Laporan Asset Wellness Reliabilty Adp Omu Week 11
Laporan Asset Wellness Reliabilty Adp Omu Week 11
RELIABILITY Week 11
ADP OMU
16 Maret 2022 660MW
Tamplate Laporan Weekly Report AW
1. Executive summary
2. Trending asset wellness TOP 30% ACR
3. Plant healtiness
4. Dashboard asset wellness
5. Top 3 critical asset
6. Reliability block diagram
7. Program kerja minggu ini
8. Program kerja minggu depan
9. Monitoring progress asset TOP 30% ACR (Status merah)
10. Monitoring progress asset TOP 30% ACR (Status kuning)
11. Tabel monitoring RCFA
12. Monitoring progress RCFA
13. Monitoring status FDT RCFA
14. Chart monitoring FDT RCFA
15. Tindak lanjut rekomendasi
16. Review rekomendasi REOC (Unit yang sudah ada fasilitas)
17. Update FMEA, Referensi FMEA sesuai dengan Master FMEA Asset Level A 2020
Strictly Confidential 2
01 Executive summary Coal Handling
1 (Eq) SHIP UNLOADER A (SU 2) PRIMA
2 (Eq) SHIP UNLOADER B (SU 1) PRIMA
1. Vibrasi tinggi 3,54
3 (Eq) BELT CONVEYOR RENTAN 90%
mm/s pada motor Belt Conveyor 1A
4 (Eq) STACKER RECLAIMER (STRE) PRIMA
5 (Eq) MAGNETIC SEPARATOR PRIMA
6 (Eq) DUST COLLECTOR BC PRIMA
7 (Eq) COAL SAMPLER PRIMA
RENTAN Penggantian block engine
(Eq) BULDOZER, EXCAVATOR, BULDOZER (SD32) HYDRAULIC EXCAVATOR
9 Perbaikan Engine SD 16
TRACTORS, WHEEL LOADER BULDOZER (SD16) 100%
TRACTORS C Penggantian Component
Strictly Confidential 3
1. Executive Summary
Strictly Confidential 4
2. Trending Asset Wellness TOP 30% ACR
WELLNESS W10 W11 KETERANGAN
HIJAU 225 240 ↑
Workshop SERPMPI
KUNING 13 14 ↑ Perubahan Asset 30%
↑ Rank ACR
MERAH 2 4
16 245
14 14 14
241
14
13 13 13 13 240
12 12
12
11 11
235
10
8 230
228 228
226 226 226 226
6 225 225 225 225
225
4
4
2 2 2 2 220
2
1 1 1 1 1 1
0 215
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strictly Confidential 5
3. Plant Healtiness ADP OMU
MATRIX HEALTHINESS
70 ≤ X ≤
4 4 8 12
100
ACR
40 ≤ X < 70 3 3 6 9
20 ≤ X < 40 2 2 4 6
X < 20 1 1 2 3 ADIPALA OMU Week 11
1 2 3 STATUS PLANT
Hijau Kuning Merah AREA
Kriteria Asset Wellness HELTHINESS
(Condition Status)
ADIPALA COMMON PRIMA
Healthy Level Nilai PH ADIPALA UNIT 1 SEHAT
Kritis 10-12 ASH HANDLING PRIMA
BALANCE OF
Rentan 7-9 PRIMA
PLANT
Sehat 5-6
COAL HANDLING SEHAT
Prima 1-4
Strictly Confidential 6
4. Dasboard Asset Wellness
A SSE T WEL LNE SS 100% AC R
A S S E T W E L L N E S S 3 0% A C R
HIJAU; 613
HIJAU; 242
K
U
M N K
E I U
R N M N
A G E I
HIJAU KUNING H ;
R N
;
A G
1
HIJAU KUNING H ;
4 4
;
1
4 3
Strictly Confidential 7
5. Top 3 Critical Asset
Asset Critical Unit
ASSET CRITICAL UNIT
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
AP10HLB10AN002- (Eq) PRIMARY AIR FAN B (PAF B) Operasi dengan Vibrasi diatas 4 rms Operasikan dengan mode manual, lakuka Continue Monitoring HMU ADP21/21923 30 June 2022
001 KUNING n internal cek
(ACR = 40,77)
