Subbase and Base Course
Subbase and Base Course
BASE COURSE
ITEM 200:
AGGREGATE
SUBBASE COURSE
ITEM 200:
AGGREGATE
SUBBASE COURSE
• This item shall consist of furnishing, placing and compacting an aggregate sub-
base course on a prepared subgrade in accordance with this Specification and the
lines, grades and cross-sections shown on the Plans, or as directed by the Engineer.
ITEM 200:
EQUIPMENT
REQUIREMENTS:
• Road Grader with Scrapper (GD51 A-1)
• Vibratory Drum Roller (BW151AC)
• Water Truck (500-1000 gal.)
• Minor Tools
ITEM 200:
MATERIAL
REQUIREMENTS:
• Aggregate for subbase shall consist of hard, durable particles or fragments of
crushed stone, crushed slag, or crushed or natural gravel and filler of natural or
crushed sand or other finely divided mineral matter. The composite material shall
be free from vegetable matter and lumps or balls of clay, and shall be of such nature
that it can be compacted readily to form a firm, stable subbase.
Preparation of Existing
Surface
The existing surface shall be graded and finished
as provide under Item 105, Subgrade Preparation,
before placing the subbase material.
CONSTRUCTION
PROCEDURE:
• The aggregate subbase material shall be placed at
a uniform mixture on a prepared subgrade in a
quantity which will provide the required compacted
thickness.When more than one layer is required,
each layer shall be shaped and compacted before
the succeeding layer is placed.
CONSTRUCTION
PROCEDURE:
• The placing of material shall begin at the point
designated by the Engineer. Placing shall be
from vehicles especially equipped to distribute
the material in a continuous uniform layer or
window. The layer or window shall be of such
size that when spread and compacted, the
finished layer shall be in reasonably close
conformity to the nominal thickness shown on
the Plans.
CONSTRUCTION
PROCEDURE:
• When hauling is done over previously placed
material, hauling equipment shall be dispersed
uniformly over the entire surface of the previously
constructed layer, to minimize rutting or uneven
compaction.
CONSTRUCTION
PROCEDURE:
• Provide blue—top of every 20 meters interval
(marked staked)
• Along curbs, headers and walls, and at all places not accessible to the
roller, the subbase material shall be compacted thoroughly with
approved tampers or compactors.
TOLERANCES
Permitted variation from design THICKNESS OF LAYER ± 20 mm
AGGREGATE BASE
COURSE
ITEM 201:
AGGREGATE BASE
COURSE
• In flexible pavement, aggregate base course is the load-carrying portion and
provides the structural capacity to bituminous concrete slabs by carrying the load
and distribute it to the soil under the layers of asphalt concrete.
• The aggregate sub-base course is made of materials with a relatively lower load bearing
capacity while the aggregate base course is made of high quality material with a higher load
bearing capacity.
ITEM 201:
EQUIPMENT REQUIREMENTS:
• Road Grader with Scrapper (GD51
A-1)
• Vibratory Drum Roller
(BW151AC)
• Water Truck (500-1000 gal.)
• Minor Tools
CONSTRUCTION PROCEDURE:
• If filler, in addition to that naturally present, is necessary for meeting the grading requirements or for
satisfactory bonding, it shall be uniformly blended with the base course material on the road or in a
pugmill unless otherwise specified or approved. Filler shall be taken from sources approved by the
Engineer, free from hard lumps and shall not contain more than 15 percent of material retained on the
4.75 mm (No. 4) sieve.
ITEM 201:
TOLERANCES
Permitted variation from design THICKNESS OF LAYER ± 10 mm
Non-conformance to the blue tapping. To provide blue tapping for vertical control.
Conformance of in-placed materials to plans and To compact loose subbase materials to the required
specifications. density and handpick oversize aggregates.
Non-conformance to the blue topping. To provide blue tapping for vertical and
horizontal control.