Salone d‘ Impresa - Venezia                                                                                       18.05.2012




    The Bosch approach to Process Management


    Diesel Systems / Chassis Systems Control
1   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP Process Model:
                                                                         Management Processes
                                                                                                                                      Change
                                 Strategic Management
                                                                                                                                    Management

                                          Core Processes (Value Adding Processes)
                                 Product Engineering Process
                                  Product    (PEP)
                                Development             Production Engineering




                                                                                                                                                                      Customer
       Customer




                                                         Order Fulfillment Process
                                     Procurement                                       Production                                        Delivery



                                                                              Support Processes
           Human                                                                                       Quality              Health Safety                  IT Coordination
                                 Controlling                                    Technical                                                 Plant Protection
          Resources                                     Purchasing                                   Management                 and                             and
                                and Finance                                     Functions                                                  and Security
         Management                                                                                  and Methods            Environment                      Organisation



    Diesel Systems / Chassis Systems Control
2   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    Order Fulfillment Process:




                                                         BPS approach




    Diesel Systems / Chassis Systems Control
3   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    The Bosch Production System:


                                                                                Targets
                                                                                                                                               ” True North”
                                                                            Best In Class

                 Initial                                                                                                                             Ideal
                  State                                                      Principles
                                                              Eight general rules, that                                                              status
                                                            describe the BPS philosophy
                                                                                                                                                • 0 failure
                                                                                  Tools                                                         • One Piece Flow
                                                                Empowerment in order to                                                                • in sequence
                                                                 execute the principles                                                                • according to
                                                                                                                                                         demand
                                                                                                                                                • 100% added value



                             BPS our success for Lean Production
    Diesel Systems / Chassis Systems Control
4   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    The Bosch Production System:
         BPS Principles                                       Perfect Quality                      Process Orientation
         as Guide Line
                                                         Flexibility                          Pull System




          BPS Elements
          for                                       Value Stream                     Quick Change                    Q-                Poka           Kaizen-
          empowering                                   Design                            Over                       Tools              Yoke          Workshop

                                                                  Consumption                                                      Ship to
                                           TPM                                                  Lean Line Design                                     6S
                                                                    Control                                                         Line

                                  Point             Flow Oriented                                                Cyclical
                                                       Lay Out                       Leveling                                                  ...
                                  CIP                                                                          Material Flow




    Diesel Systems / Chassis Systems Control
5   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP BPS success story:
                                                                                                                                               From System
                                                                                        Leaders                                                CIP to
                                                                            Training    as                                                     Point CIP
                                                                            program for Mentor
                                                                                                                                               • Lean Admin
                                                                  Reinforce all leaders                                                         Review

                                                                  5S        and workers Training on                                            • Training
                                   Cyclical                                             shop floor:
                                                                                                                                                 blue collar:
                                                                                                                                                 System CIP
                                   Material                                                     Training on                    • Planners
                                                                                                                               • Quick
                                                                                                                                                 to Point
                                                                                                shop floor:                                      CIP,
                                   Flow                            • Pull-system                • Working                        Change          Leveling
           TPM                                                       stabilisation                According                      Over
                                                                                                                               • System CIP
                                                                   • Ship to Line                 to Standard
                                    • VSD Vision                                                                                 to Point
                                                                     roll-out                   • Shop-floor
                                    • CIP in al                                                                                  CIP
                                                                   • Reinforce                    Manage-
        • Integration                 direct areas
                                                                     bottom-up                    ment Cycle
          BPS-CIP                   • Cyclical
                                      Material                       processes
        • CIP on
          shop floor                  Flow
        • Linea
          Gialla


            2006                         2007                            2008                          2009                           2010          2011


    Diesel Systems / Chassis Systems Control
6   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

            Since 2006: Pull System through TPM
                                                                                                                                                       -          TPM/5S
                         Perfect Quality              Process Orientation
                                                                        Definierte                                                                         ä ne   Visualisation
                     Flexibility                 Pull System




                  Value Stream            Quick Change              Q-               Poka          Kaizen-
                     Design                   Over                 Tools             Yoke         Workshop

                            Consumption                                        Ship to
            TPM                                      Lean Line Design                             6S
                              Control                                           Line                                                                                  Gemeinsame

    Point         Flow Oriented                                  Cyclical
                     Lay Out              Leveling                                          ...                                                                       Aufr        ä
    CIP                                                        Material Flow

