NUCLEAR POWER CORPORATION OF INDIA LIMITED
(A Government of India Enterprise)
PERFORMANCE LINKED INCENTIVE SCHEME (PLIS)
FOR
EXECUTIVES
Atomic Energy Commission (AEC) - Guidelines :
 (Clause 3.4, Page-35 of AEC Guidelines)
The Schemes will be formulated based on achievement of
milestones/performance by the individual projects/stations or on a
common basis based on the overall achievement of MOU targets/
profit generation, or as a combination of two, as may be considered
necessary, keeping in view the broad objective of sustaining
motivational levels of employees across the Company and/or to aid
greater mobility of personnel within the Company across locations
The performance linked incentives granted together with
perquisites, if any, should be within 50% of Basic Pay or within a
maximum of 5% of the distributable profits of the Company.
However, the Board of Directors may change this ceilings based on
needs and justifications, from time to time.
NPCIL Performance Linked Incentive Scheme
Incentive Parameters Incentive
(%)
Mode of
payment
Incentive linked to
MOU ratings
20% (max.)
of basic pay
Monthly,
Quarterly
NPCIL Annual Capacity Factor
(NACF) Incentive
(70% - 90% Capacity Factor)-
(3% - 15% Incentive)
15% (max.)
of basic pay
Annual
(NACF)
Individual Performance
Related (IPR) Incentive
3% to 12%
(max.) of
basic pay
Monthly
Maximum incentive payable upto CMD level = 47%
Promoted within Minimum Eligibility Period
(MEP)
12%
Promoted within MEP + 1 year 9%
Promoted within MEP + 2 year 6%
Promoted within MEP + 3 year 3%
With regard to IPR Incentive, the incentive
depends on residency period of an Executive in
the current and promotion to the next grade.
YEAR PROFIT BEFORE
TAX
(` in lakhs)
PROFIT AFTER
TAX
(` in lakhs)
2008-09 48077.24 44128.40
2009-10 47405.73 41641.33
2010-11 168764.98 137632.57
2011-12 238165.06 190615.42
Financial Results:
THANK YOU
Governing Rules :
 If an Executive after meeting prescribed norms is
deferred / dropped in the Selection Interview, then
two increments will be reduced from his entitlement
as per the above table.
 An Executive whose grading in the Performance
Appraisal Report or CR is not less than `A3/Good’
will be eligible for a minimum incentive of 3% if his
MEP is beyond MEP+3, irrespective of his
promotion.
PERFORMANCE LINKED INCENTIVE SCHEME IN NPCIL
Introduction of Incentive Schemes in NPCIL :
(a) Common Production Incentive Scheme for employees of
Operating Stations;
(b) Construction Incentive Scheme for employees of Construction
Projects; and
(c) Incentive Scheme for Headquarters employees.
NPCIL PERFORMANCE LINKED INCENTIVE SCHEME
 Objective :
To enhance organizational performance through
improved team work and individual contribution
thereby achieving higher levels of production
and productivity.
 Applicability :
To NPCIL Executives of Operating Stations,
Construction Projects and Headquarters.
 Validity : 01.01.2009 to 31.03.2015

More Related Content

PPT
Presentation on Group - Incentive - scheme
PPTX
Pay For Performance ppt
PDF
Benefits: Safe Harbor 401k
PDF
coca cola Performance Incentive Plan of The Coca-Cola Company (Amended and R...
PPT
Combo Design Presentation
PPTX
Executive compensation
PDF
executivecompensation-140624170937-phpapp01 (1).pdf
PPTX
8. SRC PPT to CASB on 3rd RB Cycle - FINAL 11.pptx
Presentation on Group - Incentive - scheme
Pay For Performance ppt
Benefits: Safe Harbor 401k
coca cola Performance Incentive Plan of The Coca-Cola Company (Amended and R...
Combo Design Presentation
Executive compensation
executivecompensation-140624170937-phpapp01 (1).pdf
8. SRC PPT to CASB on 3rd RB Cycle - FINAL 11.pptx

Similar to NPCIL.ppt (20)

PDF
Client Alert: February 2009
PDF
2 - JEA Comp Committee Appendix_Redacted.pdf
PPT
Terms and Conditions of Tariff presentation
PPT
cerc-3 TARIFF REGULATION OF INDIA 2024 .ppt
PPT
Tariff regulation cerc-3 presentation .ppt
PDF
MHM Messenger: Third Quarter Accounting and Financial Reporting Update
PPTX
STATE LOAD DESPATCH CENTRE ARR ANALYSIS.pptx
PDF
Union Budget 2023-24
PDF
Lr 8891 brochure_1701_b
DOCX
Draft apli
PPTX
dtp final.pptx
PDF
Recruitment policy and procedure
PPTX
Repowering Indian Discoms - Academic Research
PPTX
toyota compensation
PDF
Schwartz shirley utility_efficiencyincentives_2009_10_6
PDF
Energy Efficiency Incentives for Utilities: A Review of Approaches So Far
PPT
Chapter 17
PDF
Automated analytics forecast review
PDF
Poster - How to promove with water and waste price regulation
PPTX
Nps presentation for corporate by nishant sharma
Client Alert: February 2009
2 - JEA Comp Committee Appendix_Redacted.pdf
Terms and Conditions of Tariff presentation
cerc-3 TARIFF REGULATION OF INDIA 2024 .ppt
Tariff regulation cerc-3 presentation .ppt
MHM Messenger: Third Quarter Accounting and Financial Reporting Update
STATE LOAD DESPATCH CENTRE ARR ANALYSIS.pptx
Union Budget 2023-24
Lr 8891 brochure_1701_b
Draft apli
dtp final.pptx
Recruitment policy and procedure
Repowering Indian Discoms - Academic Research
toyota compensation
Schwartz shirley utility_efficiencyincentives_2009_10_6
Energy Efficiency Incentives for Utilities: A Review of Approaches So Far
Chapter 17
Automated analytics forecast review
Poster - How to promove with water and waste price regulation
Nps presentation for corporate by nishant sharma
Ad

