CDP - Group 10 - Presentation

Uploaded by

Hamdan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views23 pages

CDP - Group 10 - Presentation

Uploaded by

Hamdan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Group

CDP Presentation 10

Deduru oya Bridge


project
Introduction OUTLINE
Problem
Identification
Scope

Conceptual Schemes
Feasible Options
Selection

Design Stage
Key Deign Aspects

Cost Plan
EIA
Safety and Health
2
Group
Members
EN19376028 - Farhan U.M.M

EN19390406 - Mazariq M.S.M

EN19353944 - Sidhan M.N.

EN19394466 - Thilakarathne
H.M.H.N

3
EN19376028 - Farhan U.M.M

1. Introduction
Client Brief

Railway Structure Protection

River Bank Stability


Problem Identification/Issues
Issues

Bridge River Bank

Under Bridge Soil


Super Structure Sub Structure Soil Erosion
Erosion

5
EVIDENCES OF PROBLEMS

6
SCOPE

Bridge Protection Bank Stability

Bridge Pier
Earth Retaining
Scouring
Walls

Aging of Elements Abutement

7
Conceptual EN19390406 - Mazariq M.S.M
Schemes

Stages of Selecting

⬗ Inspections
⬗ Condition Rating Coding System
⬗ Selection of Alternatives

8
conceptual schemes (Cont..)

Model

Qualitative
Design and
Quantitive

Analyse

Recommend Most Suitable Solutions

9
Feasible options
Super Structure Sub Structure Riverbank
Replacement Rip Rap Method Abutment + Gravity Wall
Members are replaced Versatile, readily sourced, easily System
with Aluminum placed and can be specified to suit Abutment used under bridge and Gravity
particular flow conditions wall in the river bank

Renovation Collar Method Cantilever T-Type Wall +


Steel Members are Horizontal plates attached around Gabion
subjected to Welding, the pier at or below bed level, to
Abutment used under bridge and Gabion
Anticorrosive Painting, reduce the intensity of the
wall in the river bank
Replacing certain parts downward current at the pier by
using Steel etc.. deflecting and interrupting it

10 Multi Criteria Analysis


Selections
Renovation

Rip Rap Method

Abutment + Gravity Wall System

11
Design EN19353944 - Sidhan M.N.
Stage
Establishement of Co-ordinates

12
Key Design Aspects
Environmental Bridge River

Soil Flow Capacity

HEC-RAS 6.2
Version

100-year return period


1 D Model
Steady State Condition

13
Key Design Aspects
Flow Capacity Centreline
Cross Section

14
Key Design Aspects
Renovation Centreline
Cross Section

15
Key Design Aspects
Proposed Layout U - Abutment
Model

Gravity Wall Shoring

16
EN19394466 - Thilakarathne H.M.H.N
Cost Planning

Preliminary
Costing
BSR 2022 Unit Rates
HSR 2022
Material List Western
Province
17
 Diversion of the River
 Shoring of the Sheet Piles in Riverbank
 Shoring of the Sheet Piles in around the pier
 Compaction of the Soils
 Proper arrangement of Rip Rap
 U-Abutment construction under the Bridge in banks
 Gravity wall construction
 Sustainable usages of materials on all stages

Reasons for Cost


Increments

18
EIA
Environmental Mitigation and
Setting Monitoring Measures
Physical Through Law and Powers
Biological Vested

Socio-economic

Environmental Management Plan


Mitigate potential adverse impacts to
physical, biological and social‐economic‐
cultural resources from construction,
operation and closure

19
Therefore,
Key Design Aspects
might be a Sustainable when
considering as a long term
solution

20
Safety and Health

PREVENTION Risk

CONTROL Risk

EVALUATION Risk

HEALTH RISK Possibility of occupational ill-health


ASSESSMENT

INDIRECT Respective Project

DIRECT Respective Project

21
22
Thank you

23