B1. Pelaksanaan Kegiatan Pengawasan Dan Evaluasi Pekerjaan Konstruksi Proyek W5 April - Area-Unit (Piperack U-321 R10, R11)

The document provides a construction progress mapping for AG piping in the interconnecting piperack areas U321-R10 and U321-R11, detailing the status of various pipe spools. It includes legends indicating delays, in-progress, and completed tasks, as well as documentation requirements for repair support. The documentation also references internal testing and finishing needs for the projects.

Uploaded by

yagus7697
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views7 pages

B1. Pelaksanaan Kegiatan Pengawasan Dan Evaluasi Pekerjaan Konstruksi Proyek W5 April - Area-Unit (Piperack U-321 R10, R11)

The document provides a construction progress mapping for AG piping in the interconnecting piperack areas U321-R10 and U321-R11, detailing the status of various pipe spools. It includes legends indicating delays, in-progress, and completed tasks, as well as documentation requirements for repair support. The documentation also references internal testing and finishing needs for the projects.

Uploaded by

yagus7697
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 7

APPENDIX A

CONSTRUCTION PROGRESS MAPPING

@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
CONSTRUCTION PROGRESS MAPPING AG PIPING
AREA/UNIT – INTERCONNECTING PIPERACK – U321 – R10

PR-321-01 (R10
C)

PR-321-01 (R10
A)
PR-321-01 (R10
B)

Legend: Delay In-progress Complete


@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
CONSTRUCTION PROGRESS MAPPING AG PIPING
AREA/UNIT – INTERCONNECTING PIPERACK – U321 – R11

PR-321-02 (R11)

Legend: Delay In-progress Complete


@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
APPENDIX B
DOCUMENTATION

@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
DOCUMENTATION
AREA/UNIT – INTERCONNECTING PIPERACK –
U321 – R10

1 3

Fit up welding pipe spool Internal and Official test PKG 321-AG-HS-0001-P1

2 4

Require repair support (Finishing) Require repair support (Finishing)

@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
5
DOCUMENTATION
AREA/UNIT – INTERCONNECTING PIPERACK –
U321 – R11

1 3

Require repair support (Finishing) Require repair support (Finishing)

2 4

Require repair support (Finishing) Require repair support (Finishing)

@kilangpertamina.balikpapan
@kilangpertamina.balikpapan
6
DOCUMENTATION
PMAR / PEKA