Understanding P&ID
By Arif Rakhmawan, S.T, M.T.
Depok, 31 Oct 2024
         Contents
1. Objective
2. Information to be shown on
   P&ID
3. P&ID Legend
4. Process Control
5. Safeguarding Devices
6. Sample Typical P&ID
                          2
7. Isometric Drawing
            OBJECTIVE
Understand how to read P&ID
Understand process & operating philosophy
Understand how to read Isometric drawing
What is the difference between:
Process Block Diagram
Process Flow Diagram
Piping & Instrumentation
Diagram
                                  4
PROCESS BLOCK DIAGRAM
                        5
PROCESS FLOW DIAGRAM
                       6
Who generate and utilize P&ID?
            Piping
                                       Vend
          Instrument
                                        or
       Chemical / Process
          Mechanical                   Consult
                                         ant
           Electrical
            Control         Producti
                                                 Others
                               on
             Safety
                                                          7
    What is P&ID?
    A P&ID is a type of process engineering drawing that describes all process design aspects of a
    plant/facility.
    What does the Information to be shown in P&ID ?
              Major and Minor Equipment
                            Piping
.
                      Instrumentation
                       Safety Devices
                     Motor and Driver
                                                                                                     8
Equipment Items
     • Item number and service names
 1
     • All nozzles and nozzles size including manholes, steam out,
       purge out, safety relief valve, instruments, vent, drain
 2     connection, etc.
     • Spectacle blinds/ spacer shall be indicated according to the
 3     maintenance philosophy of each project.
     • For rotary machinery (Pump/ Compressor/ Blower), The type
       and the driver type shall be indicated including utility
 4     connections which are required.
     • For tower/vessel/drum and tank, schematic drawing for
       internals shall be shown, such as: tray/ packing, demister,
 5     inlet baffles, vortex breakers, dip pipe, etc.
Piping
all piping parts
                   Line number
such as valves,
                   for all lines
check valves,                         Line class
                   according to
reducers,                             break point
                   project
blinds,
                   specifications
strainers, etc.
                                      required for
Line sizes,
                   All process        process reason,
tracing and
                   vents, draining,   such as vent to
insulations
                   steam out,         safe location,
shall be
                   purge out          no pocket, free
covered by a
                   connections        drain, slops,
line number
                                      etc
Instrumentations
All local                         Instrument tag
instruments,                      number
                 The type of
including                         according to
                 instruments
control                           project
equipment                         specifications
Instrument
signal lines                      Set pressure and
                 Instrument air
according to                      size of safety
                 failure action
project                           relief valve
specifications
                                                                                        12
P&ID Legends
                             Definition
              Contain information needed
                                            1           2 Equipment
                                                            Equipment symbols &
             to interpret & read the P&ID                           abbreviations
                        Piping                                    Control
                                                                  Control/on-off/shut
              Piping symbols &
                abbreviations
                                       5                      3   down valve details
                                                    Instrument
                                                4      Instrument symbols &
                                                      abbreviations
Note: P&ID legend of one project may
be different to others, depends on
client‘s spec
Piping Symbols
                 13
 Equipment
Identification
                 14
Equipment Symbol
                   15
Instrument Symbols
                     16
Process
Control
Type of Process Control
    Single
                 Integrated
   Feedback
                   Control
    Control
                  Cascade
     Flow
                  control
    control
                    Split
                   Range
     Level
                  Control
    control
                      Override/
    Pressur       Selective Control
       e
    control         Ratio
                   Control
    Temperatur
     e Control
                                      18
 Integrated Process
            Control
(a) Cascade control
Cascade control is usually use two controls in one Control Valve.
MV of primary controller reset the set point of secondary controller.
                                                                        19
Safeguarding Devices
  In order to maintain process plants on the safe side
  all the time, various kinds of safeguarding devices
  are provided.
        Voting system
          Depressuring valve
          Emergency Shutdown Valves
        Pressure Safety Valves
                                                         20
                  WING                                                TO RELIEF
                  SSV                      HP       LP    TEST        HEADER
                                 CHOKE   HEADER   HEADER HEADER
                   MASTER
                   SSV
Wellhead System          FROM
                         OTHER
                         WELLHEADS
                                                          TO TEST
                                                          SEPARATOR
                                                    TO LP SEPARATOR
                                                    TO HP SEPARATOR
                                                                       21
            Cause a primary separation of
Separator   most gas from liquid
            Refine the primary separation
            by removing most of the
            entrained liquid mist from the
            gas
            Ensure that no re-entrainment
            of one into the other take place
            when discharging the separated
            gas and liquid from the
            separator
            Further refine the separation by
            removing the entrained gas
            from the liquid
                                        22
                                               22
                          Why require
          What is Pump?    increase
                           pressure
Pumping
             Pump           Pump
           Application    Schematic
                                        23
Compressor
             24
What do you see from below
Separator P&ID