                                                                                                                                                                      Aktionen an


                                                                                                                                                                      Wochenenden




                       TPM


                  TPM to stabilize the OEE of all bottleneck processes
            Diesel Systems / Chassis Systems Control
7           BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
            distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP BPS success story:
                                                                                                                                               From System
                                                                                        Leaders                                                CIP to
                                                                            Training    as                                                     Point CIP
                                                                            program for Mentor
                                                                                                                                               • Lean Admin
                                                                  Reinforce all leaders                                                         Review

                                                                  5S        and workers Training on                                            • Training
                                   Cyclical                                             shop floor:
                                                                                                                                                 blue collar:
                                                                                                                                                 System CIP
                                   Material                                                     Training on                    • Planners
                                                                                                                               • Quick
                                                                                                                                                 to Point
                                                                                                shop floor:                                      CIP,
                                   Flow                            • Pull-system                • Working                        Change          Leveling
           TPM                                                       stabilisation                According                      Over
                                                                                                                               • System CIP
                                                                   • Ship to Line                 to Standard
                                    • VSD Vision                                                                                 to Point
                                                                     roll-out                   • Shop-floor
                                    • CIP in al                                                                                  CIP
                                                                   • Reinforce                    Manage-
        • Integration                 direct areas
                                                                     bottom-up                    ment Cycle
          BPS-CIP                   • Cyclical
                                      Material                       processes
        • CIP on
          shop floor                  Flow
        • Linea
          Gialla


           2006                          2007                            2008                          2009                           2010          2011


    Diesel Systems / Chassis Systems Control
8   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                           18.05.2012

             Since 2007: Flexibility through Material Flow
                                                                                                           Batch size for transport = 1600              Batch size for transport = 120
                          Perfect Quality              Process Orientation

                      Flexibility                 Pull System




                   Value Stream            Quick Change              Q-            Poka          Kaizen-
                      Design                   Over                 Tools          Yoke         Workshop

                             Consumption                                        Ship to
             TPM                                      Lean Line Design                          6S
                               Control                                           Line

     Point         Flow Oriented                                  Cyclical
                      Lay Out              Leveling                                       ...
     CIP                                                        Material Flow




              Cyclical Material
              Flow


    Frequency transportation allows continuous stock reduction
             Diesel Systems / Chassis Systems Control
9            BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
             distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


             2006                         2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
10   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

             Since 2008: Transparency through
                         5S + Safety = 6S
                          Perfect Quality              Process Orientation

                      Flexibility                 Pull System




                   Value Stream            Quick Change              Q-            Poka          Kaizen-
                      Design                   Over                 Tools          Yoke         Workshop

                             Consumption                                        Ship to
             TPM                                      Lean Line Design                          6S
                               Control                                           Line

     Point         Flow Oriented                                  Cyclical
                      Lay Out              Leveling                                       ...
     CIP                                                        Material Flow




                      6S


                                                                                                           6S as must for BPS
             Diesel Systems / Chassis Systems Control
11           BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
             distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


             2006                         2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
12   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2009: Associate Involvement - empowering
                 the entire organization
                             Training for
                              Managers
        Training Top Down




                             Shopfloor                                                        PM                                                Shopfloor




                                                                                                                                                                  Training Bottom Up
                              Management                                                   VSMgr
                                                                                                                                                  Management
                              Cycle                                                                                                               Cycle
                                                                                     Department
                             Leveling and                                            Manager                                                    Standards for
                              Pull                                                                                                                TeCo and
                                                                                     Groupleader
                                                                                                                                                  Tele
                             Training for                           Teamkoordinater, Planer,
                              Planer                                      Teamleader                                                             Standards at
                                                                                                                                                  Shopfloor for
                                                                                         Workers
                                                                                                                                                  workers

        Training, involvement and motivation as success factor
     Diesel Systems / Chassis Systems Control
13   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


            2006                          2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
14   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2009: Associate Involvement
                 Management as Mentor in daily work
                                                                                                              Targ
                                                                                                                  et
      Management Top Down:
                             - Development of the Vision




                                                                                                                                                             - Mentor - Mentee

                                                                                                                                                             - Support employees to
                                                                                                                                                                                      Management Bottom Up:
                                                                                                                                                               find solutions
                             - Release of resources
                             - Target setting




                                                                                           Management


                                                                        Associate




                                            I Know it               I do it                          I Lead it                                  I teach it
     Diesel Systems / Chassis Systems Control
15   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


            2006                          2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
16   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2010: Continous Improvement through
                 „From System CIP to Point CIP“
       4 System CIP Workshops per year

       Duration 2 days

       Participants:
                        PM (PT, PC), VSMgrs
                        Department Managers, Group Leaders, Planners
                        First line shop floor manager (Foremen)
                        External Fresh Eye

