Grade 9 Math
PROBLEM SOLVING
INVOLVING
QUADRATIC
EQUATIONS
Julius S. Antonio
Guide in solving word problems.
1. Read the problem thoroughly and gather the necessary
information.
2. Identify what is/are asked.
3. Represent the unknown quantities with algebraic
expressions based on information.
4. Formulate the equation.
5. Determine the solution set or roots of the equation.
6. Check the roots.
Example 1 – Number Relation Problem
The product of two numbers is 18 and their sum is
9. Find the numbers.
Let = one of the numbers
= the other number
The equation based from the problem:
𝒙 ( 𝟗 − 𝒙 )=𝟏𝟖
Solve the equation:
𝒙 ( 𝟗 − 𝒙 )=𝟏𝟖
𝟐
𝟗 𝒙 − 𝒙 =𝟏𝟖
𝟐
𝒙 −𝟗 𝒙+𝟏𝟖=𝟎
( 𝒙 −𝟑 )( 𝒙 − 𝟔 )=𝟎
𝒙 =𝟑 𝒙 =𝟔
Check for the roots:
𝒙 =𝟑 𝒙 =𝟔
Final answer:
The two numbers are 3 and 6.
Example 2 – Work Problem
Mark and Ben finish cleaning the backyard in 2
hours. If Mark working alone, takes 3 hours longer
than Ben does it by himself, how many hours will
each boy finish the work alone?
Pointers to Remember
Work problems are referred to situations where
persons or machines work together or separately
to complete a certain task.
It is important to remember that parts of the work
contributed by all the workers is equal to one
complete work.
Example 2 – Work Problem
Mark and Ben finish cleaning the backyard in 2
hours. If Mark working alone, takes 3 hours longer
than Ben does it by himself, how many hours will
each boy finish the work alone?
Let be the number of hours Ben do the work.
Then, will be the number of hours Mark finish the
work.
Example 2 – Work Problem
Since Ben can do the work in hours,
𝟏
Then, Ben’s rate of doing the job is
𝒙
Since Mark can do the work in hours,
𝟏
Then, Mark’s rate of doing the job is
𝒙 +𝟑
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Time to Rate of
finish the doing the
job job
Ben
Mark
Ben &
Mark
Equation based on the table:
𝟏 𝟏 𝟏
+ =
𝒙 𝒙+ 𝟑 𝟐
Solve the equation:
𝟏 𝟏 𝟏 𝟐
+ = 𝒙 − 𝒙 − 𝟔=𝟎
𝒙 𝒙+ 𝟑 𝟐
( 𝒙 −𝟑 )( 𝒙 +𝟐 )=𝟎
( 𝟏
( 𝟐 ) ( 𝒙 ) ( 𝒙+𝟑 ) +
𝟏
=
𝒙 𝒙+𝟑 𝟐
𝟏
)
𝒙=𝟑
𝟐
𝟐 𝒙+𝟔+𝟐 𝒙=𝒙 +𝟑 𝒙
𝒙=−𝟐
𝟐
𝒙 +𝟑 𝒙 −𝟐 𝒙 − 𝟐 𝒙 −𝟔=𝟎
Check for :
𝟏 𝟏 𝟏
+ = Ben can finish the work
𝒙 𝒙+ 𝟑 𝟐
in
𝟏 𝟏 𝟏 𝒙 hours
+ =
𝟑 𝟑+ 𝟑 𝟐
Mark can finish the work
𝟏 𝟏 𝟏
+ = in
𝟑 𝟔 𝟐 𝒙+𝟑 hours
𝟏 𝟏
=
𝟐 𝟐
Final Answer
Ben can do the job in 3 hours
while Mark can do the job in
6 hours.
Example 3 – Geometry Problem
The area of a rectangular garden is 160 square
meters. Suppose the length of the garden is 4
meters more than twice its width, what is the
length of the garden?
Information from the problem:
Let be the width of the garden.
Let, be the length of the garden.
Equation:
𝒙 ( 𝟐 𝒙+𝟒 )=𝟏𝟔𝟎
Solve the equation:
𝟐
𝒙 ( 𝟐 𝒙 +𝟒 )=𝟏𝟔𝟎 𝒙 +𝟐 𝒙 −𝟖𝟎=𝟎
𝟐
𝟐 𝒙 +𝟒 𝒙=𝟏𝟔𝟎 ( 𝒙 −𝟖 )( 𝒙 +𝟏𝟎 ) =𝟎
𝟐
𝟐 𝒙 +𝟒 𝒙 −𝟏𝟔𝟎 =𝟎 𝒙 =𝟖 𝒙=−𝟏𝟎
Length:
Divide the equation by 2.
Length:
Check for :
𝒙 ( 𝟐 𝒙 +𝟒 )=𝟏𝟔𝟎
Final Answer:
𝟖 ( 𝟐(𝟖)+𝟒 )=𝟏𝟔𝟎
𝟖 ( 𝟏𝟔+𝟒 ) =𝟏𝟔𝟎 The length of the
garden is 20 m.
𝟖 ( 𝟐𝟎 )= 𝟏𝟔𝟎
𝟏𝟔𝟎=𝟏𝟔𝟎
Thank you for
watching!
For questions, ask them
via comment section.