1. Introduction of Teams
2. Key Deliverables Acceptance
3. Material Traceability
4. Scope of Supply
5. Project QA/QC Requirements
6. Final Product Material Certification Requirements
7. Location details & Project Execution Offices
8. Proposed Organigram for the project (with complete contact details)
9. Management of Vendor / Sub Vendor
10. Review of contract time frame and Delivery
11. Critical project Milestone
12. Engineering Drawing and Document Templates
13. Deviation if any to be discussed
14. Vendor Document Requirement List
15. Periodic Progress Updates / Reporting
16. Site assistance for Pre-commissioning / Commissioning works
17. Site visit / LOA requirements
18. Need List / Area of Concern
1. Introduction :
1. The inspection level and certification requirements shall be fulfilled as per Equipment/ Material
Criticality rating specification AGES-SP-13-001 Rev.1 & AGES-SP-13-002.
2. All Quality and Inspection & requirements during all stages of the work shall be fulfilled in line with
AGES-GL-13-001, AGES-SP-13-001, AGES-SP-13-002.
3. Pre-Inspection Meeting (PIM) and PIM package requirements shall be followed as per AGES-GL-13-001
and AGES-SP-13-002.
4. Pre-Inspection Meeting (PIM) shall be held to address critical control activities and related areas of
concern. PIM shall be held at Vendor's production facility with, and in presence of, all concerned
parties / stakeholders (Manufacturer, Contractor, TPI, and Company Reps etc.) shall be conducted
before work commencement.
5. PROJECT QA/QC REQUIREMENTS
• “Inspection assignment package (IAP)” shall be submitted to COMPANY with Inspection
Notification IN.
• RFI shall be submitted in advance for all the inspection & testing as per the approved ITP.
• RFI shall be submitted at least 10 working days / 2 WEEKS before the inspection date.
• For PIM or FAT notification shall be raise 3 weeks before the date of attendance &
Confirmation 72 Hours before inspection.
• Fluidline shall prepare the material for dispatch and shall release the material for shipment
only after receipt of IRN.
6. FINAL PRODUCT MATERIAL CERTIFICATION REQUIREMENTS
Project QA/QC requirement shall be followed as per the AGES-GL-13-001 and AGES-SP-13-002 for
Procurement Inspection and Certification requirements in Projects
6. FINAL PRODUCT MATERIAL CERTIFICATION
REQUIREMENTS
Pressure Parts list for Inspection class -1 : 3.2 Certification
• Valve Body
• Valve Cover / Bonnet
• Ball Valve Body connector
• Pressure Parts list for Inspection class -2 : 3.1 Certification
• Valve Body
• Valve Cover / Bonnet
• Ball Valve Body connector
Vendor:
Hatta Trading & Services Establishment
M Floor : M1-103, Sama Tower,
Beside NMC Hospital,
Abu Dhabi, U.A.E.
Manufacturer:
Fluidline Valves International Pvt. Ltd.
2203 A, G.I.D.C., Phase – IV,
Vatva, Ahmedabad,
Gujarat, India
[email protected]
General Manager - Commercial Tarik Pawne
(+919167578557)
[email protected]
UAE Local Contact Vinay Malik
(+971568728662)
[email protected]
Engineering Abelardo Aboudaher
(+919879590130)
[email protected]
Operations Ilyas Pathan
(+919904527689)
[email protected]
Quality Head Devang Upadhyay
(+919725735243)
[email protected]
Document Controller Farhan Pathan
(+919099794498)
Fluidline valves Int. Pvt Ltd
Project Organization Chart
PO: 111/P152/MP0/23-24/13396
Contractor : Robstone ( ME) LLC
End User : ADNOC ONSHORE
Management
Abelardo Aboudaher
Mr.Zaheer Hawa Dr.Michel Pascal
Design Head
Director CEO
Project Head
Planning Excuative
Design Engineer Production engineer Qc Engineer Dispatch Labour
/Purchse Excuative
9. Management of Vendor / Sub Vendor
* Vendor/Manufacturer has received all the templates and shall submit the
documents accordingly. Documents Numbers
* RFI notification duration – Timely notification shall be ensured from
manufacturer for availability of inspection with at least two (2) week for
source inspections outside UAE and one (1) week for source inspections
inside.
13. Deviation if any to be discussed
NO DEVIATION
14. Vendor Document Register List (VDRL)
NOT APPLICABLE
17. Site visit / LOA requirements
NOT APPLICABLE
18. Need List / Area of concern