       Content of the System CIP LIVE Workshop:
                        Customer Requirements                                                                30’      Plenum
                        Business Requirements, current/target state                                          30’      VSMgrs
                        “Go to Gemba”LIVE, VSM/Bubble Diagram                                               180’      7 Workgroups
                        Development VSD/Bubble Diagram                                                      180’      7 Workgroups
                        Definition of projects including KPIs and Tree                                      120’      7 Workgroups
                        Roadmap                                                                             180’      7 Workgroups
                        Release of projects by PM (PT,PC), VSMgrs                                            90’      Plenum



          Leaders drive with Speed the Improvement Process
     Diesel Systems / Chassis Systems Control
17   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Positive experience:
           A Production System is a change of mindset:
              If you decide to do it, no doubt

                                     JUST DO IT
              The Production System isn‘t a Sprint, it is a Marathon

              Leaders: I can lead it

              Involve the whole organization




           Start consequently with 6S
              No Production System without 6S




           Deployment and Training through the entire organization




     Diesel Systems / Chassis Systems Control
18   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Support Processes:




         Lean Administration approach




     Diesel Systems / Chassis Systems Control
19   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration – VS visualization:
                                                                                                                            Flusso di informazioni
                                                                                                                             VSM = modello “swimlanes”




     Diesel Systems / Chassis Systems Control
20   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration:                                                                                                                      High
                                                                                                                                                    maturity
                                                                                                                                                    level
                                                                                                                                    CIP
                                                                                                   Redefined                        running         • Improvement
                                                                                                                                                      process
                                                                                                   approach                        • Point CIP at     managed at
                                                                        VSDiA                                                        office 100%      lowest level
                                       Process                                                      • Organization
                                                                                                    • Strategy
                                                                                                                                     installed
                                                                                                                                   • Competence
                                                                                                                                                      (employees,
                                                                                                                                                      planers)
                                       mapping                                                      • Vision                         level 4 for    • higher level
        Roll-out                                                      • Training for
                                                                        Lean
                                                                                                    • WS
                                                                                                    • Training
                                                                                                                                     managers         assures a role
                                                                                                                                                      of mentor
                                       • Training for                   referents
                                         Lean                         • Redesign
        • Lean                           experts                        of several
          Administrati                 • All the main                   key
          on starts                      processes                      processes
        • Basic                          are                            (VSD)
          training for                   mapped
          managers                       (VSM)


            2009                            2010                           2011                           2012                         2013            2014


     Diesel Systems / Chassis Systems Control
21   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2012 – Redefined approach:
           Revised strategy and long term vision
           New department fully dedicated to Lean Administration
           Structured VSDiA projects to assure :
                 Reasonable duration (4 to 8 months)

                 Adequate and stable results




             Put the basis for Lean Administration success story
     Diesel Systems / Chassis Systems Control
22   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration:                                                                                                                      High
                                                                                                                                                    maturity
                                                                                                                                                    level
                                                                                                                                    CIP
                                                                                                   Redefined                        running         • Improvement
                                                                                                                                                      process
                                                                                                   approach                        • Point CIP at     managed at
                                                                        VSDiA                                                        office 100%      lowest level
                                       Process                                                      • Organization
                                                                                                    • Strategy
                                                                                                                                     installed
                                                                                                                                   • Competence
                                                                                                                                                      (employees,
                                                                                                                                                      planers)
                                       mapping                        • Training for
                                                                                                    • Vision                         level 4 for    • higher level
                                                                                                    • WS                             managers         assures a role
         Roll-out                                                       Lean
                                                                        referents
                                                                                                    • Training                                        of mentor
                                       • Training for
                                         Lean                         • Redesign
                                         experts                        of several
        • Lean
                                       • All the main                   key
          Administrati
                                         processes                      processes
          on starts
                                         are                            (VSD)
        • Basic
          training for                   mapped
          managers                       (VSM)


            2009                            2010                           2011                           2012                         2013            2014


     Diesel Systems / Chassis Systems Control
23   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.