AP10HFC30AJ001- (Eq) PULVERIZER/MILL C Temp mill tinggi saat stop karena Shut off damper Perbaikan shut off damper HMU 31 March 2022
001 KUNING tidak rapat Inprogress Perbaikan ADP22/11554
(ACR = 38,25)
AP10LAC21AP010- (Eq) MOTORIZED BOILER FEED PU Terjadi leakout pada Packing atau Mechanical sea Penggantian packing atau mechanical sea HMU 31 March 2022
001 MP (MBFP) KUNING l sisi Inboard (DE) l Inprogress Perbaikan & Penggantian ADP21/21454
(ACR = 40,77)
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
Strictly Confidential 8
5. Top 3 Critical Asset
Asset Critical Common
ASSET CRITICAL COMMON
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
AP00UEA02-001 (Eq) COAL SHED STRUCTURE Atap coal shed Sisi barat selatan rusak parah Demolish Coal shed Menunggu anggaran Demolish SARANA ADP21/17297 31 December 2022
(ACR = 17,87) KUNING
AP00UEF02-001 (Eq) TRANSFER TOWER HOUSE 2 Dinding / clading Transfer Tower 2 korosi parah Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17198 30 June 2022
(ACR = 17,87) STRUCTURE dan beberapa sudah mulai lepas Pergantian total :
KUNING Cladding, rangka cladding, material
jendela
AP00UEF03-001 (Eq) TRANSFER TOWER HOUSE 3 Dinding / clading Transfer Tower 2 korosi parah Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17133 30 June 2022
(ACR = 17,87) STRUCTURE dan beberapa sudah mulai lepas Pergantian total :
KUNING Cladding, rangka cladding, material
jendela
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
Strictly Confidential 9
6. RBD OMU
Number System
1 : 2 3 4 5 6 7 8 9 10 11 12
CLOSED CIRCULATING
FIRE PROSES ELECTRICAL EMERGENCY ELECTRICAL & CIRCULATING GENERAL AIR
COOLING WATER FUEL OIL AUXILIARY CONDENSATE
PROTECTION PROTECTION PROTECTION POWER SUPPLY CONTROL WATER CONTROL
Nama SYSTEM
Nama SYSTEM (I&C)
Nama SYSTEM
Nama SYSTEM
Nama SYSTEM
Nama SYSTEM
Nama WATER Nama SUPPLY
Nama TREATMENT Nama SYSTEM Nama BOILER SYSTEM Nama SYSTEM
SYSTEM SYSTEM
R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t)
0,9999999999 0,998001999 0,996506118 0,998001999 0,997503122 0,996989912 0,999749719 0,999999625 0,999749719 0,999415901 0,776273789 0,997253466
MAIN PROSES
23 22 21 20 19 18 17 16 15 14 13
ASH & SLAG BUNKER, SOLID
PLTU POWER
GENERATOR
STEAM
REMOVAL MAIN BOILER
COMBUSTION
FEEDER AND FUEL/COAL
HEAT GENERATION
PRESSURE SYSTEM, FEEDWATER
TRANSMISION TURBINE STEAM SYSTEM AIR FLUE GAS
Nama SYSTEM Nama SYSTEM
Nama PLANT SYSTEM Nama SYSTEM
Nama Nama HANDLING Nama FIRING SYSTEM Nama SYSTEM
Nama PULVERIZING Nama HANDLING Nama FEEDWATER AND
STEAM SECTION
Nama SYSTEM
SYSTEM SYSTEM SYSTEM
R(t) seri R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t) R(t)
0,506626955 0,998667112 0,995675268 0,983716697 0,998001999 0,965283173 0,996007879 0,711829639 0,999958587 0,999247349 0,997253778 0,997004496
0.60 < RI < 0.80 Good 0.40 < RI < 0.6 Quite 0.20 < RI < 0.40 Poor
Strictly Confidential 10
7. Program kerja
