Laporan Asset Wellness Reliabilty Adp Omu Week 11

1. The weekly report summarizes the reliability and asset wellness of the ADP OMU power plant for Week 11. 2. There are 4 assets with red status (in the top 30% ACR) and 14 assets with yellow status (13 in the top 30%). 3. The top 3 critical assets are divided among 5 areas: Common, Unit, Ash Handling, BOP, and Coal.

Uploaded by

Luqman Hakim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
301 views35 pages

Laporan Asset Wellness Reliabilty Adp Omu Week 11

1. The weekly report summarizes the reliability and asset wellness of the ADP OMU power plant for Week 11. 2. There are 4 assets with red status (in the top 30% ACR) and 14 assets with yellow status (13 in the top 30%). 3. The top 3 critical assets are divided among 5 areas: Common, Unit, Ash Handling, BOP, and Coal.

Uploaded by

Luqman Hakim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 35

WEEKLY REPORT

RELIABILITY Week 11
ADP OMU
16 Maret 2022 660MW
Tamplate Laporan Weekly Report AW
1. Executive summary
2. Trending asset wellness TOP 30% ACR
3. Plant healtiness
4. Dashboard asset wellness
5. Top 3 critical asset
6. Reliability block diagram
7. Program kerja minggu ini
8. Program kerja minggu depan
9. Monitoring progress asset TOP 30% ACR (Status merah)
10. Monitoring progress asset TOP 30% ACR (Status kuning)
11. Tabel monitoring RCFA
12. Monitoring progress RCFA
13. Monitoring status FDT RCFA
14. Chart monitoring FDT RCFA
15. Tindak lanjut rekomendasi
16. Review rekomendasi REOC (Unit yang sudah ada fasilitas)
17. Update FMEA, Referensi FMEA sesuai dengan Master FMEA Asset Level A 2020

Strictly Confidential 2
01 Executive summary Coal Handling

STATUS ASSET Progress


No EQUIPMENT ACTION PLAN TARGET SELESAI
WELLNESS (%)

1 (Eq) SHIP UNLOADER A (SU 2) PRIMA

2 (Eq) SHIP UNLOADER B (SU 1) PRIMA

1. Vibrasi tinggi 3,54
3 (Eq) BELT CONVEYOR  RENTAN 90%
mm/s pada motor Belt Conveyor 1A

4 (Eq) STACKER RECLAIMER (STRE) PRIMA

5 (Eq) MAGNETIC SEPARATOR PRIMA

6 (Eq) DUST COLLECTOR BC PRIMA

7 (Eq) COAL SAMPLER PRIMA  

8 (Eq) CRUSHER RENTAN Fluid coupling crusher B rusak 30%

RENTAN Penggantian block engine
(Eq) BULDOZER, EXCAVATOR,  BULDOZER (SD32) HYDRAULIC EXCAVATOR
9 Perbaikan Engine SD 16
TRACTORS, WHEEL LOADER BULDOZER (SD16) 100%
TRACTORS C Penggantian Component

PRIMA RENTAN KRITIS

Strictly Confidential 3
1. Executive Summary

 Kondisi asset PLTU per Week 11:


Asset status Merah sebanyak : 4 asset ( 4 asset masuk 30% ACR)
Asset status Kuning sebanyak : 14 asset ( 13 asset masuk 30% ACR)
 Top 3 Critical Asset ADP OMU dibagi menjadi 5 Area yaitu area Common, Unit, Ash
Handling, BOP dan Coal akan dipaparkan pada Slide berikutnya
 Program kerja penyehatan asset Week 11 : 2
 (Root Cause Failure Analysis sampai dengan Week 11, 16 Maret 2022 berjumlah 9 RCFA
dengan status 5 CLOSE, 1 ENGDONE, 3 FDTOK & 1 WAPPR
 Progres FDT RCFA sampai dengan Week 11, 16 Maret 2022 dengan status 38 CLOSE
 Update FMEA pada asset level A: HP Turbin, IP Turbin, LP Turbine, Generator & GT

Strictly Confidential 4
2. Trending Asset Wellness TOP 30% ACR
WELLNESS W10 W11 KETERANGAN
HIJAU 225 240 ↑
Workshop SERPMPI
KUNING 13 14 ↑ Perubahan Asset 30%
↑ Rank ACR
MERAH 2 4

16 245

14 14 14
241
14
13 13 13 13 240
12 12
12
11 11
235
10

8 230
228 228
226 226 226 226
6 225 225 225 225
225
4
4

2 2 2 2 220
2
1 1 1 1 1 1

0 215
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

WEEK 01 sd WEEK 11 HIJAU KUNING MERAH

Strictly Confidential 5
3. Plant Healtiness ADP OMU

MATRIX HEALTHINESS
70 ≤ X ≤
4 4 8 12
100
ACR

40 ≤ X < 70 3 3 6 9
20 ≤ X < 40 2 2 4 6
X < 20 1 1 2 3 ADIPALA OMU Week 11
1 2 3 STATUS PLANT
Hijau Kuning Merah AREA
Kriteria Asset Wellness HELTHINESS
  (Condition Status)
ADIPALA COMMON PRIMA
Healthy Level Nilai PH ADIPALA UNIT 1 SEHAT
Kritis 10-12 ASH HANDLING PRIMA
BALANCE OF
Rentan 7-9 PRIMA
PLANT
Sehat 5-6
COAL HANDLING SEHAT
Prima 1-4

