0% found this document useful (0 votes)
13 views18 pages

CPP Report 2024-25 Detailed

Uploaded by

Aayush Nalawade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views18 pages

CPP Report 2024-25 Detailed

Uploaded by

Aayush Nalawade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 18

CAPSTONE PROJECT PLANNING

REPORT
• ASSET MANAGEMENT SYSTEMS FOR STATIC
AND PORTABLE ELECTROMECHANICAL
MACHINES
• Diploma in Information Technology
• Submitted by: Aayush Nalawade, Kirtan Patel,
Sairaj Patil, Varad Gandhi
• Guided by: Mrs. P. A. Ternikar
• Pimpri Chinchwad Polytechnic, Akurdi, Pune
• 2024-25
Certificate
• This is to certify that the following students
have completed the Capstone Project Planning
Report:
• Project Title: Asset Management Systems for
Static and Portable Electromechanical
Machines.
• Under the guidance of Mrs. P. A. Ternikar.
• Submitted by:
• 1. Aayush Nalawade
• 2. Kirtan Patel
Abstract
• AMS optimizes the performance and longevity
of electromechanical machines.
• Static machines: Industrial motors,
transformers, HVAC systems.
• Portable machines: Power tools, generators,
medical equipment.
• AMS incorporates predictive and condition-
based maintenance.
• Benefits: Reduced downtime, compliance with
safety standards, and cost-effective asset
Introduction
• Asset Management Systems (AMS) are crucial
for managing static and portable machines.
• Static machines: Backbone of industrial
operations.
• Portable machines: Provide flexibility but face
usage tracking challenges.
Challenges in Managing Machines
• Inconsistent maintenance practices.
• Reactive maintenance leads to financial losses
due to unexpected breakdowns.
• Predictive maintenance helps minimize
disruptions.
Condition-Based Monitoring
• Ensures real-time tracking and intervention.
• Predictive maintenance: Analyzes machine
data to forecast failures.
• Condition-based maintenance: Relies on real-
time performance monitoring.
Advantages of AMS (1/2)
• Enhanced reliability and efficiency.
• Reduced downtime and maintenance costs.
• Extended equipment lifespan.
• Improved decision-making using performance
data.
Advantages of AMS (2/2)
• Real-time tracking of portable machines.
• Cost-effectiveness through optimized
maintenance schedules.
• Compliance and safety assurance with
detailed records.
• User-friendly interfaces and dashboards.
Motivation
• Static machines are the backbone of industrial
processes, essential for continuous
operations.
• Portable machines, while versatile, require
accurate tracking of usage and condition.
• Without an AMS, organizations face higher
repair costs, safety risks, and inefficiencies.
Problem Statement
• Managing assets for static and portable
machines involves real-time tracking,
forecasting, and resource allocation.
• Challenges: Overstocking, stockouts, increased
costs, and operational inefficiencies.
Need of the Project
• Traditional maintenance methods
(reactive/preventive) are insufficient.
• Predictive and condition-based maintenance
optimize machine upkeep and reduce costs.
• AMS ensures machines operate at peak
efficiency and improve long-term
sustainability.
Proposed Methodology (1/2)
• Phase 1: Research and Requirement Analysis.
• Phase 2: System Design (User-friendly
interface and backend system).
Proposed Methodology (2/2)
• Phase 3: Development (Real-time data input,
maintenance alerts).
• Phase 4: Testing and Validation (Simulated
data, different scenarios).
• Phase 5: Deployment and Support (Industrial
setting, user training).
Action Plan (1/2)
• Initial Proposal Discussion: 19/07/2024 -
02/08/2024.
• Topic Finalization: 02/08/2024 - 09/08/2024.
• Task Distribution: 09/08/2024 - 16/08/2024.
• Data Collection Strategy: 16/08/2024 -
23/08/2024.
Action Plan (2/2)
• Proposal Submission: 20/09/2024 -
27/09/2024.
• Implementation Timeline: 27/09/2024 -
04/10/2024.
• Presentation: 25/10/2024 - 08/11/2024.
• Reflection and Evaluation: 08/11/2024.
Literature Survey (1/2)
• 1. Asset Management of Large Electric
Machines through Monitoring of Electric
Insulation.
• 2. A Methodology for Asset Management in
Electric Power Systems.
Literature Survey (2/2)
• 3. Development of a Mobile Application for
Asset Management in Industrial
Environments.
• 4. Reliability-Centered Maintenance for Static
and Portable Machinery.
References
• 1. Journal of Electrical Engineering &
Technology (2023).
• 2. IEEE Transactions on Power Systems (2022).
• 3. International Journal of Information
Technology (2021).
• 4. Maintenance and Reliability Journal (2021).

You might also like