Minggu Ini : 2
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
Strictly Confidential 11
8. Program kerja
Minggu Depan : 2
KKS Asset Description STATUS Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
Strictly Confidential 12
Monitoring Progress Asset TOP 30% ACR
Status Merah
KKS Asset Description Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
AP10HFC36AP001-001 (Eq) PULVERIZER/ Silinder hidrolik dalam perbaikan Perbaikan silinder hidrolik dan Pemeliharaan sy Silinder hidrolik dalam perbaikan HMU ADP21/19386 31 March 2022
(ACR = 26,21) MILL C HYDRAULIC OIL PUMP stem Hidrolik
AP00EAE10AE001-001 (Eq) BULDOZER 1 COAL HANDLING (SD32) Block Engine Shantui SD32 pecah Lakukan perbaikan / penggantian Component Waiting Material EP ADP20/11347 30 June 2022
(ACR = 24,13) Engine Assy Bulldoser Shantui SD 32
Strictly Confidential 13
10. Monitoring Progress Asset TOP 30% ACR
Status Kuning
KKS Asset Description Condition Recommendation/due date Program PROGRESS PIC WO Due date Program
AP10HLB10AN002-001 (Eq) PRIMARY AIR FAN B (PAF B) Operasi dengan Vibrasi diatas 4 rms Operasikan dengan mode manual, lakukan int Continue Monitoring HMU ADP21/21923 30 June 2022
(ACR = 40,77) ernal cek
AP10PUE20AP001B-001 (Eq) CONDENSER VACUUM PUMP B Indikasi Kerusakan Bearing Inboard Pump Penggantian Bearing Inboard Pump B Waiting Material HMU ADP22/10735 30 June 2022
(ACR = 24,14)
AP00UEA02-001 (Eq) COAL SHED STRUCTURE Atap coal shed Sisi barat selatan rusak parah Demolish Coal shed Menunggu anggaran Demolish SARANA ADP21/17297 31 December 2022
(ACR = 17,87)
AP00UEF02-001 (Eq) TRANSFER TOWER HOUSE 2 STRUCT Dinding / clading Transfer Tower 2 korosi parah dan Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17198 30 June 2022
(ACR = 17,87) URE beberapa sudah mulai lepas Pergantian total :
Cladding, rangka cladding, material jendela
AP00UEF03-001 (Eq) TRANSFER TOWER HOUSE 3 STRUCT Dinding / clading Transfer Tower 2 korosi parah dan Lakukan perbaikan/penggantian Waiting Material SARANA ADP20/17133 30 June 2022
(ACR = 17,87) URE beberapa sudah mulai lepas Pergantian total :
Cladding, rangka cladding, material jendela
AP10HFC16AP001-001 (Eq) PULVERIZER/ Press HOP Rendah (3 MPa) Pengetesan HOP, Perbaikan SIlinder piston, Cl Waiting Condition HKI ADP22/12166 30 June 2022
(ACR = 26,21) MILL A HYDRAULIC OIL PUMP eaning Line Hydrolic
Strictly Confidential 14
11. Tabel Monitoring RCFA
PANTAUAN RCFA
CLOSE VEROK APPR KAJDONE FDTOK VERNOTOK KAJIANOK WAPPR ENGDONE WAPPR
Strictly Confidential 15
12. Monitoring progress RCFA 2021
Strictly Confidential 16
13. Monitoring FDT RCFA 37/RCFA/ADPOMU/I/2021
RCFA GANGGUAN PRIMARY AIR FAN B VIBRASI TINGGI
FDT Number DESCRIPTION Task Type Frequency PIC Related doc (WO/JP/etc) Progress Due Date
1 Melakukan Pengecekan dan setting Bearing OH SI HMU AP-JP-HM-SE MIN-HLB- CLOSE Selasa, 04 Januari 2022