Strictly Confidential 6
4. Dasboard Asset Wellness
A SSE T WEL LNE SS 100% AC R
A S S E T W E L L N E S S 3 0% A C R
HIJAU; 613

HIJAU; 242

K
U
M N K
E I U
R N M N
A G E I
HIJAU KUNING H ;
R N
;
A G
1
HIJAU KUNING H ;
4 4
;
1
4 3

ASSET WELLNESS ASSET WELLNESS


100% ACR Jumlah 30% ACR Jumlah
HIJAU 613 HIJAU 242
KUNING 14 KUNING 13
MERAH 4 MERAH 4
AP00 AP01 AP0A AP0B AP0C AP00 AP01 AP0A AP0B AP0C
Area Common UniT Ash BOP Coal Area Common Unit Ash BOP Coal
Merah 0 1 0 0 3 Merah 0 1 0 0 3
Kuning 3 7 1 0 3 Kuning 3 6 1 0 3
Hijau 83 321 29 113 67 Hijau 30 144 13 26 29
Total Aset 86 329 30 113 73 Total Aset 33 151 14 26 35

Strictly Confidential 7
5. Top 3 Critical Asset
Asset Critical Unit
ASSET CRITICAL UNIT

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP10HLB10AN002- (Eq) PRIMARY AIR FAN B (PAF B) Operasi dengan Vibrasi diatas 4 rms Operasikan dengan mode manual, lakuka Continue Monitoring HMU ADP21/21923 30 June 2022
001 KUNING n internal cek
(ACR = 40,77)
AP10HFC30AJ001- (Eq) PULVERIZER/MILL C Temp mill tinggi saat stop karena Shut off damper Perbaikan shut off damper HMU 31 March 2022
001 KUNING  tidak rapat Inprogress Perbaikan ADP22/11554
(ACR = 38,25)
AP10LAC21AP010- (Eq) MOTORIZED BOILER FEED PU Terjadi leakout pada Packing atau Mechanical sea Penggantian packing atau mechanical sea HMU 31 March 2022
001 MP (MBFP) KUNING l sisi Inboard (DE) l Inprogress Perbaikan & Penggantian ADP21/21454
(ACR = 40,77)

Asset Critical Coal Handling


ASSET COAL HANDLING

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP00EAF10AF001- (Eq) STACKER RECLAIMER (STRE) grating area limit switch dekat tangga stre korosi  Penggantian Packing atau mechanical sea EP 30 June 2022


001 KUNING parah, sempat ambrol saat diinjak l Booster MBFP sisi DE Inprogress Perbaikan & Penggantian ADP22/11002
(ACR = 34,86)
AP00EAC11AF004- (Eq) BELT CONVEYOR 4A (BC 4A) Cover BC4A sebagian besar sudah korosi dan sud Lakukan perbaikan/penggantian Waiting Material EP ADP21/10547 31 March 2022
001 KUNING ah rusak Pergantian total :
(ACR = 34,84) Cover BC4A
AP00EAC11AF001- (Eq) BELT CONVEYOR 1A (BC 1A) Vibrasi tinggi pada motor Belt Conveyor 1A Lakukan perbaikan / alignment Waiting Conditional, akan di kerjakan EP ADP20/22667 30 June 2022
001 KUNING saat MO
(ACR = 34,84)

Strictly Confidential 8
5. Top 3 Critical Asset
Asset Critical Common
ASSET CRITICAL COMMON

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP00UEA02-001 (Eq) COAL SHED STRUCTURE Atap coal shed Sisi barat selatan rusak parah Demolish Coal shed Menunggu anggaran Demolish SARANA ADP21/17297 31 December 2022
(ACR = 17,87) KUNING
AP00UEF02-001 (Eq) TRANSFER TOWER HOUSE 2  Dinding / clading Transfer Tower 2 korosi parah Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17198 30 June 2022
(ACR = 17,87) STRUCTURE dan beberapa sudah mulai lepas Pergantian total :
KUNING Cladding, rangka cladding, material
jendela
AP00UEF03-001 (Eq) TRANSFER TOWER HOUSE 3  Dinding / clading Transfer Tower 2 korosi parah Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17133 30 June 2022
(ACR = 17,87) STRUCTURE dan beberapa sudah mulai lepas Pergantian total :
KUNING Cladding, rangka cladding, material
jendela

Asset Critical BOP


ASSET CRITICAL BOP

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

Strictly Confidential 9
6. RBD OMU

Site : PLTU ADIPALA 1X660 MW


System : PLTU Site : Reliability
Periode MPI : 2020 Owner : Agus Aopik
Tanggal : 16 September 2016
Tanggal revisi : 5 September 2021

Number System
1 : 2 3 4 5 6 7 8 9 10 11 12
CLOSED CIRCULATING
FIRE PROSES ELECTRICAL EMERGENCY ELECTRICAL & CIRCULATING GENERAL AIR
COOLING WATER FUEL OIL AUXILIARY CONDENSATE
PROTECTION PROTECTION PROTECTION POWER SUPPLY CONTROL WATER CONTROL
Nama SYSTEM
Nama SYSTEM (I&C)
Nama SYSTEM
Nama SYSTEM
Nama SYSTEM
Nama SYSTEM
Nama WATER Nama SUPPLY
Nama TREATMENT Nama SYSTEM Nama BOILER SYSTEM Nama SYSTEM
SYSTEM SYSTEM
R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t)
0,9999999999 0,998001999 0,996506118 0,998001999 0,997503122 0,996989912 0,999749719 0,999999625 0,999749719 0,999415901 0,776273789 0,997253466
MAIN PROSES

