<Project Name> Project Brief
<date> <Project Manager name> <regional project-id>
Template version 2.0
1. Mandate
Project Background Rationale for Action
Please summarize the project background
<project name> <project ID>
Project Governance Governing Body
Project Manager Project Board Executive Sr. User Sr. Supplier Sponsor
Name(s)
Project Objectives
Please summarize the project objectives in a list (1-5) and link them to your company KPIs (e.g. risk, profit, cost)
Project Planning
Milestone
Start date End date Launch date:
Budget / Resources
Date EUR x 1000
Cash out 2011
Next step (specify 1,2,3) Overall project
xx-xx-xxxx xx-xx-xxxx xx-xx-xxxx +n/-n
P&L 2011
Cash out 2012 P&L 2012 Tolerance (%) Benefits Resources Int n mandays n mandays n mandays n mandays Resources Ext +n% / -n% +n% / -n%
Project Deliverables
Please summarize the project key deliverables in a list (1-5)
Tolerance (calendar days):
Constraints & Risks
Please describe any limitations you can think of
Project Dependencies In Scope
Please summarize what is in scope
Out of Scope
Please summarize what is out of scope
Project
Dependency
Document Management
Revision History
Version Revision Date Status Summary of Changes
<project name> <project ID>
By
Approvals
This document requires the following approvals. Signed approval forms are filed in the Management section of the project file. Name Signature/Approved
Executive Senior User Senior Supplier
Title
Date of issue
Version
For each a description needs to be provided on the recommnedations building block (3).
Distribution
This document has been distributed to.
Name Title Date of issue Version
3. Project Background / Dependencies
Context of the Project
<< Why is it needed, whats the history, how does it fit in a project programme (which?)? >>
<project name> <project ID>
Project name
Project name
This Project
Project name Project name
Waiting for output from Delivers output to
Project name
4a. Scope (1/2)
Geographic Area
Benelux CRE AP IM global Country x Country y
<project name> <project ID>
Involved Processes
Process name 1> <Process name 2>
Client Groups
Distribution Channels
Agent Broker Bank Direct Flex Force
Involved Systems
<System name 1: Interface change, Set up New module decom>
<System name n : Interface change, Set up New module decom>
Involved Departments
<dep. name>
Involved Products
?
<xxx name 1> <xxx name 2>
<Process name n>
<xxx name n>
Key deliverable
<name deliverable>
Point of Value
Weight %*
Depth (project execution phases - deployment - handover benefit realization)
<description of the steps to be carried out>
Total PoV Out of Scope
<description of the out of scope items>
PoV: Business capabilities to measure project execution success
4a. Scope (2/2)
Key deliverable
<name deliverable>
<project name> <project ID>
Point of Value
Weight %*
Depth (project execution phases - deployment - handover benefit realization)
<description of the steps to be carried out>
Total PoV
100%
<description of the out of scope items>
Out of Scope
4b. Product Breakdown Structure
1 Milestone 2 Milestone
<project name> <project ID>
1.1 Key deliverable
1.3 External deliverable
2.1 Group A
2.2 Group B
2.2.1 Sub deliverable 1.1.1 Sub deliverable 1.1.2 Sub deliverable 1.1.3 Sub deliverable 2.1.1 Sub deliverable 2.1.2 Sub deliverable 2.2.2 Sub deliverable
1.1.3.1 Sub deliverable
1.1.3.2 Sub deliverable
2.2.3 External deliverable
Legend Milestone Group (Sub) Product/ deliverable External deliverable
5. Acceptance Criteria
(to accept completed project)
MoSCoW M/S/C/ W Topic
Target dates Major functions Appearance Personnel level required to use/operate the product Performance levels Capacity Accuracy Availability Reliability Development costs Running costs Security Ease of use Timing 8
<project name> <project ID>
Definition in measurable terms of what must be done for the final product to be acceptable to the customer and staff who will be affected.
Current level (situation before the project)
Acceptance level (acceptable at hand-over)
6a. Impact Analysis
Impact Level Description of the Impact
<project name> <project ID>
Low
Commerce
What is the most important from a commerce perspective (e.g. client satisfaction, increased saels, new products, .)