003
3 Melakukan pengecekan grounding dan perbaikan groun OH SE HKI AP-JP-HM-SE-HLB-001 CLOSE Jumat, 30 April 2021
ding
4 Melakukan pengecekan sensor vibrasi dan perbaikan OH SI HKI AP-JP-HM-SI-HLB-001 CLOSE Jumat, 30 April 2021
Strictly Confidential 17
13. Monitoring FDT RCFA 38/RCFA/ADPOMU/II/2021
RCFA GANGGUAN STRE TRIP TANPA INDIKASI ALARM
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Kabel Komunikasi Modbuss PLC Putus CM SE HKI ADP21/11512 CLOSE Rabu, 30 Juni 2021
Strictly Confidential 18
13. Monitoring FDT RCFA 39/RCFA/ADPOMU/II/2021 RCFA
GANGGUAN BC 1A & 1B TRIP TANPA INDIKASI ALARM
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
1 Pengecekan Digital Ouput (I/ PM Y2 HKI No dokumen patrol ch CLOSE Rabu, 30 Juni 2021
O) untuk Perintah start Stop BC 01A dan 01B, pengganti eck lokal 1 : ADP.04.06
an Card I/O PLC jika ada indikasi Abnormal/ Rusak .011
2 Lakukan rutin pengecekan dan Cleaning Koneksi Relay, PM 4W HKI AP-JP-HK-4W-EAC- CLOSE
Kabel Kontrol, Socket Relay & Lakukan Penggantian Rela 0002
y dan Socket Relay yang rusak/ Korosif.
3 Tegangan Supply Control 24 VDC Drop. Lakukan Pengec PM 4W HKI AP-JP-HK-4W-EAC- CLOSE Selasa, 04 Januari 2022
ekan Kekencangan Terminasi kabel Power, Penggantian 0002
Kabel dan Terminal jika ada temuan Rusak
4 Tegangan Supply Control 24 VDC Drop, Modul Power Su PM 4W HKI AP-JP-HK-4W-EAC- CLOSE Selasa, 04 Januari 2022
pply Rusak. Lakukan rutin pengecekan Tegangan Ouput 0002
Modul
5 Pengecekan Digital Ouput (I/ PM Y2 HKI AP-JP-HKI-SI-CXA-001 CLOSE Selasa, 04 Januari 2022
O) untuk Perintah start Stop BC 01A dan 01B, pengganti
an Card I/O PLC jika ada indikasi Abnormal/ Rusak
Strictly Confidential 19
13. Monitoring FDT RCFA 40/RCFA/ADPOMU/II/2021
RCFA GANGGUAN ALL MILL TRIP DAN UNIT TRIP
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Review SOP/IK Coal Bleding REVIK OP IK.ADP.04.02.012 CLOSE Rabu, 30 Juni 2021
Strictly Confidential 20
13. Monitoring FDT RCFA 41/RCFA/ADPOMU/II/2021 RCFA
BELT CONVEYOR 3 SOBEK SEPANJANG BELT
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
1 Pembuatan PM 12W Lining Plate PM 12W AMA AP-JP-HM-12W-EAF- CLOSE Selasa, 04 Januari 2022
0001
Strictly Confidential 21
13. Monitoring FDT RCFA 42/RCFA/ADPOMU/III/2021
RCFA LUBE OIL TURBINE PRESSURE LOW (EMERGENCY MAN
UAL TRIP)
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
02 Melakukan Seeting Kembali Hanger tension OH OH HMU ADP21/16290 CLOSE Rabu, 30 Juni 2021
Strictly Confidential 22
13. Monitoring FDT RCFA 44/RCFA/ADPOMU/VII/2021 RCFA
GANGGUAN MECHANICAL SEAL BOILER FEED PUMP
TURBINE B (BFPT B)
FDT Number DESCRIPTION Task Type Frequency PIC Related doc Progress Due Date
(WO/JP/etc)
01 Realignment BFPT every OH, jika terjadi misalignment dilakukan re OH OH HMU AP-JP-HM-SE-LAC-002 CLOSE Jumat, 30 Juli 2021
alignment (standard 0,05).