23 22 21 20 19 18 17 16 15 14 13
ASH & SLAG BUNKER, SOLID
PLTU POWER
GENERATOR
STEAM
REMOVAL MAIN BOILER
COMBUSTION
FEEDER AND FUEL/COAL
HEAT GENERATION
PRESSURE SYSTEM, FEEDWATER
TRANSMISION TURBINE STEAM SYSTEM AIR FLUE GAS
Nama SYSTEM Nama SYSTEM
Nama PLANT SYSTEM Nama SYSTEM
Nama Nama HANDLING Nama FIRING SYSTEM Nama SYSTEM
Nama PULVERIZING Nama HANDLING Nama FEEDWATER AND
STEAM SECTION
Nama SYSTEM
SYSTEM SYSTEM SYSTEM
R(t) seri R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t)
0,506626955 0,998667112 0,995675268 0,983716697 0,998001999 0,965283173 0,996007879 0,711829639 0,999958587 0,999247349 0,997253778 0,997004496

0.60 < RI < 0.80 Good 0.40 < RI < 0.6 Quite 0.20 < RI < 0.40 Poor

Strictly Confidential 10
7. Program kerja
Minggu Ini : 2

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP10HFC30AJ001-001 (Eq) PULVERIZER/MILL C Temp mill tinggi saat stop karena Shut off damper tidak Perbaikan shut off damper HMU 31 March 2022


(ACR = 38,25) KUNING  rapat Inprogress Perbaikan ADP22/11554

AP10LAC21AP010- (Eq) MOTORIZED BOILER FEED PUMP  Terjadi leakout pada Packing atau Mechanical seal sisi I Penggantian packing atau mechanical seal HMU 31 March 2022


001 (MBFP) nboard (DE) Inprogress Perbaikan &
KUNING ADP21/21923
(ACR = 40,77) Penggantian

Strictly Confidential 11
8. Program kerja
Minggu Depan : 2

KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP10HFC30AJ001-001 (Eq) PULVERIZER/MILL C Temp mill tinggi saat stop karena Shut off damper tidak Perbaikan shut off damper HMU 31 March 2022


(ACR = 38,25) KUNING  rapat Inprogress Perbaikan ADP22/11554

AP10LAC21AP010- (Eq) MOTORIZED BOILER FEED PUMP  Terjadi leakout pada Packing atau Mechanical seal sisi I Penggantian packing atau mechanical seal HMU 31 March 2022


001 (MBFP) KUNING nboard (DE) Inprogress Perbaikan & Penggantian ADP21/21923
(ACR = 40,77)

Strictly Confidential 12
Monitoring Progress Asset TOP 30% ACR
Status Merah
KKS Asset Description Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP10HFC36AP001-001 (Eq) PULVERIZER/ Silinder hidrolik dalam perbaikan Perbaikan silinder hidrolik dan Pemeliharaan sy Silinder hidrolik dalam perbaikan HMU ADP21/19386 31 March 2022
(ACR = 26,21) MILL C HYDRAULIC OIL PUMP stem Hidrolik

AP00EAE10AE001-001 (Eq) BULDOZER 1 COAL HANDLING (SD32) Block Engine Shantui SD32 pecah Lakukan perbaikan / penggantian Component Waiting Material EP ADP20/11347 30 June 2022
(ACR = 24,13) Engine Assy Bulldoser Shantui SD 32

AP00EAE10AE002-001 (Eq) BULDOZER 2 COAL HANDLING (SD16) Engine SD 16 bocor Penggantian/perbaikan engine yang bocor menunggu anggaran EP ADP20/12978 30 June 2022


(ACR = 24,13)

AP00EAE20AE003-001 (Eq) TRACK TYPE TRACTORS C Fluid coupling crusher B rusak Lakukan perbaikan / penggantian Inprogressperbaikan / penggantian EP ADP22/12802 31 March 2022


(ACR = 24,13)

Strictly Confidential 13
10. Monitoring Progress Asset TOP 30% ACR
Status Kuning
KKS Asset Description Condition Recommendation/due date Program PROGRESS PIC WO Due date Program

AP10HLB10AN002-001 (Eq) PRIMARY AIR FAN B (PAF B) Operasi dengan Vibrasi diatas 4 rms Operasikan dengan mode manual, lakukan int Continue Monitoring HMU ADP21/21923 30 June 2022
(ACR = 40,77) ernal cek

AP10HFC30AJ001-001 (Eq) PULVERIZER/MILL C Temp mill tinggi saat stop karena Shut off damper tida Perbaikan shut off damper HMU 31 March 2022


(ACR = 38,25) k rapat Inprogress Perbaikan ADP22/11554

AP10LAC21AP010-001 (Eq) MOTORIZED BOILER FEED PUMP (M Terjadi leakout pada Packing atau Mechanical seal sisi I Penggantian packing atau mechanical seal HMU 31 March 2022


(ACR = 40,77) BFP) nboard (DE) Inprogress Perbaikan & Penggantian ADP21/21923

AP00EAF10AF001-001 (Eq) STACKER RECLAIMER (STRE) grating area limit switch dekat tangga stre korosi parah Penggantian Packing atau mechanical seal Bo EP 30 June 2022