Medium
People
(incl. culture & performance): What has the most important impact on the people? What main departments/functions will be affected? Approximately how many people are affected by the solutions set in your project (change targets)? To what extent are you aiming to hire, retain or lay off people? How does the realization of your project help in achieving a common winning performance culture? (one aligned organizational culture and mindset, and act and think as one team with local teams focused on the customer)
Organisation
Medium
What are the most important organizational changes? E.g. structure, roles & responsibilities, competencies, payment structure?
Processes
High
What are the most important process changes? Which processes are you changing? Are you aiming at modifying or fully redesigning processes?
Technology
High
What are the most important system changes? Are you aiming at replacing, modifying or building new systems?
Facilities, Legal, Housing
Low
What are the most important changes in facilities / locations? E.g. centralizing, opening new locations, closing locations?
6b. Project Approach
Developed In House Project name Package Based on Specific Technology Based on existing product
Legend
<project name> <project ID>
Big Bang implementation In stages, rolling wave planning
Alternative A
Alternative B
Road to follow
Alternative path (not chosen)
Alternative C
Comments
10
6c. Assumptions
A/A
1 2 3 4 5 6
<project name> <project ID>
Title
Description
Project Critical Date
Impact on the Project
Low Medium High
11
7b. Risks
Risk description
Provide a description of the risk
<project name> <project ID>
Impact assessment
Provide a description of the impact
Probability
Rare / Unlikely / Possible / Likely / Almost certain
Impact
Insignificant / Minor / Moderate / Major / Catastrophic
Priority
Low / Medium / High / Critical
Mitigating action
Provide a description of the mitigating action
Date to be Risk owner resolved
xx-xx-xxxx Provide the name of the risk owner
Low Medium
High
Critical
To be reported to Project Board
Risk Priority Levels
once a month (almost certain) once a quarter (likely) once a year (possible) once every 5 years (unlikely) once every 10 years (rare) 5 4 3 2 1 Medium High Medium Medium low Medium low low low low Insignificant High Critical High High Medium High Medium Medium low Medium Minor Critical Critical Critical Critical High Critical High High Medium High Moderate IMPACT Critical Critical Critical Critical High Major Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical Catastrophic
PROBABILITY
12
8a. Cost and Benefit Cash Flow Streams
<project name> <project ID>
13
9. Organisation
Sponsor
<project name> <project ID>
Project Board <project name>
Executive/Owner Sr. User Sr. Supplier
Other Stakeholders
Project Manager <name> Project Assurance <name> (PMO) <name> (Expert) <name> (Architecture) Project Team <project name>
<Lead Team X> <name> <name> <name>
<Lead Team Y> <name> <name> <name>
<Lead Team Z> <name> <name> <name>
14
10. Project Plan / <date>
2011 Jan Feb Mar Apr May Jun Jul Aug Sept
Requirements gathering
Business requirements Functional requiremetns
<project name> <project ID>
Oct
Nov
Approval of requirements by Project Board Product design and build of prototype
First design Review design
Build prototype
Testing
FAT UAT
Roll out / implementation
Prepare for roll out
Legend
Milestone Stage 2 Tolerance: =/- xx days 15 Stage 3 Stage 4
Local communication and training local organization
20. Initiation Stage Plan / <date>
2011 date date date date date date date date date
PID preparation
Detail Business requirements Define PoVs and deliverables
<project name> <project ID>
date
date
Detail functional requirements
Detail System requirement s
Prepare Quality Plan Prepare Comm. Plan Resourc e Planning Create Project Plan Refine Business Case PID quality approval
PID Approval by Project Board
Legend
Milestone
Tolerance: =/- xx days
16
11. Resources / <date>
Needed for PID creation
<project name> <project ID>
Deliverable
Name
Role
Department / Vendor name
Mandays/ week
Start-date
Enddate
Purch. Tariff incl VAT
Total planned Mandays
Total cost
Total cost
17
14. Budget Details / <date>
Needed for PID creation
<project name> <project ID>
Project Budget Details
Cost Category
CAPEX (Investments) Software Hardware Other (IT or depreciated assets) OPEX (cost out of pocket)
Currency:
Budget Approved
0
EUR
Budget Forecast (total)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A
Change Requests (+/-)
0
Actual Costs
0
Committed Costs
0
Estimated to Complete
0
Contingency RESOURCES MDs Internal Staff MDs - IT Internal Staff MDs - non IT Total Cost (OPEX incl. internal staff cost) 0 0 0 0 0
N/A
N/A
N/A
N/A
N/A
OPEX Budget approved Actual Costs Commited Costs Remaining Budget Budget usage [%] 0 0 0 0 N/A
Resources 0 0 0 0 N/A Estimated to Complete Budget Forecast (total) Bugeted - Forecasted Forecasted Budget Usage [%]
OPEX 0 0 0 N/A
Resources 0 0 0 N/A
18
<Project Name> Project Initiation Documentation
<Date> <Project Manager name> <Regional Project-id>
Version 2.0
Document Management
Revision History
Version Revision Date Status Summary of Changes
<project name> <project ID>
By
Approvals
This document requires the following approvals. Signed approval forms are filed in the Management section of the project file. Name Signature/Approved
Executive Senior User Senior Supplier
Title
Date of issue
Version
For each a description needs to be provided on the recommnedations building block (3).