Strictly Confidential 23
14. Chart monitoring status FDT RCFA
CLOSE; 38
CLOSE ISSUED
Strictly Confidential 24
15. Tindak Lanjut Quick Review
Asset Wellness Week 11
No. Deskripsi Rekomendasi PGE Tidak Lanjut Rekomendasi
1 Kondisi asset PLTU Adipala per Week 10 : Akan ditindaklanjuti. Penyehatan aset memiliki beberapa kendala
AW Merah : 4 asset (1 asset masuk 30% ACR) trend merah naik antara lain waiting material, belum tersedianya anggaran dan
AW Kuning : 16 asset (13 asset masuk 30% ACR) trend kuning tetap. eksekusi membutuhkan unit stop. Detail program penyehatan
Komposisi AW W10 tetap seperti W9, agar terus dipertahankan lagi jangan sampai ada potensi terjadi aset telah disampaikan ke KP. review FMEA MS JP rutin dilakukan
penurunan keandalan sampai dengan jadual SE tahun 2022. setiap minggu untuk mengevalusai tactical maintenance.
Agar segera disusun program penyehatan dan review tactical maintenance serta memastikan scope SE th
2022
2 Plant Healthiness ADP W10 tetap agar terus dipertahankan lagi jangan sampai ada potensi terjadi penurunan Akan ditindaklanjuti. Penyehatan aset memiliki beberapa kendala
keandalan sampai dengan jadual SE tahun 2022. antara lain waiting material, belum tersedianya anggaran dan
Hal ini agar dilakukan review terhadap tactical maintenance dan segera disusun program kerja penyehatan eksekusi membutuhkan unit stop. Detail program penyehatan
aset telah disampaikan ke KP.
3 untuk asset BFPT B agar ditingkatkan lagi tactical maintenance dan FLM untuk mengecek kondisi hasil Akan ditindaklanjuti saat eksekusi.
perbaikan pasca kejadian kebocoran mechanical seal dan diharapkan tidak terjadi gangguan serupa sampai
dengan dilakukan pengecekan secara menyeluruh pada saat SE th 2022.
4 untuk asset BC 6A agar ditingkatkan lagi tactical maintenance dan FLM untuk mengecek kondisi hasil
penggantian belt dan diharapkan tidak terjadi gangguan serupa. Selain itu perlu dilakukan pengecekan juga di Akan ditindaklanjuti saat eksekusi.
BC yang lainnya.
5 Rincian RCFA Secara Maximo di W10 masih stagnan sbb : Akan ditindaklanjuti dengan memperbaiki RCFA yang belum
RCFA tahun 2020 sampai dengan W10 tahun 2022 berjumlah 6 RCFA dengan status sama seperti W1 : 4 sesuai dengan hasil verifikasi. RCFA 2020 status FDT OK (verifikasi
CLOSE, 1 VEROK, 1 VERNOTOK KP)
RCFA tahun 2021 sampai dengan W10 tahun 2022 berjumlah 10 RCFA dengan status sama seperti W1 : 5
CLOSE, 1 ENGDONE, 1 VERNOTOK, 2 FDTOK (1 KI, 1M), 1 WAPPR.
Untuk yang RCFA statusnya belum FDTOK atau VERNOTOK dan yang masih WAPPR (gangguan APH B) agar
segera difinalkan/direvisi sesuai dengan format baru DIPF dari RESP (Pak Wisnu cs) termasuk kejadian
gangguan yg terakhir.
Untuk RCFA gangguan BFPT agar segera dibuat agar tidak sampai terjadi gangguan berulang.
Strictly Confidential 25
1. Main Steam Temp Low - Status Close
Best Regards
Reliability Team