension 300mm*200mm*132mm(W*D*H)
BMS Configured
24
Edge to the Convergence
Control
Item Specification
Power
Signaling
Unit Name Monitoring and Control Unit-MCU
MCU
Dimension 300mm*66mm*180mm(W*H*D)
Weight 1kg
25
Edge to the Convergence
Weight 1.5kg
26
Edge to the Convergence
Door
Defend Door Door
Sensor Control
27
Edge to the Convergence
Battery Management
Control Control
28
Edge to the Convergence
Raining and Humidity Sunshine and Ultraviolet Rays Customized Metal Material
• The material of the cabinet metal is optional. Can be steel,
stainless steel and aluminum.
• Thus , customer could choose the material based on their
scenario
29
Edge to the Convergence
OAM&
Control
Solar
Solar
PV Bus
Controller
Power
Generation
Battery Load
30
Edge to the Convergence
31
Edgeware Convergence Platform Software Architecture
Edge to the Convergence
32
Edgeware Convergence Platform for Remote Site Management
Edge to the Convergence
33
Edge to the Convergence
Solid Quality
• Stainless steel material.
Pole
• Perfect surface spray process, not only for
appearance as well as the protection.
• Targeting 10+ years life time.
Base
Side View
PCG-II Pole
34
Edge to the Convergence
https://edgewaretech.com/
35
THANKS
FOR WATCHING
Power Solution Expert