(ACR = 34,86) , sempat ambrol saat diinjak oster MBFP sisi DE Inprogress Perbaikan & Penggantian ADP22/11002
AP00EAC11AF004-001 (Eq) BELT CONVEYOR 4A (BC 4A) Cover BC4A sebagian besar sudah korosi dan sudah rus Lakukan perbaikan/penggantian Waiting Material EP ADP21/10547 31 March 2022
(ACR = 34,84) ak Pergantian total :
Cover BC4A
AP00EAC11AF001-001 (Eq) BELT CONVEYOR 1A (BC 1A) Vibrasi tinggi pada motor Belt Conveyor 1A Lakukan perbaikan / alignment Waiting Conditional, akan di kerjakan saat EP ADP20/22667 30 June 2022
(ACR = 34,84) MO
AP10HCB17AT101-001 (Eq) LONG SOOT BLOWER LEFT SIDE Lance tube SB L5 indikasi bengkok di ujung Penggantian lance tube SB L5 indikasi Waiting Material HMU ADP20/17694 30 June 2022
(ACR = 23,91) BOILER LANTAI 9,5 & 10 bengkok di ujung

AP10HDE10AT001-001 (Eq) ELECTROSTATIC PRECIPITATOR A (ES Clading ESP A sisi timur hampir lepas Penggantian Bearing Inboard Pump B Waiting Material EP ADP22/10734 29 June 2022


(ACR = 23,07) P A)

AP10PUE20AP001B-001 (Eq) CONDENSER VACUUM PUMP B Indikasi Kerusakan Bearing Inboard Pump Penggantian Bearing Inboard Pump B Waiting Material HMU ADP22/10735 30 June 2022
(ACR = 24,14)

AP00UEA02-001 (Eq) COAL SHED STRUCTURE Atap coal shed Sisi barat selatan rusak parah Demolish Coal shed Menunggu anggaran Demolish SARANA ADP21/17297 31 December 2022
(ACR = 17,87)
AP00UEF02-001 (Eq) TRANSFER TOWER HOUSE 2 STRUCT Dinding / clading Transfer Tower 2 korosi parah dan Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17198 30 June 2022
(ACR = 17,87) URE beberapa sudah mulai lepas Pergantian total :
Cladding, rangka cladding, material jendela
AP00UEF03-001 (Eq) TRANSFER TOWER HOUSE 3 STRUCT Dinding / clading Transfer Tower 2 korosi parah dan Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17133 30 June 2022
(ACR = 17,87) URE beberapa sudah mulai lepas Pergantian total :
Cladding, rangka cladding, material jendela

AP10HFC16AP001-001 (Eq) PULVERIZER/ Press HOP Rendah (3 MPa) Pengetesan HOP, Perbaikan SIlinder piston, Cl Waiting Condition HKI ADP22/12166 30 June 2022
(ACR = 26,21) MILL A HYDRAULIC OIL PUMP eaning Line Hydrolic

Strictly Confidential 14
11. Tabel Monitoring RCFA

PANTAUAN RCFA

CLOSE VEROK APPR KAJDONE FDTOK VERNOTOK KAJIANOK WAPPR ENGDONE WAPPR

Strictly Confidential 15
12. Monitoring progress RCFA 2021

Description Problem No. RCFA Description Asset Description RCFA Status

GANGGUAN PRIMARY AIR FAN B VIBRASI TI 37/RCFA/ADPOMU/I/2021 (Eq) PRIMARY AIR FAN B (PAF B) RCFA GANGGUAN PRIMARY AIR FAN B VIBRASI TINGGI CLOSE


NGGI
GANGGUAN STRE TRIP TANPA INDIKASI ALA 38/RCFA/ADPOMU/II/2021 (Eq) STACKER RECLAIMER (STRE) RCFA GANGGUAN STRE TRIP TANPA INDIKASI ALARM FDTOK
RM

GANGGUAN BC 1A & 1B TRIP TANPA INDIKA 39/RCFA/ADPOMU/II/2021 (Eq) BELT CONVEYOR 1A (BC 1A) RCFA GANGGUAN BC 1A & 1B TRIP TANPA INDIKASI ALARM FDTOK


SI ALARM
GANGGUAN ALL MILL TRIP DAN UNIT TRIP 40/RCFA/ADPOMU/II/2021 (Eq) PULVERIZER/MILL C RCFA GANGGUAN ALL MILL TRIP DAN UNIT TRIP CLOSE
GANGBELT CONVEYOR 3 SOBEK SEPANJANG  41/RCFA/ADPOMU/II/2021 (Eq) BELT CONVEYOR 3 (BC 3) RCFA BELT CONVEYOR 3 SOBEK SEPANJANG BELT ENGDONE
BELT
Gangguan Lube Oil Turbine Pressure Low, 42/RCFA/ADPOMU/III/2021 (Eq) MAIN LUBE OIL TANK RCFA LUBE OIL TURBINE PRESSURE LOW (EMERGENCY MANUAL TRIP) CLOSE
Penyebab dari Pressure Lube oil drop pipa
pecah pada line injector lube oil didalam
MOT
Kebocoran Condenser 43/RCFA/ADPOMU/IV/2021 (Eq) CONDENSER B RCFA GANGGUAN KEBOCORAN KONDENSER A & B CLOSE
Gangguan Mechanical Seal 44/RCFA/ADPOMU/VII/2021 (Eq) BOILER FEED PUMP TURBINE B (BFPT B) RCFA GANGGUAN MECHANICAL SEAL BOILER FEED PUMP TURBINE B (BFP CLOSE
T B)
Gangguan Ducting PA Fan rusak 45/RCFA/ADPOMU/IX/2021 (Eq) PULVERIZER/MILL E RCFA GANGGUAN ALL MILL KARENA DUCTING PA FAN RUSAK FDTOK
Motor APH Over Current 001/RCFA-P/ADP/2021 (Eq) AIR PREHEATER B (APH B) RCFA Gangguan APH B WAPPR

