BAUANG DIESEL POWER
PLANT
(SAN JUAN LA UNION)
Project Analysis
Project analysis slide 2
ANALYSIS SPECIFICATION
BAUANG
DIESEL
IMPLEMENT TESTING
POWER
PLANT
DESIGN CONCLUSION
Project Analysis
Project analysis slide 3
MARKET TECHNICAL FINANCIAL ECONOMIC ECOLOGICAL
ANALYSIS ANALYSIS ANALYSIS ANALYSIS ANALYSIS
Diesel power generation is Diesel power Answering the call of the Emissions from diesel
Lorem ipsum dolor sit
most appropriate as a generation is most Philippines government in engines contribute to the
amet, consectetur
standby source for the appropriate as a addressing the crippling production of
adipiscing elit, sed do
industrial sector. Generally, standby source for the power crisis of the early ground-level ozone which
eiusmod tempor
the industrial sector industrial sector. 1990s, the Manila Electric damages crops, trees and
incididunt ut labore et
consumes more power for its Generally, the industrial Co., First Philippines other vegetation. Also
dolore magna aliqua.
business operations. A diesel sector consumes more Holdings Corp., JG Summit produced is acid rain,
power engine offers better power for its business Holdings Corp. and PCI which affects soil, lakes
reliability and enhances the operations. A diesel Capital pooled their and streams and enters
quality of the power supply. power engine offers resources to incorporate the human food chain via
. better reliability and the First Private Power water, produce, meat and
enhances the quality of Corp. (FPPC) and build a fish. These emissions also
the power supply. $200 million, 235 MW contribute to property
. diesel power plant in damage and reduced
Bauang La Union. visibility.
ral gas as well. Project Analysis
INTRODUCTION:
For generation of electrical energy , a diesel
power station (also known as a standby
power station) employs a diesel engine as
prime mover.
To create electricity a diesel generator(DG)
(also known as a diesel generator set)
consist of a diesel engine and an electric
generator (typically an alternator). This is a
specific case of a generator engine.
However , certain models can run on liquid
fuels or natural gas as well
Project Analysis
BAUANG POWER
PLANT (HISTORY)
BAUANG Private Power Corporation (BPPC) has
turned over its 225-megawatt (MW) diesel bunker-
fired power plant in Bauang, La Union, to the
National Power Corporation (NPC) / Power Sector
Assets and Liabilities Management Corporation
(PSALM).
The formal turnover of the plant took place July 26,
2010, following the expiration of the 15-year
cooperation period covering the project. The plant,
which supplies electricity to the NPC, commenced
operations on July 25, 1995.
Considered one of the largest bunker-fired diesel
power generation facilities in the world, the plant is
located 255 kilometers north of Manila in
Payocpoc Sur, Bauang, La Union.
The Lopez Group, through First Private Power
Corporation (FPPC), developed the plant as a
response to the paralyzing power crisis that hit the
country in the early 90s. The plant’s establishment
signaled the Lopez Group’s re-entry into power
generation.
Project Analysis
BAUANG DIESEL POWER PLANT
PROJECT DESCRIPTION
• FPPC/BPPC was contracted to finance, build and operate a 215- megawatt base
load generating plant under a Fast-track Build Operate Transfer (BOT) arrangement
with the government. BPPC will operate and maintain the power plant complex for a
period of 15 years up to July 2010. Under the BOT Agreement, NPC shall supply the
fuel for energy conversion and purchase all electricity generated there from. For the
duration of the 15-year cooperation period, BPPC is entitled to payment of fixed
capacity and operations and maintenance fees based on the nominated capacity, as
well as energy fees based on kwh generated/delivered. Upon expiration of the 15-
year period, BPPC shall transfer to NPC all its rights, titles and interest in the power
plant complex, free of liens created by BPPC and without any compensation.
• The project was undertaken in line with the fast-track program of the government to
address the power crises of the 1990’s.
Project Analysis
BAUANG DIESEL POWER PLANT
PROJECT COST
• USD 200.00 Million
PROCUREMENT MODE
• Solicited
PPP STRUCTURE
• Build-Operate-Transfer (BOT
COOPERATION PERIOD
•15 Years
REGION
•REGION I - ILOCOS
SECTOR
• Power
PRIVATE PROPONENT
• First Private Power Corporation (FPPC); Bauang Private Power Corporation (BPPC)
Project Analysis
LOCATION MAP
LANDUSE Industrial
Bauang Diesel Power
NAME
Plant
1590 Energy
OPERATOR
Corporation
OWNER Vivant
PLANT:METHOD Combustion
PLANT:OUTPUT:ELEC 255 Mw
TRICITY
PLANT:SOURCE Diesel
Thank You