Mooring Analysis

Uploaded by

martindarius.dp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views19 pages

Mooring Analysis

Uploaded by

martindarius.dp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 19

Mooring Analysis

Contents
• Introduction
• Mooring Patterns
• Forces acting on moored ships
• Mooring Guidelines for tankers
• Requirement of Mooring Analysis
• Mooring Analysis Software
• Introduction to OPTIMOOR

2
Introduction

• What is Mooring ?
• Principles of Good Mooring

3
4
Mooring Patterns
• Breast Lines
• Spring Lines
• Head and Stern Lines

5
Mooring Angles
• Horizontal Angle
• Vertical Angle

6
Forces Acting on Moored Ship

• Wind
• Current
• Hydrodynamic interference from passing ships
• Ocean or long swell waves
• Tidal rise and fall
• Change in draught or trim
• Ice

7
Wind Force
• As per IS 4651 ( Part III)
F=CwAwP
Cw: shape factor = 1.3 to 1.6
Aw: windage area in m2
Aw= 1.175 Lp ( DM - DL ) ( Perpendicular to ship)
Aw= B( DM - DL ) ( Parallel to ship)
P = wind pressure as per IS 875
• As per BS 6349 (Part I)
FTW = CTW ρA AL VW2 10 -4
FLW = CLW ρA AL VW2 10 -4

8
Force due to Current
• As per IS 4651 ( Part III)
Fc = (Γ Vc2/2g)Ac
Γ : Weight Density of water
Vc : Velocity of current
Ac : Area, BD (For force parallel to ship)
LpD (For force perpendicular to ship)
• As per BS 6349 (Part I)
FTC = CTC CCT ρw LBP dmVc2 *10 -4
FLC = CLC CCL ρw LBP dmVc2 *10 -4

9
Mooring Loads
• for general cargo vessels and bulk carriers
DISPLACEMENT ( Tons ) LINE PULL ( Tons )

2000 10
10 000 30
20 000 60
50 000 80
100 000 100
200 000 150
Greater than 200 000 200
NOTE 1 - For ships of displacement tonnage 50,000 and over, the value of line pulls
given above should be increased by 25 percent at quays and berths where there is a
strong current.
NOTE 2 -Main bollards at the ends of individual large vessel berths at river structures
should be designed for a line pull of 250 tons for ships up to 100 000 tons displacement
and for double the values given above for larger ships. 10
Mooring Guidelines for Tankers
• OCIMF* Guidelines
Standard Environmental Criteria
60 knots wind in any direction simultaneously with
3 knots current at 00 or 1800
or
2 knots current at 100 or 1700
or
0.75 knots from the direction of maximum beam
current loading

*
Oil Companies International Marine Forum
11
Requirement of Mooring Analysis
• Costly damage to cargo handling equipment
or other nearby vessels and structures
• Oil or chemical pollution
• Personnel injuries and fatalities

12
Mooring Analysis Software
Navy
• E-MOOR
• FIXMOOR
• PASS-MOOR

Commercial
• MOSES
• OPTIMOOR - Tension Technology
• AQWA - WS Atkins
• SHIP—MOORINGS – Alkyon
13
Introduction to OPTIMOOR
• Developed by Tension Technology
International
•Case - .OPT
Berth Screen
Vessel Screen
General Environment Screen
Mooring Line screen
Arrangement Screen

14
Thank You

15
16
17
18
19