Strictly Confidential 16
13. Monitoring FDT RCFA 37/RCFA/ADPOMU/I/2021
RCFA GANGGUAN PRIMARY AIR FAN B VIBRASI TINGGI

FDT Number DESCRIPTION Task Type Frequency PIC Related doc (WO/JP/etc) Progress Due Date
1 Melakukan Pengecekan dan setting Bearing OH SI HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022
003
3 Melakukan pengecekan grounding dan perbaikan groun OH SE HKI AP-JP-HM-SE-HLB-001 CLOSE Jumat, 30 April 2021
ding
4 Melakukan pengecekan sensor vibrasi dan perbaikan OH SI HKI AP-JP-HM-SI-HLB-001 CLOSE Jumat, 30 April 2021

5 Melakukan pengecekan dan setting bearing OH SE HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022


003
6 Pengecekan Damper PAF OH SI HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022
003
7 Pengecekan Control Damper Mill OH SI HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022
003
8 Penggantian/Cleaning Filter Lube Oil PAF PM 4W HMU AP-JP-HM-4W-HLB-0002 CLOSE Senin, 16 Maret 2021

9 Purifikasi Lube Oil PAF OH SI HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022


001

Strictly Confidential 17
13. Monitoring FDT RCFA 38/RCFA/ADPOMU/II/2021
RCFA GANGGUAN STRE TRIP TANPA INDIKASI ALARM

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Kabel Komunikasi Modbuss PLC Putus CM SE HKI ADP21/11512 CLOSE Rabu, 30 Juni 2021

02 Isolasi Kabel Komunikasi getes CD Y4 HKI ADP/LCM/23/0001 CLOSE Rabu, 30 Juni 2021

03 Task Pengecekan Rutin kabel/ Line kabel Komunikasi PLC PM 4W HKI AP-JP-HK-4W-EAF-0001 CLOSE Senin, 16 Maret 2021


 belum ada

Strictly Confidential 18
13. Monitoring FDT RCFA 39/RCFA/ADPOMU/II/2021 RCFA
GANGGUAN BC 1A & 1B TRIP TANPA INDIKASI ALARM

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
1 Pengecekan Digital Ouput (I/ PM Y2 HKI No dokumen patrol ch CLOSE Rabu, 30 Juni 2021
O) untuk Perintah start Stop BC 01A dan 01B, pengganti eck lokal 1 : ADP.04.06
an Card I/O PLC jika ada indikasi Abnormal/ Rusak .011
2 Lakukan rutin pengecekan dan Cleaning Koneksi Relay,  PM 4W HKI AP-JP-HK-4W-EAC- CLOSE
Kabel Kontrol, Socket Relay & Lakukan Penggantian Rela 0002
y dan Socket Relay yang rusak/ Korosif.
3 Tegangan Supply Control 24 VDC Drop. Lakukan Pengec PM 4W HKI AP-JP-HK-4W-EAC- CLOSE Selasa, 04 Januari 2022
ekan Kekencangan Terminasi kabel Power, Penggantian  0002
Kabel dan Terminal jika ada temuan Rusak
4 Tegangan Supply Control 24 VDC Drop, Modul Power Su PM 4W HKI AP-JP-HK-4W-EAC- CLOSE Selasa, 04 Januari 2022
pply Rusak. Lakukan rutin pengecekan Tegangan Ouput  0002
Modul
5 Pengecekan Digital Ouput (I/ PM Y2 HKI AP-JP-HKI-SI-CXA-001 CLOSE Selasa, 04 Januari 2022
O) untuk Perintah start Stop BC 01A dan 01B, pengganti
an Card I/O PLC jika ada indikasi Abnormal/ Rusak

Strictly Confidential 19
13. Monitoring FDT RCFA 40/RCFA/ADPOMU/II/2021
RCFA GANGGUAN ALL MILL TRIP DAN UNIT TRIP

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Review SOP/IK Coal Bleding REVIK OP IK.ADP.04.02.012 CLOSE Rabu, 30 Juni 2021

02 Melakukan pemantauan kondisi peralatan lokal, apabila REVSOP OP IK.ADP.05.01.134 CLOSE Rabu, 30 Juni 2021


 memungkinkan dibuat SOP penggunaan bahan bakan 
minyak untuk kondisi emergency

03 Melakukan pemantauan kondisi batubara di coal feeder REVIK OP IK.ADP.05.01.134 CLOSE Rabu, 30 Juni 2021


 pada saat hujan Membuat Review SOP/
IK pembongkaran batubara dengan mempertimbangka
n kondisi cuaca
04 Melakukan patrol pemantauan kondisi batubara di coal  REVIK OP ADP.05.01.011 CLOSE Rabu, 30 Juni 2021
feeder tiap 2 jam