Distribution
This document has been distributed to.
Name Title Date of issue Version
20
PID
Please include all building blocks from the PB except the initiation stage plan, resources and budget.
21
11. Resources
Deliverable Name Role Department / Vendor name Mandays/ week Startdate Enddate
<project name> <project ID>
Purch. Total Resource Tariff planned Total Resources manager incl Mancost commited? name VAT days
Total cost
22
12. Budget Details / <date>
Project Budget Details
Cost Category
CAPEX (Investments) Software Hardware Other (IT or depreciated assets) OPEX (cost out of pocket)
<project name> <project ID>
Currency:
Budget Approved
0
EUR
Budget Forecast (total)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A
Change Requests (+/-)
0
Actual Costs
0
Committed Costs
0
Estimated to Complete
0
Contingency RESOURCES MDs Internal Staff MDs - IT Internal Staff MDs - non IT Total Cost (OPEX incl. internal staff cost) 0 0 0 0 0
N/A
N/A
N/A
N/A
N/A
OPEX Budget approved Actual Costs Commited Costs Remaining Budget Budget usage [%] 0 0 0 0 N/A
Resources 0 0 0 0 N/A Estimated to Complete Budget Forecast (total) Bugeted - Forecasted Forecasted Budget Usage [%]
OPEX 0 0 0 N/A
Resources 0 0 0 N/A
23
13a. Quality Plan
Key Deliverable
<key deliverable 1>
<project name> <project ID>
Quality Criteria (Business Requirements)
<Quality criteria 1> <Quality criteria 2> <Quality criteria n>
To be reviewed by (on behalf of Sr. User)
<name 1> <name 2> <name n>
To be reviewed by (on behalf of Sr. Supplier)
<name 1> <name 2> <name n>
<key deliverable 2>
<Quality criteria 1> <Quality criteria 2> <Quality criteria n>
<name 1> <name 2> <name n>
<name 1> <name 2> <name n>
24
14. Benefits Review Plan
Quantification (non) Financial Benefits (KPI) Who is accountable When to achieve Resources needed to carry out review Baseline measures
<project name> <project ID>
How will the performance of the projects products (deliverables) be reviewed
25
15a. Stakeholders Map
Position stakeholders on the map
1 Importance of the stakeholders to the organisational activity
<project name> <project ID>
Key stakeholders need to accept the objectives and will be fully engaged
Low
Medium
High
Name
Participation project board Sign-off business requirements
Demo product
Potential impact of organisational activity of the stakeholders
High
Name
Risk
Name Compliance
Weekly highlight reports & issue log Regular business update meetings Operational acceptance
2
Stakeholders need to agree the translation of objectives into activities
Medium
Name
Good working relationships to ensure an effective coalition of support for the project Careful monitoring and management as they may be a source of significant risk Progress updates via newsletters
PMO
(Audit)
Stakeholders be kept informed of progress and remedies taken to achieve the objectives
Name
limited monitoring or evaluation Progress updates via newsletters
4
Low
Stakeholders notified of milestone completion
limited monitoring or evaluation
Progress update via newsletters
26
15b. Communication Management Strategy
Project Background What should be known on forehand?
Please summarize the project background
<project name> <project ID>
Analysis
What is the communication issue?
Please summarize the communication issue
Assumptions
Please summarize the communication assumptions in a list (1-5)
Project Communication Action Plan Actions What
1 2 3 4 5 6 Newsletters <milestones> Presentations at (informal) meetings Public newsletter Mass media clippings Lessons learned
Requirements How Responsible Agree with Preparation Approval Adressee
When
27
<Work package name> <Project name>
<date> <Project Manager name> <regional project-id> Version 2.0
Document Management
Revision History
Version Revision Date Status Summary of Changes
<project name> <project ID>
By
Approvals
This document requires the following approvals. Signed approval forms are filed in the Management section of the project file. Name Signature/Approved
Project Manager Senior Supplier
Title
Date of issue
Version
For each a description needs to be provided on the recommnedations building block (3).
