The document outlines the status of 2G cluster optimization activities in the Bali area as of October 2010, detailing various trials and investigations conducted by Nokia Siemens Networks (NSN) across multiple inbuilding locations. It highlights the performance of different clusters, noting improvements and ongoing issues related to drop calls and hardware faults. Additionally, the document includes key performance indicators (KPIs) for various clusters, indicating trends in service quality such as SDSR and HOSR metrics.

Uploaded by

Mokbel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views13 pages

2G Cluster Optimization v3 Exclusion

The document outlines the status of 2G cluster optimization activities in the Bali area as of October 2010, detailing various trials and investigations conducted by Nokia Siemens Networks (NSN) across multiple inbuilding locations. It highlights the performance of different clusters, noting improvements and ongoing issues related to drop calls and hardware faults. Additionally, the document includes key performance indicators (KPIs) for various clusters, indicating trends in service quality such as SDSR and HOSR metrics.

Uploaded by

Mokbel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 13

2G Cluster Optimization

Bali Area
Oktober 2010

Soc Classification level


1 © Nokia Siemens Networks Hotspot Performance Improvement – Bandung Area – February 2010
Activities Status
ITEM ACTIVITY CLUSTER NAME REMARKS STATUS

8 Parameter Trial have already implemented except Service


1 2G Trial 8 parameter trials Layer which shows degradation on TBF failure rate and have Closed
already fallback
Inbuilding 1 MTHR GALLERIA NSN will investigate the drop call increment Open
Inbuilding 2 Discovery NSN have already presented the recommendation for retrofit Closed

Inbuilding 3 Kartika NSN have already presented the Walktest, and no issues found CLosed
Inbuilding 4 Airport NSN will investigate the drop call increment Open
NSN have already presented the Walktest and recommendation
Inbuilding 5 RS Sanglah have already delivered which shows improvement (improper Closed
layering)
2 2G IBS NSN have already presented the Walktest and recommendation
Inbuilding 6 Carrefour Closed
have already delivered which shows improvement (TRX problem)
Inbuilding 7 Le Meridien NSN have already presented the Walktest, and no issues found CLosed
NSN will investigate the MTC problem on 3G network (Ue
Inbuilding 8 Grapari Open
sometime cant be paged on 3G Network)
NSN have already presented the recommendation for New Node
Inbuilding 9 Hotel Nikko Closed
B in Hotel Nikko for coverge enhancement
Inbuilding 10 Bali Intercont NSN have already presented the Walktest, and no issues found Closed
NSN have already present the HR review and shows
Network Closed
improvement on AMR utilization against HR conventional
Resource
3 Half Rate Review
Optimizati Telkomsel propose a trial to clean up the HR conventional by
on info
increasing the HRACTT1 threshold

NSN have already present cluster retune result which shows


Cluster Retune improvement.. And the degradation which observed, already plan closed
for fallback
4 RF Retune
NSN and Tsel agree to implement SFH DCS for Bali Inner which
SFH Proposal support 12/12/12 configuration for the next activity. NSN have info
already present the SFH plan including BSIC & HSN Replan

Soc Classification level


2 © Nokia Siemens Networks
Activities Status
ITEM ACTIVITY CLUSTER NAME REMARKS STATUS

BSC_Id BSC Name DCR/HOSR/SDSR

BSS05 Krobokan2
Degraded/Degraded/Passed

BSS35 Tuban
Degraded/Degraded/Degraded

BSS25 Gunung Islam


2G Cluster Degraded/Passed/Degraded
5
Optimization
BSS08 Medewi
Degraded/Passed/Passed

BSS41 Mas Ubud


Degraded/Degraded/Passed

BSS30 Singaraja
Degraded/Passed/Passed

BSS10 Blah Batu


Degraded/Passed/Passed

Soc Classification level


3 © Nokia Siemens Networks
Network Level Performance

7 8

4 5
3
1

CW 42
6

Exclusion List

1. Due to BCCH Retune  SDSR shown improvement from baseline


2. Due to BCCH Retune but the value still under target.
3. Due to BCCH Retune
 Blue line shown calculation on CW42 with
4. SDCCH capacity review
5. Parameter Trial cells that have problem excluded from
6. Degradation are mainly due to HW Faults calculation.
7. Due to BCCH Retune on BSC
 Cells with problem impected to network
8. Due to BCCH Retune
performance.
Soc Classification level
4 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
Network Level Performance

10

3 6 11

1 4 5 7 8
2
9

42
CW
1. Due to neighbour retune  HOSR shown improvement from
2. Due to neighbour consistency baseline until end of september then
3. Due to neighbour retune
4. Due to neighbour consistency
degraded below the baseline.
5. Due to problematic TRXs was locked and Parameter Trials  Blue line shown calculation on
6. Parameter Trial
7. Someone unlocked the problematic TRXs and degradation on BSC17
CW42 with cells that have problem
8. Some New HW Failure appear especially on BSC35, BSC8, BSC25, excluded from calculation.
BSC7, BSC 10  Cells with problem impected to
9. Due to HW Problem found on BSC05
10. After Locked the problematic TRXs increase on BSC35, BSC25, network performance.
BSC05
11. Classification
Soc HOSRlevel Degraded due to someone unlocked TRXs problem
5 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
Network Level Performance

6
8
2
7
4
1 3 5

42
CW
1. Due to neighbour retune
 TCHDR degraded starting from
2. Due to HW Problem found September 19 exceed baseline.
3. Due to neighbour retune  Blue line shown calculation on CW42
4. Due to neighbour consistency
5. Due to problematic TRXs was locked and Parameter with cells that have problem excluded
Trials from calculation.
6. Someone unlocked the problematic TRXs and  Cells with problem impected to network
degradation on BSC17
7. Some New HW Failure appear especially on BSC35, performance.
BSC8, BSC25, BSC7, BSC 10
8. Due to Remote Transcoder Failure on BSC30 &
Soc Classification level
6 © Nokia BSC41
Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 1 (05) Kerobokan 2

 SDSR at this BSC can reach above 98.5% if


some cells that have problem repaired.
 HOSR shown good improvement and can

reach until 99% if cell with problem already


repaired.
 TCH drop still can’t exceed the target with

value around 0.8%.

Soc Classification level


7 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 2 (35) Tuban

 SDSR at this BSC decreased below 96%.


 HOSR also decreased with value 97.5%

 TCH drop decreased until 1%.

Soc Classification level


8 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 3 (25) Gunung Islam

 SDSR has slight improvement and almost


reach 98% in end of week 42.
 HOSR has slight improvement and reach

97.5% in end of week 42.


 TCH drop decreased until 1.25%.

Soc Classification level


9 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 4 (08) Pantai Medewi

 SDSR has good improvement with last


value can reach 96%.
 HOSR shown good trend and stable at

97.5%
 TCH drop decreased until 0.9%.

Soc Classification level


10 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 5 (41) Mas Ubud

 SDSR stable if compared with baseline.


 HOSR decrease until below 96%.

 TCH drop decreased until 1.2%.

Soc Classification level


11 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 6 (30) Singaraja

 SDSR have slight improvement.


 HOSR shown good trend and value exceed 98%.

 TCH drop decreased with last value 0.9%.

Soc Classification level


12 © Nokia Siemens Networks EDGE Planning & Dimensioning / NSN Strategic Planning & Capacity Management Team
KPI Performance – Cluster 7 (10) Blah Batuh

 SDSR & HOSR have slight improvement.


 TCH drop decreased until 1%.

Soc Classification level