Hazard Identification Risk Assessment and Control

The document outlines the procedures for hazard identification, risk assessment, and control within a workplace. Staff are required to report hazards, and safety officers conduct annual assessments using a HIRAC form to evaluate risks based on legal requirements, severity, and probability of occurrence. High-risk hazards must be documented and monitored, with appropriate control measures implemented based on a hierarchy of control.

Uploaded by

ronelie mendoza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views14 pages

Hazard Identification Risk Assessment and Control

The document outlines the procedures for hazard identification, risk assessment, and control within a workplace. Staff are required to report hazards, and safety officers conduct annual assessments using a HIRAC form to evaluate risks based on legal requirements, severity, and probability of occurrence. High-risk hazards must be documented and monitored, with appropriate control measures implemented based on a hierarchy of control.

Uploaded by

ronelie mendoza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Hazard Identification,

Risk Assessment and


Control
Prepared by: Ma. Beatriz Angelica C. Bukid, RMT,SO3
Procedure
Hazard Identification and Risk Assessment

 All staff are expected to report identified


hazards in their respective workplace

 Reporting to safety officer either through


incident report form or any related
documentation
Hazards and risks can also be identified during regular
safety rounds or environment care rounds.

At least once a year, hazard identification and risk


assessment using HIRAC form, shall be done by the
safety officers, department safety representatives, and
staff.

For each data required by the form, refer to the following:


 Area
 Process
 Hazard
 Type of hazard
Type of hazard

 Biological hazard

 Physical hazard
 Chemical hazard

 Ergonomic hazard
Current Risk Control – For each identified hazard,
determine whether there is an existing risk control
documented and implemented to the level of risk control
available,

Risk Assessment – For each identified Hazard, analyze


the risk based in terms of number scoring

Following are the criteria to be assessed:


a) Legal requirement
b) Severity
c) Probability of occurence
Legal Requirement
LEGAL REQUIREMENT

1 Without Legal Requirement

2 With legal requirement, with evidence of compliance

3 With legal requirement, with no evidence of compliance

4 With notice of violation issued


Severity
Severity

1 Minor Negligible

2 Serious

3 Critical

4 Catastrophic
Probability of Occurrence
Occurrence

1 Remote
Unlikely to occur (may happen sometime in 5 to 30 years)

2 Occasional
Possible to occur (may happen sometime in 2 to 5 years)

3 Probable
Probably will occur (may happen several times in 1 to 2 years)

4 Frequent
Likely to occur immediately or within a short period (may happen several
times in 1 year)
Risk Evaluation
 Risk Priority Number (RPN) = obtained in multiplication of
the numerical equivalent of all Risk Assessment criteria

RPN = Legal Requirement x Severity x Probability of


Occurrence

High risk 34-64


Medium risk 16-33
Low risk 1-16
Risk Treatment
 For hazard that will be identified as High Risk =/> 34,
Provide an appropriate control based on the hierarchy
of control below

eliminatio
n

substitution

Engineering

administrative

PPE
Hazards and risks that fall under high risk (RPN= 34-
64) shall be documented in the risk registry for
monitoring and reassessment after the
implementation of risk treatment or control measures

Safety officer shall provide summary of identified and


reported hazards, including mitigation plan or control
measures
Monitoring and Review
 All hazards identified with low significance must be
monitored and re-evaluated annually by the
department

 All hazards identified with medium significance must


be monitored and re-evaluated quarterly by the SO
and Managing head

 All hazards identified and are registered in the HIRAC


must be communicated and reported to the Top
Management thru Management review
Department/Area:
Date of assessment/re-assessment:
Issue No.:

Hazard Identification Risk Assessment Risk control *if risk >= 34


Legal Date of
Process/Activity Hazard Risk Hazard Condition Current Control Occurrence Severity Risk Level Type of Control Recommended Measure
Requirement Correction