Recently uploaded (20)

PPTX
Principal presentation for NAAC (1).pptx
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
Computer System Architecture 3rd Edition-M Morris Mano.pdf
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PDF
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
Design of Material Handling Equipment Lecture Note
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
DOC
T Pandian CV Madurai pandi kokkaf illaya
PDF
Present and Future of Systems Engineering: Air Combat Systems
PDF
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
PPTX
wireless networks, mobile computing.pptx
PDF
Cryptography and Network Security-Module-I.pdf
PPTX
Micro1New.ppt.pptx the mai themes of micfrobiology
PPTX
Management Information system : MIS-e-Business Systems.pptx
Principal presentation for NAAC (1).pptx
August -2025_Top10 Read_Articles_ijait.pdf
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Computer System Architecture 3rd Edition-M Morris Mano.pdf
20250617 - IR - Global Guide for HR - 51 pages.pdf
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
Beginners-Guide-to-Artificial-Intelligence.pdf
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
Amdahl’s law is explained in the above power point presentations
Design of Material Handling Equipment Lecture Note
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
T Pandian CV Madurai pandi kokkaf illaya
Present and Future of Systems Engineering: Air Combat Systems
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
wireless networks, mobile computing.pptx
Cryptography and Network Security-Module-I.pdf
Micro1New.ppt.pptx the mai themes of micfrobiology
Management Information system : MIS-e-Business Systems.pptx
Ad

NPCIL.ppt

  • 1. NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Government of India Enterprise) PERFORMANCE LINKED INCENTIVE SCHEME (PLIS) FOR EXECUTIVES
  • 2. Atomic Energy Commission (AEC) - Guidelines :  (Clause 3.4, Page-35 of AEC Guidelines) The Schemes will be formulated based on achievement of milestones/performance by the individual projects/stations or on a common basis based on the overall achievement of MOU targets/ profit generation, or as a combination of two, as may be considered necessary, keeping in view the broad objective of sustaining motivational levels of employees across the Company and/or to aid greater mobility of personnel within the Company across locations The performance linked incentives granted together with perquisites, if any, should be within 50% of Basic Pay or within a maximum of 5% of the distributable profits of the Company. However, the Board of Directors may change this ceilings based on needs and justifications, from time to time.
  • 3. NPCIL Performance Linked Incentive Scheme Incentive Parameters Incentive (%) Mode of payment Incentive linked to MOU ratings 20% (max.) of basic pay Monthly, Quarterly NPCIL Annual Capacity Factor (NACF) Incentive (70% - 90% Capacity Factor)- (3% - 15% Incentive) 15% (max.) of basic pay Annual (NACF) Individual Performance Related (IPR) Incentive 3% to 12% (max.) of basic pay Monthly Maximum incentive payable upto CMD level = 47%
  • 4. Promoted within Minimum Eligibility Period (MEP) 12% Promoted within MEP + 1 year 9% Promoted within MEP + 2 year 6% Promoted within MEP + 3 year 3% With regard to IPR Incentive, the incentive depends on residency period of an Executive in the current and promotion to the next grade.
  • 5. YEAR PROFIT BEFORE TAX (` in lakhs) PROFIT AFTER TAX (` in lakhs) 2008-09 48077.24 44128.40 2009-10 47405.73 41641.33 2010-11 168764.98 137632.57 2011-12 238165.06 190615.42 Financial Results:
  • 7. Governing Rules :  If an Executive after meeting prescribed norms is deferred / dropped in the Selection Interview, then two increments will be reduced from his entitlement as per the above table.  An Executive whose grading in the Performance Appraisal Report or CR is not less than `A3/Good’ will be eligible for a minimum incentive of 3% if his MEP is beyond MEP+3, irrespective of his promotion.
  • 8. PERFORMANCE LINKED INCENTIVE SCHEME IN NPCIL Introduction of Incentive Schemes in NPCIL : (a) Common Production Incentive Scheme for employees of Operating Stations; (b) Construction Incentive Scheme for employees of Construction Projects; and (c) Incentive Scheme for Headquarters employees.
  • 9. NPCIL PERFORMANCE LINKED INCENTIVE SCHEME  Objective : To enhance organizational performance through improved team work and individual contribution thereby achieving higher levels of production and productivity.  Applicability : To NPCIL Executives of Operating Stations, Construction Projects and Headquarters.  Validity : 01.01.2009 to 31.03.2015