Railway Training Report

Uploaded by

Pyae Phyoe Aung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views19 pages

Railway Training Report

Uploaded by

Pyae Phyoe Aung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 19

RAILWAY TRAINING REPORT

Trainers-Mr. Ishida
Mr. Kai Soku
Mr. Wada Chi
Mr. Tetsujin
Mr. Choku Shin
Mr. Ashika
From Sep 24,2019 To Oct 4,2019
Attention To Mr. Ishida
Report By Wunnna Ko
Scope of training

• Operation function switches of Railway Excavator and Crane.


• Pre-operation procedure of Railway Excavator and Crane.
• Dos and Don’ts in normal operation of Railway Excavator and Crane.
• Emergency operation switches of Railway Excavator and Crane.
• Emergency operation procedure of Railway Excavator and Crane.
• Notice points in emergency operation of Railway Excavator and
Crane.
• On Job Training of Railway Equipments.
 Operation function controls of Railway Excavator.

Liner up & down lever

Accelerator lever

Boom & bucket control

Arm & swing control


 Operation function controls of Railway Excavator.

Travel control lever

Lighting switches
Attachment mode change switch

Wheel or crawler mode change switch

Sub engine key switch

Brake switch
 Operation function controls of Railway Excavator.

Attachment Equipment operation pedal

Arm offset angle change pedal


 Operation function controls of Railway Crane.

Boom and winch control

Swing and boom telescopic control lever


 Operation function controls of Railway Crane.

Over wind disable switch By pass key switch

Light switches

Sub engine
key switch
Boom section selector switch
Crane

Wheel or crawler
Winch speed change
mode
selector switch
change switch
 Pre-operation procedure of railway excavator and crane.

Check the followings,


1. Engine section.
2. Under carriage.
3. Railway section.
4. Emergency brake valves.
5. Emergency hand pump.
6. Sub engine.
7. Test run sub engine.
 Dos and Don’ts in normal operation of Railway
Excavator and Crane
Dos Don’ts
• Certainly align the wheel to railway.
• Excavation on railway position.
• Completely down the wheel to railway • Crawler travel on railway.
when railway operation.
• Lift the load on railway positon.
• Nearly 1cm up the wheel when
excavator/crane operation. • Machine operate laterally on
• Press horn when machine start move railway position.
from stop.(once touch= forward, twice
touch=reverse) • Pick and carry the load on
• Completely up the wheel when leave railway position.
the machine from railway.
 Emergency operation controls of Railway Excavator.

Sub engine Brake release valve(front) Brake adjust piston

Hand brake Hand pump valve


 Emergency operation controls of Railway Excavator.

Valves (liner up/down, crawler ext./rec) Control valves(boom,arm,bucket,swing)

Throttle valve
 Emergency operation controls of Railway Crane.

Control valves(boom down, swing, boom rect/winch down) Hand pump

Hydraulic hose Brake release pump


 Emergency operation controls of Railway Crane.

Front brake release valve

Throttle valve Liner up/down hose


Rear brake release valve
 Emergency operation procedure of Railway Excavator.

• Procedure 1(Main engine can’t use)


1. Open fuel valve of sub engine.
2. Place throttle valve at start position.
3. Start sub engine with key switch.
• Procedure 2(Main engine and electrical system trouble)
1. Open fuel valve of sub engine.
2. Place throttle valve at start positon.
3. Press decompression valve of sub engine.
4. Sub engine start by pulling recoil rope.
5. Place key ON position at main engine key switch.
• Procedure 3(Main and Sub engine can’t use)
1. Open emergency hydraulic valves.
2. Use emergency hand pump with handle.
 Emergency operation procedure of Railway Crane.

• Procedure 1(Main engine can’t use)


1. Open fuel valve of sub engine.
2. Pull or turn throttle valve to end positon.
3. Start sub engine with key switch.
• Procedure 2(Main engine and electrical system trouble)
1. Open fuel valve of sub engine.
2. Pull or turn throttle valve to end positon.
3. Press decompression valve of sub engine.
4. Sub engine start by pulling recoil rope.
5. Place key ON position at main engine key switch.
• Procedure 3(Main and Sub engine can’t use)
1. Open emergency hydraulic valves.
2. Use emergency hand pump with handle.
 Notice points in emergency operation of Railway Excavator
and Crane.

• May be falling hazard when pull recoil rope.


• Suddenly drop attachments when open emergency hydraulic valve.
• Suddenly move the machine when open brake valves.
• Must be clean dirt from outside when change hydraulic hose at crane.
• Must share all process to all including members.
• Must notice to all including members when start each emergency step.
• All emergency valves put to normal position when finish emergency
operation.
 On job training activities.

Inspection Railway Equipment


Inspection &
Repair Railway
Dump Truck
Summary

• Learned for railway equipment about followings,


1. How to drive the machine.
2. How to do at emergency condition.
3. How to inspect the machine.
• Want to share knowledge about railway equipment to all.