1. Introduction
Client Brief
5
EVIDENCES OF PROBLEMS
6
SCOPE
Bridge Pier
Earth Retaining
Scouring
Walls
7
Conceptual EN19390406 - Mazariq M.S.M
Schemes
Stages of Selecting
⬗ Inspections
⬗ Condition Rating Coding System
⬗ Selection of Alternatives
8
conceptual schemes (Cont..)
Model
Qualitative
Design and
Quantitive
Analyse
9
Feasible options
Super Structure Sub Structure Riverbank
Replacement Rip Rap Method Abutment + Gravity Wall
Members are replaced Versatile, readily sourced, easily System
with Aluminum placed and can be specified to suit Abutment used under bridge and Gravity
particular flow conditions wall in the river bank
11
Design EN19353944 - Sidhan M.N.
Stage
Establishement of Co-ordinates
12
Key Design Aspects
Environmental Bridge River
HEC-RAS 6.2
Version
13
Key Design Aspects
Flow Capacity Centreline
Cross Section
14
Key Design Aspects
Renovation Centreline
Cross Section
15
Key Design Aspects
Proposed Layout U - Abutment
Model
16
EN19394466 - Thilakarathne H.M.H.N
Cost Planning
Preliminary
Costing
BSR 2022 Unit Rates
HSR 2022
Material List Western
Province
17
Diversion of the River
Shoring of the Sheet Piles in Riverbank
Shoring of the Sheet Piles in around the pier
Compaction of the Soils
Proper arrangement of Rip Rap
U-Abutment construction under the Bridge in banks
Gravity wall construction
Sustainable usages of materials on all stages
18
EIA
Environmental Mitigation and
Setting Monitoring Measures
Physical Through Law and Powers
Biological Vested
Socio-economic
19
Therefore,
Key Design Aspects
might be a Sustainable when
considering as a long term
solution
20
Safety and Health
PREVENTION Risk
CONTROL Risk
EVALUATION Risk