Distribution
This document has been distributed to.
Name Title Date of issue Version
29
Work Package
Please include Mandate + Scope + Product Breakdown building blocks from the PID
30
21. Work Breakdown - <project name>
Work Package - <work package name>
<project name> <project ID>
1 Milestone
1.1 Key deliverable
1.3 External deliverable
1.1.1 Sub deliverable
1.1.2 Sub deliverable
1.1.3 Sub deliverable
1.1.3.1 Sub deliverable
1.1.3.2 Sub deliverable
Legend
Milestone Group (Sub) Product/ deliverable External deliverabl e
31
22. Product Description - <project name> Work Package - <work package name> (1/3)
(sub) deliverable
<name deliverable>
<project name> <project ID>
Depth (project execution phases - deployment - handover benefit realization)
<description of the steps to be carried out>
<description of the out of scope items>
Out of Scope
32
22. Product Description - <project name> Work Package - <work package name> (2/3)
Quality criteria
<Quality criteria 1>
<project name> <project ID>
Quality method
<description of how criteria will be checked>
Reviewed by (on behalf of Sr.User)
<name 1> <name 2> <name n>
Reviewed by (on behalf of Sr.Supplier)
<name 1> <name 2> <name n>
<Quality criteria 2>
<description of how criteria will be checked>
<name 1> <name 2> <name n>
<name 1> <name 2> <name n>
33
22. Product Description - <project name> Work Package - <work package name> (3/3)
Layout, Format
<project name> <project ID>
<<Fill in here and replace description of layout, format, often by referring to existing standards or documents>>
<<Fill in here and replace>>
Techniques
Relation to other activities or products
<<Fill in here and replace: activities or products that must be completed first or dependent on the results of this work package.>>
<<Fill in here and replace contact names>>
Contacts
<<Fill in here and replace: e.g. deadlines etc.>>
Delivery requirements
<<Fill in here and replace>>
Additional requirements / Assignments
34
Highlight Report
Please include budget details building block from PID
35
Project Name - Highlight 1/2
Reporting period dd/mm/yyyy dd/mm/yyyy
Objectives of the Project
Project Manager: xxx Project Owner: yyy Project ID: id
Project Cost Center: CC
Project Progress
Start Date: End Date: Revised End Date: Phase [T0-T6]: PoV%: mm/yyyy mm/yyyy mm/yyyy Tx x%
KPI Status Planning Cost Scope Resources Risk Level G G G G L
Milestone/ Main Result
1 <Key Deliverable 1> 2 <Key Deliverable 2>
PoV%
%
Due date
dd/mm/yy
Revised date
dd/mm/yy
Indicator
GREEN AMBER GREEN GREEN
% Complete
70% 40% 100% 0%
Explanation
<brief comments on recent results / scope altered / blocking events
done reporting period
n <Release into production>
n+1 <End Project Report>
dd/mm/yy
dd/mm/yy
Issue
1 2 3
Consequences
In terms of: planning, budget, resources and for other projects
Mitigation Actions
Decisions Needed
36
Project Name - Highlight 2/2
Reporting period dd/mm/yyyy dd/mm/yyyy
Activities executed in the Reported Period
Actvitity
Project Manager: xxx Project Owner: yyy Project ID: id
Project Cost Center: CC
Activities Planned for the Next Period (dd/mm/yyyy dd/mm/yyyy)
Activity
Change requests
Requested date Estimated added/ diminished effort ( +/mandays)
Reason for the change
Description
Status
Estimated added cost
1 2
In terms of: planning, budget, resources and for other projects
37
<Project Name> End Stage Report
<date> <Project Manager name> <regional project-id> Version 2.0
Document Management
Revision History
Version Revision Date Status Summary of Changes
<project name> <project ID>
By
Approvals
This document requires the following approvals. Signed approval forms are filed in the Management section of the project file. Name Signature/Approved
Executive Senior User Senior Supplier
Title
Date of issue
Version
For each a description needs to be provided on the recommnedations building block (3).
Distribution
This document has been distributed to.
