RVS COLLEGE OF ENGINEERING AND TECHNOLOGY
Kannampalayam, Coimbatore – 641 402
DEPARTMENT OF PETROCHEMICAL ENGINEERING (R – 2021)
NAAN MUDHALVAN PROJECT PRESENTATION
ACADEMIC YEAR (2023 – 2024)
SOLID WASTE MANAGEMENT
.
SOLID WASTE MANAGEMENT
(An initiative of Naan Mudhalvan in collaboration with L&T EduTech)
Presented by :
KATHIRESH.M
JAYASURIYA.M
KAMALNATH.C.V
KARUN K VINOD
Task -1
Waste characterization and quantification
Characterization of Waste :
Preparation of general profile
Survey Phase
Waste Stream Characterization
Preparation of general profile SULUR
Number of Nature No. of Male Female Total % of total
wards Of area household populatio
n
WardNo.171 rural 500 1300
(sulur) 700 2000 1.8%
Coimbatore
Total 2000
Population density in surrounding regions
Survey Phase
Name of Surveyor...KATHIRESH M..........
Name of Authority…NSS
The waste is not disposed properly, it can pollute the environment .
Wastes are left around the dust bin.
Disposes of household waste
Family member
The household waste disposed is collected by
Waste collector from the municipality does the door-to-door waste
collection
Waste Collecting period
Everyday
Waste Stream Assessment & Quantification in
sulur at Selected Points
Near by region and Sources:
Name the near by region………sulur……
sulur: Domestic,Shops,Institutions,Office
Quantification: Segregation results of solid waste samples per day
Gross
weight
Sampling Organic Plastic Glass Stone Shell Metal
(grams)
stations (grams) (grams) (grams) (grams) (grams) (grams)
S1 185.80 250.45 150 0 0 0 0
S2 125.15 528.4 112.66 0 20 0 0
S3 138000 50000 16000 0 1900 0 0
Percentage of various components in solid waste samples
Sampling Organic Plastic Glass (%) Stone (%) Shell (%) Metal (%)
Stations waste(%) (%)
S1 75.40 11.4 0.00 0.00 0.00 0.00
S2 80.4 14.7 0.00 1.52 0.13 0.00
S3 25.8 12.8 0.00 55.66 0.00 0.00
S4 70.4 13.8 0.00 0.00 0.00 0.00
S5 68.8 15.6 0.00 2.80 0.00 0.00
S6 72.4 18.9 0.00 0.00 0.00 0.00
S7 70.3 18.5 0.00 0.00 0.00 2.10
Task - 2
WASTE COLLECTION SYSTEM
Waste Collection and Transport
Hotel Waste Collection Practices
Market
Transportation to Dump Yard
Waste Collection
CollectionandSegregation
Management plans for effective waste collection
Component Bins for Door to Door Street Sweeping Secondary
segregation collection Collection
Segregation of waste a Arrange for door to Organize Street Is there any
Indicator source by storing of door collection of sweeping covering communal
waste in 3 different segregated solid all the residential bins
bins wet, dry and and commercial located?
waste from
Domesti areas on
chazardous all
Al l the day of the year
waste households
irrespective of Sundays
including slums and and public holidays.
informal settlements,
commercial,
Institutional and
other non-residential
premises.
Existing Practices Only wet and dry Organized street Yes
waste is sweeping is carried out
Informal settlements
collected.Domestich are missed in the
azardous waste is collection
also collected alone Proce
with dry waste ss
Component Bins Doorto Doorcollection StreetSweeping Secondary
forsegregation Collection
Comparison of cost
Hauled System Stationary Container System(₹/week),
Round Trip HaulDistance (x), km
Container TOTAL COST=1001RS
(₹/week)
10.8(x)
43,316.64 +
650 (x)
0 0.00 10.00
5 2.14 10.71
10 4.29 11.43
15 6.43 12.14
20 8.57 12.86
25 10.71 13.57
30 12.80 14.29
Task - 3
WASTE TRANSFER AND TRANSPORT
Vehicle Routing :
Occupancy rate: ….4….occupants per house Collection frequency:
….1week….with service collection Collection crew size: ….One
person….
Collection vehicle capacity:….24.6 mt…..
Compacted waste density: ….320kg/mt…..
Waste generated per person per day: …..1.6kg…..
Vehicle Routing for Residential Colony in coimbatore
Feasibility and economic analysis
The collected data areas follows:
Cost of transfer station=…Rs. 405/ton….
Average Pay load for direct haul=5.6 tons…
Average Pay load for transfer haul station to land fill=…36.7 tons…
Average cost of trucks for direct or transfer haul=…Rs.20/km…
Costing Tabulation for Analysis
Distance in km Cost of Direct Haul Cost of Transfer Haul
0 0.00 10.00
5 2.14 10.71
10 4.29 11.43
15 6.43 12.14
20 8.57 12.86
25 10.71 13.57
30 12.86 14.29
35 15.00 15.00
40 17.14 15.71
Task - 4
WASTE PROCESSING TECHNOLOGIES
The Material Recovery Facility in ......sulur…
Initial Moisture content=…25%......
Moisture loss=….20%.ofinitialvaluefromlightfractionHeavyfractioninlight fraction
=….6%........
Light fraction in heavy fraction=……15%..........
Ferrous metals=…80%....
Glass=…..80%
Aluminium =……70 %........
Components Vs Weigh to Processed waste in MRF:
Component Percentagebyweight
FoodWaste 30
Paper 35
Cardboard 2
Plastics 2
Textile 1
Rubber 0.5
Leather 0.5
GardenTrimming 12
Wood 2
Glass 6
Tin Cans 4
Nonferrous metals 1
Ferrous metals 2
Tanner’s Diagram
content, W=……0.24%......
Ash content, A=…4.93%.....
Combustible,C=….94.83%..........
Comprehensive analysis of waste treatment practices
Current Gapsinthe Proposed
S.No Type of waste treatment treatment treatment
method methods
1 Food waste 20%composting 80% is going to the Canbeusedinprodu
landfill cing
Biogas
Recyclablewaste- 100% is getting
2 Plastics,glassand recycledinMRF --- --------
metals
3 E-waste(batteries, 30% only 70 % of the e waste 70% of the e-waste
circuit boards, is generated goes to has to be segregated in
electrical waste etc.) segregated and landfill without treating. the source and given it
processed in the to the PCB
MRF) certifiedvendorsforpro
per recycling.
4 Sanitary waste 100%isgoingto the Not treated It must be
landfill properly
incinerate
d.
Task- 5
WASTE DISPOSAL AND WASTE MANAGEMENT PLAN
Waste Disposal Plan for sulur
Asanitary land fill to serve the sulur, population has been worked out for the
following data.
Solid waste generation per day by per person (for the locality chosen) = 0.5 kg Out
of generated waste only 30% reaches the landfills.
Compacted density of solid waste in landfill=253kg/m 3
Average depth of compacted solid waste=4 m
Population of sulur =2409
Current Disposal Practices in sulur :
Sulur there is no landfill, and the reasons were analyzed. It was found that
for My coimbatore solid waste disposal itself there is an area requirement of
4062.45 m2/year.
Waste Management Plan using Input data
Annual Precipitation: 1080mm/yr
AverageTemperature:300C
Waste Generated = 10000 t/yr MRF:
Composting:
Incineration:
Flow chart of management Plan
Flow chart of management plan
Conclusion :
In conclusion, the comprehensive waste characterization
and quantification efforts in My sulur, Coimbatore, have
yielded crucial technical insights vital for optimizing
urban sustainable waste management strategies.