06 Memastikan kualitas dan kondisi batubara yang diumpa REVSOP OP IK.ADP.04.06.067 CLOSE Rabu, 30 Juni 2021


nkan ke dalam bunker, apabila memungkinkan dibuat st
andart sesuai kesepakatan
05 Melakukan Pengecekan Conveyor dan kondisi batubara  REVIK OP ADP.04.06.012 CLOSE Rabu, 30 Juni 2021
yang dimasukan bunker, di informasikan ke operator un
it

Strictly Confidential 20
13. Monitoring FDT RCFA 41/RCFA/ADPOMU/II/2021 RCFA
BELT CONVEYOR 3 SOBEK SEPANJANG BELT

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
1 Pembuatan PM 12W Lining Plate PM 12W AMA AP-JP-HM-12W-EAF- CLOSE Selasa, 04 Januari 2022
0001

2 Penggantian Baut Linning Plate OH Y2 AMA AP-JP-HMCA-SE MIN- CLOSE Selasa, 04 Januari 2022


HCB-0003
3 Patrol ceck BC 3, Review Logsheet REVIK S1 OP No dokumen patrol ch CLOSE Rabu, 30 Juni 2021
eck lokal 1 : ADP.04.06
.011

Strictly Confidential 21
13. Monitoring FDT RCFA 42/RCFA/ADPOMU/III/2021
RCFA LUBE OIL TURBINE PRESSURE LOW (EMERGENCY MAN
UAL TRIP)

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
02 Melakukan Seeting Kembali Hanger tension OH OH HMU ADP21/16290 CLOSE Rabu, 30 Juni 2021

05 Permanen Repair pipa yang mengalami kerusakan (Wor CD OH HMU ADP21/16290 CLOSE Rabu, 30 Juni 2021


kshop)

01 Melakukan test NDT pada joint welding setiap segment  OH SE HMU AP-JP-HM-SI-MOT-001 CLOSE Rabu, 30 Juni 2021


pipa pada pelumasan dalam tangki MOT

Strictly Confidential 22
13. Monitoring FDT RCFA 44/RCFA/ADPOMU/VII/2021 RCFA
GANGGUAN MECHANICAL SEAL BOILER FEED PUMP
TURBINE B (BFPT B)

FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Realignment BFPT every OH, jika terjadi misalignment dilakukan re OH OH HMU AP-JP-HM-SE-LAC-002 CLOSE Jumat, 30 Juli 2021
alignment (standard 0,05).

02 Melakukan pemeriksaan Oring seal dan penggantian setiap SE, jika  OH SE HMU AP-JP-HM-SE-LAC-002 CLOSE Jumat, 30 Juli 2021


didapat kondisi oring sdh getas dan rusak dilakukan penggantian

03 Melakukan pemeriksaan Carbon seal face dan penggantian setiap S OH SE HMU AP-JP-HM-SE-LAC-002 CLOSE Jumat, 30 Juli 2021


E, jika sealface sdh mengalami penipisan +-
1,6mm harus dilakukan penggantian
04 Melakukan pemeriksaan Spring dan penggantian setiap SE, jika dite OH SE HMU AP-JP-HM-SE-LAC-002 CLOSE Jumat, 30 Juli 2021
mukan kondisi spring sdh tidak sama dilakukan penggantian

Strictly Confidential 23
14. Chart monitoring status FDT RCFA

PROGRESS FDT RCFA 2022 Week 11

CLOSE; 38

CLOSE ISSUED

Strictly Confidential 24
15. Tindak Lanjut Quick Review
Asset Wellness Week 11
No. Deskripsi Rekomendasi PGE Tidak Lanjut Rekomendasi
1 Kondisi asset PLTU Adipala per Week 10 : Akan ditindaklanjuti. Penyehatan aset memiliki beberapa kendala
AW Merah : 4 asset (1 asset masuk 30% ACR) trend merah naik antara lain waiting material, belum tersedianya anggaran dan
AW Kuning : 16 asset (13 asset masuk 30% ACR) trend kuning tetap. eksekusi membutuhkan unit stop. Detail program penyehatan
Komposisi AW W10 tetap seperti W9, agar terus dipertahankan lagi jangan sampai ada potensi terjadi aset telah disampaikan ke KP. review FMEA MS JP rutin dilakukan
penurunan keandalan sampai dengan jadual SE tahun 2022. setiap minggu untuk mengevalusai tactical maintenance.
Agar segera disusun program penyehatan dan review tactical maintenance serta memastikan scope SE th
2022

