0% found this document useful (0 votes)
56 views21 pages

Proposed Solutions and Projects

The document outlines the process for developing a school improvement plan. It details the objectives of Phase 2 which are to: 1) Review general objectives and targets, 2) Formulate solutions, and 3) Develop and write project designs, the school improvement plan, and annual implementation plan. It provides guidance on formulating solutions to identified problems and developing project designs to address these solutions, including defining activities, outputs, and monitoring. The overall goal is to create manageable projects to improve the school and meet objectives.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views21 pages

Proposed Solutions and Projects

The document outlines the process for developing a school improvement plan. It details the objectives of Phase 2 which are to: 1) Review general objectives and targets, 2) Formulate solutions, and 3) Develop and write project designs, the school improvement plan, and annual implementation plan. It provides guidance on formulating solutions to identified problems and developing project designs to address these solutions, including defining activities, outputs, and monitoring. The overall goal is to create manageable projects to improve the school and meet objectives.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 21

School Improvement Plan

Phase II
PHASE II: PLAN

DEPARTMENT OF EDUCATION 2
Phase 2: Plan Objectives

1. To review the general objectives and


targets;

2. To formulate solutions;

3. To develop and write the project


designs, SIP, and AIP

DEPARTMENT OF EDUCATION 3
Phase 2: Plan
Review general objectives
4 and targets

Formulate solution(s)
5

Develop Project Designs


6

Write the SIP


7

Prepare the AIP


8
DEPARTMENT OF EDUCATION 4
Step 4. Review general objectives and targets

Review general objectives and


targets set in Activity 3.1 - in Always go back to
light of the root cause analysis your general
presented by the Project Team objectives so you
to SPT will never lose sight
of your targets

DEPARTMENT OF EDUCATION 5
Step 4. Review general objectives and targets
Planning Worksheet (Annex 5)

Activity 2.2

Activity 3.1

Activity 3.1

Activity 3.6

DEPARTMENT OF EDUCATION 6
Step 4. Review general objectives and targets

OUTPUT CHECK:
 Root Cause column in the Planning Worksheet
[Annex 5]

DEPARTMENT OF EDUCATION 7
Phase 2: Plan
Review general objectives
4 and targets

Formulate solution(s)
5

Develop Project Designs


6

Write the SIP


7

Prepare the AIP


8
DEPARTMENT OF EDUCATION 8
Step 5. Formulate solution(s)

FOCUS AREA ROOT CAUSE SOLUTIONS

DEPARTMENT OF EDUCATION 9
Step 5. Formulate solution(s)
In formulating SOLUTIONS,
do not forget the following TIPS:

Address the Within the


ROOT control of the
CAUSE(S) school

With support from


Sustainable Economical the process owner
DEPARTMENT OF EDUCATION 10
Step 5. Formulate solution(s)

THINK OUTSIDE THE BOX BUT REMEMBER KEY


CONSIDERATIONS
DEPARTMENT OF EDUCATION 11
Step 5. Formulate solution(s)

OUTPUT CHECK:
 List of Possible Solutions

DEPARTMENT OF EDUCATION 12
Phase 2: Plan
Review general objectives
4 and targets

Formulate solution(s)
5

Develop Project Design(s)


6

Write the SIP


7

Prepare the AIP


8
DEPARTMENT OF EDUCATION 13
Step 6. Develop Project Design(s)

PROBLEM STATEMENT: The selected area of focus phrased as a


problem (output of Activity 3.5: Select Area of Focus).

Example: During the first quarter, 10 out of 30 Mathematical Periodical


Test papers of Grade 7 students had items that were erroneously
REMEMBER checked
these
definitions PROJECT OBJECTIVE STATEMENT: What you want to achieve and
by how much*.
when you fill-
up Annex 9 Example: To reduce the incidence of erroneously checked
(Project Work Mathematical Periodical Test papers of Grade 7 students by 100%
Plan &
*Reminder: Objective statements should be SMART – specific,
Budget measurable, attainable, realistic, time-bound. Targets to be set
Matrix) should be discussed and agreed upon by the SPT based on the
school context.

DEPARTMENT OF EDUCATION 14
Step 6. Develop Project Design(s)
One project design
per solution

ACTIVITIES: The activities you need to do to implement your


solution.
REMEMBER:
Example: Meet with teachers to discuss the new process of
These checking Periodical Test papers
definitions
when you OUTPUT: The concrete, tangible products that result from
fill-up Annex undertaking an activity .
9 (Project
Work Plan & Example: Teacher attendance during discussion of the new
Budget process on checking Periodical Test papers
Matrix)

DEPARTMENT OF EDUCATION 15
Step 6. Develop Project Design(s)
 Each project will be monitored at least twice by
the SPT - middle and end of implementation
period.
 Monitoring dates should be stated in the Project
Work Plan & Budget Matrix (Annex 9)

Make the projects manageable to


provide the team with immediate In cases
results which they where
there
can celebrate
are major
(if it is successful) projects that
would need a long time
or improve to implement, the
Project Team should
(if did not meet
subdivide this into
the target). smaller, more
manageable projects.

DEPARTMENT OF EDUCATION 16
Step 6. Develop Project Design(s)
For School Heads, Teachers,
and Staff

Your contribution in planning and implementing


the SIP and AIP should be included in your RPMS.

In writing your KRAs and objectives in the


RPMS, make sure it is aligned with the
objectives and targets of the SIP, AIP, and
Project Designs.

Attach a copy of the project designs to the AIP so you can easily
go back to it when you review the implementation of your AIP.

DEPARTMENT OF EDUCATION 17
Step 6. Develop Project Design(s)

DEPARTMENT OF EDUCATION 18
ACTIVITY:

DEVELOPING
PROJECT DESIGNS

DEPARTMENT OF EDUCATION 19
Instructions
1. Review the set objectives and targets for
the particular PIA you identified earlier.
2. Develop a project design for the specific
PIA by filling up this template:

DEPARTMENT OF EDUCATION 20
Step 6. Develop Project Design(s)

OUTPUT CHECK:
 Project Work Plan and Budget Matrix

DEPARTMENT OF EDUCATION 21

You might also like