Department of Civil Engineering
26th Batch
CE 400
Project & Thesis
Welcome to Our
Presentation
THESIS TITLE
A CASE STUDY ON PEDESTRIAN FLOW THROUGH
THE MAJOR THREE FOOT-OVERBRIDGE
[MIRPUR-1, JAMUNA FUTURE PARK &
MIRPUR-10]
Presented By: Supervised By:
Md.Omar Faruk Md. Asif Ahmed
ID: 170120511 Senior Lecturer
Department of Civil Engineering
Md.Abdul Momin European University of Bangladesh
ID: 180220276
Md.Raju Ahmmed Co-Supervisor
ID: 210120284 --------------------
Lecturer
Department of Civil Engineering
European University of Bangladesh
Contents
Introduction
Objective of the Study
Study Area
Methodology
Data Collection & Analysis
Results & Discussion
Limitation
Recommendation
Introduction
A foot-over bridge or a pedestrian bridge is a
bridge designed for pedestrians.
There are 49 foot over – bridges in the DHAKA
NORTH city corporation.
Despite the presence of numerous foot over-
bridges, most of the pedestrians prefer to cross the
street rather using the foot over bridge.
For this reason, pedestrians become more vulnerable
and do faults when crossing the roads.
Therefore, in our research we are trying to discuss the
condition, safety,
& uses of Mirpur -1, Jamuna future park & Mirpur-10
foot over bridge.
Objective
To determine the pedestrian flow in different foot-
over bridges.
To determine the percentage of pedestrian
crossing the foot-over including age-based
behavior.
To determine the opinion of pedestrian on using
foot-over bridge instead of busy roadway.
To compare the pedestrian flow between different
foot-over bridges.
Location : MIRPUR-1
Date : 25-08-2024
Day : Sunday
Time : 9am to 10am
Weather : Sunny
Location : JAMUNA FUTURE PARK
Date : 26-
08-2024
Day : Monday
Time : 9am to 10am
Weather : Sunny
Location : MIRPUR-10
Date : 27-08-2024
Day : Tuesday
Time : 9am to 10am
Weather : Sunny
Methodology
Selection of Study Area
Preparing Questionnaire Survey Preparing Questionnaire Survey
(On the Foot-Over Bridge) (Under the Foot-Over Bridge)
Conducting Questionnaires
Survey Data Collection
Taking pictures & Observing views of Foot-over
Bridge Data analysis
(Table, Pie-chart, Bar-chart)
Result &
Discussion
Recommendation
Data Collection
Location Time Male Female Child Total
Pedestrian
Flow (ped/hr)
Mirpur-1 9am to 10am 920 450 280 1650
Jamuna 9am to 10am 2530 2315 810 5656
Future Park
Mirpur-10 9am to 10am 3560 980 420 4960
Data Collection
Foot User Non-user
Over
Male Femal Child Total Male Female Child Total
Bridge Pedestrian Pedestrian
e
Flow Flow
(ped/hr) (ped/hr)
Mirpur-1 920 450 280 1650 1158 780 390 2328
Jamuna 2530 2315 810 5656 - - - -
future
park
Mirpur-10 3560 980 420 4960 3823 535 128 4486
Total 7010 3745 1510 12266 4981 1315 518 6814
Data Collection
Foot- Age
Over
Child Young/ Adult Middle Old Total
Bridge
(0-12) Teenager (20-30) Age Adult Age Pedestrian
(13-19) (31-59) (<60) Flow
(ped/hr)
Mirpur - 1 70 250 520 660 150 1650
Jamuna 95 430 1660 2861 310 5656
future
park
Mirpur -10 65 313 1790 2477 315 4960
Total 230 993 3970 5998 775 12266
Questionnaire Survey Form
Questionnaire Survey
1. Do you think Foot-over Bridge is 2. Do you think Foot-over Bridge is
wide enough? more time Consuming?
5%
11%
20%
25%
64% 75%
Yes Yes
No No
No Comment No Comment
Questionnaire Survey
3. Do you feel safe when crossing 4. Do you think the Foot-over Bridge
the Foot-over Bridge ? needs modernization?
4% 7%
30%
52%
44%
63%
Yes Yes
No No
No Comment No Comment
Questionnaire Survey
5. Is the Foot-over Bridge far better 6. Do you prefer Foot-over Bridge
than the zebra crossing ? while carrying luggage?
15%
18%
35%
60%
22%
50%
Yes Yes
No No
No Comment No Comment
Questionnaire Survey
7. Do you feel comfortable when you 8. Do you think Foot-over Bridge is
are using the Foot-over Bridge ? clean enough to use?
9% 12%
25%
30%
61% 63%
Yes Yes
No No
No Comment No Comment
Questionnaire Survey
9. Do you think there should be light 10. Are you pleased with the hawker's
on the Foot-over Bridge ? presence on the Foot-over Bridge ?
10% 16%
27%
48%
42%
Yes 57% Yes
No No
No Comment No Comment
Questionnaires Survey on Foot-Over Bridge
Data Analysis Mirpur-1
15.8
14.2 15.0
12.6 11.0
9.5
5.2 7.3
3.1
g rt y ep ity alk rs alk ss
in fo irt e r k e n e
um m yd St e cu gw w rw zi
n s
isc
o
v e r
are tS l on Ha fo La
Co rd e ai
r en a for an
ar t c e rt sp
i m
e
syo se S
su
fi
T ak
fo o f
T
n ea ci liti I n o m ge
lu a i sc rta
e e gF D
Sh
o
F
ssin
o
Cr
Reason for not using the Mirpur-1 Foot-
Over Bridge
Data Analysis Mirpur-10
20.5
19.8
15.1 14.1
11.6
5.5 6.1
3.8 4.1
in
g
o rt rty e p
ri ty a lk e rs alk e ss
f i e k n
um o m y d St e cu g w
aw r w zi
n s
i sc v e r
are t S l on H fo La
C o d e ir n a o r an
o r ar ta ce e t f sp
e S fi k r
i m as y
tise su T a fo of
T
n e cili In
com a ge
lu F a is o rt
e g D
Fe is n Sh
r os
C Reason for not using the Mirpur-10 Foot-
Over Bridge
Result & Discussion
According to our research/data it has been seen that
Foot-Over Bridge is mostly used by male more than
female & child.
From the bar-chart for Mirpur-1, maximum
pedestrians are confess that they are not using the
Foot-Over Bridge for insufficient security.
According to the table it has been seen that Middle
Age Adult (31-59) people uses the Foot-Over Bridge
more than others.
From the pie-chart for Mirpur-10 most of people
are comfortable to use Zebra-Crossing not the Foot-
Over Bridge.
According to the Survey for Jamuna future park
foot over bridge is the most busiest than others.
Limitations
People don't commonly respond to questions,
which is a problem we encountered frequently.
We encountered numerous pedestrians and
hawkers while gathering data.
It was difficult to talk to people due to many
vehicles under the foot over bridge.
People were in a hurry and found it difficult
to cooperate with us.
Recommendation
Facilities of Foot-Over Bridge should be
increased like, Escalator.
CC-TV Camera.
Proper Lighting System.
Pedestrian securities should be increased.
Construct Foot-Over Bridges at necessary point like
Mirpur-1 Sony Hall Chatter.
Pedestrians should know the necessity of using
Foot-Over Bridge.
Government should take proper action for the
Hawkers & Beggars who lives on the Foot-Over
Bridge.
Group Photos
THANK YOU