2 Plant Healthiness ADP W10 tetap agar terus dipertahankan lagi jangan sampai ada potensi terjadi penurunan Akan ditindaklanjuti. Penyehatan aset memiliki beberapa kendala
keandalan sampai dengan jadual SE tahun 2022. antara lain waiting material, belum tersedianya anggaran dan
Hal ini agar dilakukan review terhadap tactical maintenance dan segera disusun program kerja penyehatan eksekusi membutuhkan unit stop. Detail program penyehatan
aset telah disampaikan ke KP.
3 untuk asset BFPT B agar ditingkatkan lagi tactical maintenance dan FLM untuk mengecek kondisi hasil Akan ditindaklanjuti saat eksekusi.
perbaikan pasca kejadian kebocoran mechanical seal dan diharapkan tidak terjadi gangguan serupa sampai
dengan dilakukan pengecekan secara menyeluruh pada saat SE th 2022.
4 untuk asset BC 6A agar ditingkatkan lagi tactical maintenance dan FLM untuk mengecek kondisi hasil
penggantian belt dan diharapkan tidak terjadi gangguan serupa. Selain itu perlu dilakukan pengecekan juga di Akan ditindaklanjuti saat eksekusi.
BC yang lainnya.
5 Rincian RCFA Secara Maximo di W10 masih stagnan sbb : Akan ditindaklanjuti dengan memperbaiki RCFA yang belum
RCFA tahun 2020 sampai dengan W10 tahun 2022 berjumlah 6 RCFA dengan status sama seperti W1 : 4 sesuai dengan hasil verifikasi. RCFA 2020 status FDT OK (verifikasi
CLOSE, 1 VEROK, 1 VERNOTOK KP)
RCFA tahun 2021 sampai dengan W10 tahun 2022 berjumlah 10 RCFA dengan status sama seperti W1 : 5
CLOSE, 1 ENGDONE, 1 VERNOTOK, 2 FDTOK (1 KI, 1M), 1 WAPPR.
Untuk yang RCFA statusnya belum FDTOK atau VERNOTOK dan yang masih WAPPR (gangguan APH B) agar
segera difinalkan/direvisi sesuai dengan format baru DIPF dari RESP (Pak Wisnu cs) termasuk kejadian
gangguan yg terakhir.
Untuk RCFA gangguan BFPT agar segera dibuat agar tidak sampai terjadi gangguan berulang.

Strictly Confidential 25
1. Main Steam Temp Low - Status Close

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-07T22:47:12.087 Last Modified: 2022-03-08T04:59:04.313

Main Steam Temp Low, Rekomendasi:


 1. Pengaturan Udara Pembakaran, 2. Adjust Air Fuel ratio, 3. Run
Rekomendasi sudah dilakukan :
Sootblower with Intelligent System, 4. Ajust Spray
 1. 2.3. 4 Sudah
 Symton: Termonitor parameter main steam Temperature di bawah
10893 570 degC  Noted :
ambang batas optimal yaitu : 557
 Sudah dilakukan tindak lanjut untuk menaikkan main
 Diagnosys: Main steam temperature rendah akan menyebabkan
steam temperatur
siklus effisiensi tidak optimal
Strictly Confidential 26
2. Mill out temperatur Mill C high ( Mill kondisi stop ) – Status HOLD

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-08T09:31:56.123 Last Modified: 2022-03-08T10:21:56.657

Mill out temperatur Mill C high ( Mill kondisi stop ),


Rekomendasi: Rekomendasi sudah dilakukan :
 1. Tambah pembukaan cold damper, 2. Inspeksi Hot damper  1. pembukaan 65% , 2. sudah dilakukan
saat unit stop ( ada kemungkinan leak )  Noted :
10901 < 60 C
 Symton: Termonitor di PI Vision Mill out temperatur Mill C • Temperatur outlet mill C tinggi saat mill stop karena shut off
high ( Mill kondisi stop ) hot damper tidak bisa di close (seret), masih proses perbaikan
 Diagnosys: Beresiko BB yang didalam Mill terbakar , juga oleh pemeliharaan.
beresiko explosive Strictly Confidential 27
3. BFPT B Speed abnormal– Status Close

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-08T13:16:41.857 Last Modified: 2022-03-08T15:34:41.947
BFPT B Speed abnormal, Rekomendasi:
 1. Lakukan pengecekan sensor dan instrumentasi, 2. Buat
SR ke HKI apabila untuk perbaikan Rekomendasi sudah dilakukan :
 Symton: Termonitor parameter BFPT B Speed abnormal,  1. 2.DCS Normal
masih menunjukkan 3000 rpm, kondisi BFPT Stop  Noted :
10908 -
perbaikan • Penunjukan di DCS Normal, SPEED BFPT B 0 rpm Trend 7
 Diagnosys: Pembacaan parameter yang tidak sesuai hari menunjukkan tidak ada kenaikan speed BFPT > 0rpm
beresiko terjadi kesalahan analisa dan pengambilan (saat BFPT stop)
keputusan Strictly Confidential 28
4. Emisions Related – Status Close

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-09T17:44:19.133 Last Modified: 2022-03-10T09:08:09.437
Emisions Related (CO High), Rekomendasi:
 1. Lakukan pengecekan aktual dengan laboratorium/kimia sebagai
pembanding, 2. Cek sensor dan insturmentasi (lakukan kalibrasi bila
Rekomendasi sudah dilakukan :
tidak akurat), 3. Adjust Combustion Air bila aktual, 4. Buat SR ke pihak
 Sudah dilaksanakan
terkait bila abnormal
50  Noted :
10935  Symton: Termonitor parameter CEMS CO tinggi hingga > 1000 mg/m3
mg/Nm3 • Tranding selama 25 hari menunjukan sensor CO2
 Diagnosys:
terjadi 2 kali bad signal dan parameter cenderung
- CO yang tinggi mengindikasikan terjadinya pembakaran yang
flat / tidak bergerak
kurang sempurna karena kurangnya oksigen Strictly Confidential 29
- Pembacaan parameter yang tidak sesuai beresiko terjadi kesalahan
5. Boiler Metal Temperature (RH pipe temp) – Status HOLD