Name Title Date of issue Version
39
End Stage Report
Please include updated building blocks from the Mandate, Business Case and the last Highlight Report and the Risk building block
40
25. Recapitulation
Key Deliverables
<project name> <project ID>
Delivered
please explain what was delivered, who approved, any off-specifations, handover
Scope Changes
.(PM) # (Total number of changes)
Project Team
Main Reasons for Budget/Time overrun
...
Budget (Euros)
Actual Budget Original Budget 45000 50000 55000 60000
Duration (Weeks)
Actual Duration Original Duration 0 10 20 30
41
26. Follow-on Action Recommendations
Action
Solve Project Issue 1 Solve Project Issue n Mitigate Risk 1 Mitigate Risk n Recommendation 1 Recommendation n
<project name> <project ID>
Description/Rationale
AO-scan Due date
Y/N Y/N Y/N Y/N Y/N Y/N
Who
Post Project Review Plan Post Project Review meeting
Describes who is going to measure the business case benefits (including how and when) Date and participants for the post project review plan meeting
N.A. N.A.
PM, stakeholders, PMO department PM, PMO department
42
27. Lessons Learned
Lessons Learned
Concentrate on items which can be of use to future projects. Observations on failures and omissions can be as useful as identification of successful elements. Which management processes or procedures worked well? Which management processes have had problems? Was it easy to achieve the required quality? Which quality procedures worked well?
<project name> <project ID>
Were there any weaknesses in quality procedures for specific types of product?
How well did risk strategies work? Were there any unforeseen risks? How well were the risks managed? Was the contingency used? Was training in the management, quality and delivery processes and procedures adequate? Were there recognisable benefits from the level of training given, or recognisable problems caused by lack of training? How well did any support tools work? Could anything have been done to improve skill levels before the relevant work was done?
Remarks: Collecting to be mentioned items during the project life cycle makes life easier at the end. (Lessons Log) What went well, what could be improved? What would you do different if you have to do it again?
43
<Project Name> End Project Report
<date> <Project Manager name> <regional project-id> Version 2.0
Document Management
Revision History
Version Revision Date Status Summary of Changes
<project name> <project ID>
By
Approvals
This document requires the following approvals. Signed approval forms are filed in the Management section of the project file. Name Signature/Approved
Executive Senior User Senior Supplier
Title
Date of issue
Version
For each a description needs to be provided on the recommnedations building block (3).
Distribution
This document has been distributed to.
Name Title Date of issue Version
45
End Project Report
Please include updated building blocks from the Mandate, Business Case and the last Highlight Report
46
25. Recapitulation
Key Deliverables
<project name> <project ID>
Delivered
please explain what was delivered, who approved, any off-specifations, handover
Scope Changes
.(PM) # (Total number of changes)
Project Team
Main Reasons for Budget/Time overrun
...
Budget (Euros)
Actual Budget Original Budget 45000 50000 55000 60000
Duration (Weeks)
Actual Duration Original Duration 0 10 20 30
47
26. Follow-on Action Recommendations
Action
Solve Project Issue 1 Solve Project Issue n Mitigate Risk 1 Mitigate Risk n Recommendation 1 Recommendation n
<project name> <project ID>
Description/Rationale
AO-scan Due date
Y/N Y/N Y/N Y/N Y/N Y/N
Who
Post Project Review Plan Post Project Review meeting
Describes who is going to measure the business case benefits (including how and when) Date and participants for the post project review plan meeting
N.A. N.A.
PM, stakeholders, PMO department PM, PMO department
48
27. Lessons Learned
Lessons Learned
Concentrate on items which can be of use to future projects. Observations on failures and omissions can be as useful as identification of successful elements. Which management processes or procedures worked well? Which management processes have had problems? Was it easy to achieve the required quality? Which quality procedures worked well?
<project name> <project ID>
Were there any weaknesses in quality procedures for specific types of product?
How well did risk strategies work? Were there any unforeseen risks? How well were the risks managed? Was the contingency used? Was training in the management, quality and delivery processes and procedures adequate? Were there recognisable benefits from the level of training given, or recognisable problems caused by lack of training? How well did any support tools work? Could anything have been done to improve skill levels before the relevant work was done?
Remarks: Collecting to be mentioned items during the project life cycle makes life easier at the end. (Lessons Log) What went well, what could be improved? What would you do different if you have to do it again?
49