ACADEMIA
PROJECTS
Abu Qir Petroleum
Location:
Alexandria, Egypt.
Products inquired per project:
Two Staircases.
Project main scope:
Design, Fabrication and Erection of Two Staircases at Abu
Qir Petroleum.
TAQA Suez Truck Loading Terminal
Location:
TAQA Arabia Suez Fuel Terminal.
Products inquired per project:
Additive Injection System.
Project main scope:
Mechanical Design and Fabrication of Additive
Injection System at TAQA Suez Truck Loading
Terminal.
RTG connections and inline PT
Location:
Ismailia, Suez and Safaga Fuel Terminal.
Products inquired per project:
RTG connections and adjustable threaded level
switch plug.
Project main scope:
Mechanical Fabrication of RTG connections and
inline PT Army Fuel Terminal.
EXXONMOBIL Suez and Cairo Fuel Terminal
Location:
Suez Fuel Terminal.
Products inquired per project:
Inline conductivity Sensors installation.
Project main scope:
Mechanical Fabrication of Piping to install inline
conductivity Sensors at Exxon Mobil Fuel Terminal.
CPC_Mostrod Fuel Terminal
Location:
Mostord - Cairo.
Products inquired per project:
Metering Skids.
Project main scope:
Mechanical Fabrication of Metering Skids ,
Petrojet, CPC.
Primary Vapor Recovery System
Location:
Total Mostord and Suez Fuel Terminal - Cairo.
Products inquired per project:
Primary Vapor Recovery System.
Project main scope:
Fabrication of the First primary vapor venting
system in Total Egypt.
KHALDA PETROLUIM CO.
Location:
KHALDA El_Salam field, Matrouh.
Products inquired per project:
24’’ Manhole Covers RTG And RTD Devices.
Project main scope:
Fabrication and Installation Of 13 Manhole
Covers.
Supply and installation of OPGD
Location:
EXXONMOBIL, Mex Alexandria and
Mostorod Cairo Terminals.
Products inquired per project:
MSA Open Path Gas Detector (OPGD)
system, designed for continuous gas
monitoring and early detection of hazardous
leaks.
Project main scope:
The project scope included the supply,
installation, commissioning, and startup of the
MSA OPGD system to improve safety and
operational efficiency at the fuel terminals.
Installation of RTG System
Location:
Petro Kareem Field, located in Ras Ghareb.
Products inquired per project:
The main products involved were the RTG
(Radar Tank Gauging) Rosemount system and a
remote signal indicator, which was integrated
with the PLC system for accurate measurement
reference.
Project main scope:
The project aimed to install the RTG system on a
fuel tank, ensuring precise level monitoring and
integrating it with the site's control system. The
system included a remote signal indicator
positioned at the tank bottom to relay real-time
data to the PLC.
Supply & Installation of UPS
Location:
CPC’s facility in Mostorod Fuel Terminal
Products inquired per project:
The primary product involved was an
Uninterruptible Power Supply (UPS) system,
essential for ensuring continuous power to
critical operations at the terminal.
Project main scope:
The project covered the supply, installation,
commissioning, and startup of the UPS system
at the CPC facility. This included selecting the
appropriate UPS capacity based on site load
requirements and ensuring a reliable power
backup solution.
HHLCO Pipelines Modifications
Location:
ExxonMobil’s Alexandria Fuel Terminal
Products inquired per project:
The main product involved was a Motor-Operated
Valve (MOV), which was to be installed on the three
main receipt pipelines: MoGas 92-95, MoGas 80,
and the Diesel pipeline.
Project main scope:
The project aimed to install an MOV valve at the
terminal’s main receipt area pipelines, ensuring
improved control and automation of fuel flow
operations.
Linear Heat Detector (LHD) system
Location:
ExxonMobil’s fuel terminals in Alexandria, Suez, and
Cairo.
Products inquired per project:
The main product involved is a Linear Heat Detector
(LHD) system, which is being installed around storage
tanks to provide early fire detection.
Project main scope:
The objective of the project is to install LHD sensors
around the tanks at varying heights, ranging between 3
to 8 meters, while eliminating the need for scaffolding.
This ensures a safer, faster, and more cost-effective
installation process.
Supply & Installation of Shut-Off Valves
Location:
ExxonMobil Mex (LOBP) in Alexandria
Products inquired per project:
The main product involved was the Spirax Shut-Off
Valve, installed at the steam inlet to enhance safety by
preventing overheating that could lead to the formation
of hydrogen sulfide (H₂S), a toxic gas.
Project main scope:
The project focused on installing Spirax Shut-Off Valves
at key steam inlets, ensuring controlled steam flow and
mitigating the risk of H₂S production, thereby
improving workplace safety and process efficiency.
Supply & Installation of Lifting System
Location:
ExxonMobil Mex (LOBP) in
Alexandria
Products inquired per project:
The main product involved was a servo
balancer equipped with a GRABO
suction cup, powered by a battery-
operated lifting system to assist in
handling 4- and 5-liter unscrambler
funnels.
Project main scope:
The objective was to install a lifting
system to ease the manual lifting of
funnels, each weighing approximately
20 kg, which needed to be changed
every two days. The system aimed to
enhance ergonomics, reduce operator
fatigue, and improve workplace safety.
Control Panel troubleshooting and resolving
issues
Location:
Misr Petroleum Company facility in Alexandria
Products inquired per project:
The focus of the project was on troubleshooting and
resolving issues within the fire alarm system, specifically
the Fire Alarm Control Panel.
Project main scope:
The primary objective of the project was to troubleshoot
an error in the Fire Alarm Control Panel, where the ex
flasher was causing the panel to detect an open circuit.
Preventive Maintenance of Fire Alarm
System
Location:
ExxonMobil 10th of Ramadan (LOBP)
Products inquired per project:
The project focused on the maintenance of various fire
alarm components, including the Fire Alarm Control
Panel (FACP), smoke detectors, heat detectors, beam
detectors, and more.
Project main scope:
The project focused on the maintenance of various fire
alarm components, including the Fire Alarm Control
Panel (FACP), smoke detectors, heat detectors, beam
detectors, and more.
Supply & Installation of UPS
Location:
ExxonMobil 10th of Ramadan (LOBP)
Products inquired per project:
The project involved the supply and installation of a new
10kVA Uninterruptible Power Supply (UPS) from APC
by Schneider Electric.
Project main scope:
The main scope of the project was to ensure that the
UPS was loaded with critical loads, such as the Fire
Fighting Control Panel, to maintain uninterrupted
power supply during emergencies.