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-12T12:39:19.493 Last Modified: 2022-03-12T22:55:16.957
Boiler Metal Temperature (RH pipe temp), Rekomendasi:
 1. Cek instrument dan control, 2. Buat SR ke HKI apabila
sensor instrument Abnormal, 3. Kalibrasi instrument apabila
Rekomendasi sudah dilakukan :
abnormal.
 1. Belum cek. 2. Sudah, 3. Belum
10982  Symton: Termonitor Parameter temperatur RH pipe temp <621 C
 Noted :
29 Abnormal
• Normal
 Diagnosys: Pembacaan parameter yang tidak sesuai
beresiko terjadi kesalahan analisa dan pengambilan
keputusan. Strictly Confidential 30
6. Reheat Steam Temp – Status Close

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 3/12/2022 2:42:01 PM Last Modified: 3/12/2022 10:34:47 PM

Reheat Steam Temp, Rekomendasi: Rekomendasi sudah dilakukan :


 1. Adjust Combustion System,,2. Adjust Air Fuel ratio,3.  Sudah
Atur damper SOFA/OFA,4. Adjust Spray,5. Run Sootblower  Noted :
with Intelligent System. • Penurunan RH temperature terjadi setelah proses wall
10992 <621 C
 Symton: Termonitor di PI Vision parameter Reheat sootblower karena kotor, setelah dilakukan Long sootblower
Temperature di bawah ambang batas optimal yaitu : 553 0C temperature perlahan naik menuju normal Tindakan Operator:
 Diagnosys: Main steam temperature rendah akan 1. Menaikan coal flow coal feeder sisi atas 2. Bias minus
menyebabkan siklus effisiensi tidak optimal. Feed water 3. Naikan setting Overheat

7. Main Steam Temp Low – Status Close


Rekomendasi Dispatcher Target Tindak Lanjut Operator
ID Value
Last Updated : 3/12/2022 2:45:01 PM Last Modified: 3/12/2022 10:32:12 PM

Main Steam Temp Low, Rekomendasi:


Rekomendasi sudah dilakukan :
 1. Pengaturan Udara Pembakaran, 2. Adjust Air Fuel ratio, 3.
 1. Menaikan coal flow coal feeder sisi atas 2. Bias minus Feed
Run Sootblower with Intelligent System, 4. Ajust Spray
water 3. Naikan setting Overheat
 Symton: Termonitor parameter main steam Temperature di
10993 <621 C  Noted :
bawah ambang batas optimal yaitu : 552 degC.
• Penurunan MS temperature terjadi setelah proses wall
 Diagnosys: Pembacaan parameter yang tidak sesuai
sootblower karena kotor, setelah dilakukan Long sootblower
beresiko terjadi kesalahan analisa dan pengambilan
temperature perlahan naik menuju normal
keputusan. Strictly Confidential 31
8. Boiler Metal Temperature (PSH outlet metal temp) – Status RE-OC EVA

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-13T13:45:07.25 Last Modified: 2022-03-13T20:42:44.113
Boiler Metal Temperature (PSH outlet metal temp),
Rekomendasi:
 1. Cek instrument dan control, 2. Buat SR ke HKI apabila
sensor instrument Abnormal, 3. Kalibrasi instrument apabila Rekomendasi sudah dilakukan :
abnormal  Ya
11010 <580
 Symton: Termonitor Parameter psh outlet metal temp #26  Noted :
Abnormal/ sempet turun • Hasil pemantauan parameter masih normal
 Diagnosys: Pembacaan parameter yang tidak sesuai
beresiko terjadi kesalahan analisa dan pengambilan Strictly Confidential 32
keputusan
9. Boiler Metal Temperature (SSH) – Status RE-OC EVA

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-13T13:51:47.47 Last Modified: 2022-03-13T20:45:07.037
Boiler Metal Temperature (SSH), Rekomendasi:
 1. Cek instrument dan control, 2. Buat SR ke HKI apabila
sensor instrument Abnormal, 3. Kalibrasi instrument apabila Rekomendasi sudah dilakukan :
abnormal.  Ya
11011  Symton: Termonitor di PI Vision Parameter ssh tube #17 <621 C  Noted :
Abnormal ( flat terus ) • Temperatur upnormal karena lebih rendah dari pada yang
 Diagnosys: Pembacaan parameter yang tidak sesuai lainnya
beresiko terjadi kesalahan analisa dan pengambilan
keputusan Strictly Confidential 33
10. Main Steam Spray– Status RE-OC EVA

Rekomendasi Dispatcher Target Tindak Lanjut Operator


ID Value
Last Updated : 2022-03-13T15:34:43.503 Last Modified: 2022-03-13T20:49:42.243

Boiler Metal Temperature (SSH), Rekomendasi: Rekomendasi sudah dilakukan :


 1. Pengaturan Udara Pembakaran, 2. Adjust Air Fuel ratio, 3.  Sudah
Ajust Spray, 4. Run Sootblower with Intelligent System.  Noted :
 Symton: Termonitor di PI Vision flow Main steam spray 10 • Sedang proses naik beban dari TML ke Full Load sehingga
11017
mengalami kenaikan yg significant. Ton/h boiler cenderung panas untuk mengejar setting main steam
 Diagnosys: Main steam spray tinggi menyebabkan siklus press dan temperature Dilakukan Proses Sootblower All Area
effisiensi tidak optimal dan salah satu indikasi Over heating untuk membersihkan ruang bakar sehingga dapat
di pipa-pipa Boiler. Strictly Confidential menurunkan spray 34
Terimakasih

Best Regards
Reliability Team