More Related Content

PDF
Time to-migrate-ent-legacy-app-modernisation
PDF
HVH Introduction Presentation
PDF
Tata steel sap bpm espresso session
PDF
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
PDF
ServiceNow Event 15.11.2012 / Beispiele aus Kundenprojekten von Aspediens
PDF
ServiceNow Event 15.11.2012 / Changing the face of IT
PPTX
Architecture Driven IT Modernization & Migration roadmap
PPT
Zws webinar september 2012 operational excellence series v14
Time to-migrate-ent-legacy-app-modernisation
HVH Introduction Presentation
Tata steel sap bpm espresso session
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
ServiceNow Event 15.11.2012 / Beispiele aus Kundenprojekten von Aspediens
ServiceNow Event 15.11.2012 / Changing the face of IT
Architecture Driven IT Modernization & Migration roadmap
Zws webinar september 2012 operational excellence series v14

What's hot (7)

PDF
1 maintenance-strategystrategy
PDF
Asset Lifecycle Management: A Community Worth Joining
PDF
Lean Ofis Presentation
PPTX
Managing and Solving Production Based Customer Complaints and Concerns
PDF
At Lab Company Presentationl 2007 1 Q V0.2
PDF
Improving the safety culture at VTTI by using serious gaming
PDF
EAdirections State Of Ea 6 15 2010
1 maintenance-strategystrategy
Asset Lifecycle Management: A Community Worth Joining
Lean Ofis Presentation
Managing and Solving Production Based Customer Complaints and Concerns
At Lab Company Presentationl 2007 1 Q V0.2
Improving the safety culture at VTTI by using serious gaming
EAdirections State Of Ea 6 15 2010
Ad

Viewers also liked (17)

PPT
Goal Setting Mastery
PPT
Organisation planning
PPTX
Time management & goal setting
PPTX
Ice breaker- management fun
PPT
Chapter 24
PPTX
Time management and goal setting
PDF
23.05.2015
PPT
Workers%20 participation%20in%20management%202
PPTX
Excellence in work and business
PPS
Paperless shop floor warmup ver 12
PPT
5 s training shop floor 4
PPT
PDF
Energy management & audits
PPT
Managing With A Difference Tita Jeslie
PPSX
Presentation on how to do AAC Blockwork
PPT
PARLE QUALITY SYSTEM AND HR TECHNIQUES
PPT
Effective shop floor oranization
Goal Setting Mastery
Organisation planning
Time management & goal setting
Ice breaker- management fun
Chapter 24
Time management and goal setting
23.05.2015
Workers%20 participation%20in%20management%202
Excellence in work and business
Paperless shop floor warmup ver 12
5 s training shop floor 4
Energy management & audits
Managing With A Difference Tita Jeslie
Presentation on how to do AAC Blockwork
PARLE QUALITY SYSTEM AND HR TECHNIQUES
Effective shop floor oranization
Ad

Similar to DECIMO SALONE D'IMPRESA Carmine Vox (20)

PDF
Aras Partner Solution by Minerva
PDF
Downstream Automation Provider K
PPTX
ParaVent
PDF
Aras PLM Software Integration Basics
PDF
Mainnovation Seminar 2 Juni,Versie 3b
PDF
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
PDF
New product development
PDF
New product development
PDF
New product development
PDF
New product development
PPSX
Bridging the gap between manufacturing and engineering
PDF
ABB The road to Reliability and Efficiency
PDF
PDC global capability 03 13-13
PDF
DfSS Webinar Part 1: An Introduction to DFSS
PDF
Zen and The Art of Enterprise Architecture (Open Group Conference Newport Bea...
PPTX
Web dispatching & data collection
PDF
Pdc global capability 04 02-13
PDF
New trends in manufacturing
PDF
Business Model 10 13 2010
PDF
Ifp Brochure A4 Format 3mb
Aras Partner Solution by Minerva
Downstream Automation Provider K
ParaVent
Aras PLM Software Integration Basics
Mainnovation Seminar 2 Juni,Versie 3b
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
New product development
New product development
New product development
New product development
Bridging the gap between manufacturing and engineering
ABB The road to Reliability and Efficiency
PDC global capability 03 13-13
DfSS Webinar Part 1: An Introduction to DFSS
Zen and The Art of Enterprise Architecture (Open Group Conference Newport Bea...
Web dispatching & data collection
Pdc global capability 04 02-13
New trends in manufacturing
Business Model 10 13 2010
Ifp Brochure A4 Format 3mb

More from Roberto Terzi (20)

PPTX
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
PPTX
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
PPT
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
PPTX
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
PPTX
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
PPT
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
PPT
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
PPTX
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
PPTX
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...
PPTX
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...
PPTX
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
PPT
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
PPT
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
PDF
DECIMO SALONE D'IMPRESA Enrico Peruffo
PDF
DECIMO SALONE D'IMPRESA Panozzo
PDF
6. ratto
PDF
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
PDF
DECIMO SALONE D'IMPRESA Paolo Buratto
PDF
DECIMO SALONE D'IMPRESA Italo Benedini
PDF
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
DECIMO SALONE D'IMPRESA Enrico Peruffo
DECIMO SALONE D'IMPRESA Panozzo
6. ratto
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
DECIMO SALONE D'IMPRESA Paolo Buratto
DECIMO SALONE D'IMPRESA Italo Benedini
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio

Recently uploaded (20)

PDF
QT INTRODUCTION chapters that help to study
PPTX
IMM.pptx marketing communication givguhfh thfyu
PDF
Handouts for Housekeeping.pdfbababvsvvNnnh
PDF
Comments on Clouds that Assimilate Parts I&II.pdf
PPTX
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
PPTX
Accounting Management SystemBatch-4.pptx
PDF
Sustainable Digital Finance in Asia_FINAL_22.pdf
PPTX
Leadership and leader jobs and ch - 2.pptx
PDF
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
PPT
BCG内部幻灯片撰写. slide template BCG.slide template
PPTX
Chapter 2 strategic Presentation (6).pptx
PDF
the role of manager in strategic alliances
PPTX
003 seven PARTS OF SPEECH english subject.pptx
PDF
Investment in CUBA. Basic information for United States businessmen (1957)
PDF
dataZense for Data Analytics unleashed features
PDF
Chembond Chemicals Limited Presentation 2025
PPTX
Side hustles: 14 powerful tips to embrace the future of work
PDF
Value-based IP Management at Siemens: A Cross-Divisional Analysis
DOCX
Center Enamel Can Provide Pressure Vessels for Maldives Chemical Industry.docx
PDF
Challenges of Managing International Schools (www.kiu. ac.ug)
QT INTRODUCTION chapters that help to study
IMM.pptx marketing communication givguhfh thfyu
Handouts for Housekeeping.pdfbababvsvvNnnh
Comments on Clouds that Assimilate Parts I&II.pdf
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
Accounting Management SystemBatch-4.pptx
Sustainable Digital Finance in Asia_FINAL_22.pdf
Leadership and leader jobs and ch - 2.pptx
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
BCG内部幻灯片撰写. slide template BCG.slide template
Chapter 2 strategic Presentation (6).pptx
the role of manager in strategic alliances
003 seven PARTS OF SPEECH english subject.pptx
Investment in CUBA. Basic information for United States businessmen (1957)
dataZense for Data Analytics unleashed features
Chembond Chemicals Limited Presentation 2025
Side hustles: 14 powerful tips to embrace the future of work
Value-based IP Management at Siemens: A Cross-Divisional Analysis
Center Enamel Can Provide Pressure Vessels for Maldives Chemical Industry.docx
Challenges of Managing International Schools (www.kiu. ac.ug)

DECIMO SALONE D'IMPRESA Carmine Vox

  • 1. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch approach to Process Management Diesel Systems / Chassis Systems Control 1 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 2. Salone d‘ Impresa - Venezia 18.05.2012 BarP Process Model: Management Processes Change Strategic Management Management Core Processes (Value Adding Processes) Product Engineering Process Product (PEP) Development Production Engineering Customer Customer Order Fulfillment Process Procurement Production Delivery Support Processes Human Quality Health Safety IT Coordination Controlling Technical Plant Protection Resources Purchasing Management and and and Finance Functions and Security Management and Methods Environment Organisation Diesel Systems / Chassis Systems Control 2 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 3. Salone d‘ Impresa - Venezia 18.05.2012 Order Fulfillment Process: BPS approach Diesel Systems / Chassis Systems Control 3 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 4. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch Production System: Targets ” True North” Best In Class Initial Ideal State Principles Eight general rules, that status describe the BPS philosophy • 0 failure Tools • One Piece Flow Empowerment in order to • in sequence execute the principles • according to demand • 100% added value BPS our success for Lean Production Diesel Systems / Chassis Systems Control 4 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 5. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch Production System: BPS Principles Perfect Quality Process Orientation as Guide Line Flexibility Pull System BPS Elements for Value Stream Quick Change Q- Poka Kaizen- empowering Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow Diesel Systems / Chassis Systems Control 5 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 6. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 6 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 7. Salone d‘ Impresa - Venezia 18.05.2012 Since 2006: Pull System through TPM - TPM/5S Perfect Quality Process Orientation Definierte ä ne Visualisation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Gemeinsame Point Flow Oriented Cyclical Lay Out Leveling ... Aufr ä CIP Material Flow Aktionen an Wochenenden TPM TPM to stabilize the OEE of all bottleneck processes Diesel Systems / Chassis Systems Control 7 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 8. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 8 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 9. Salone d‘ Impresa - Venezia 18.05.2012 Since 2007: Flexibility through Material Flow Batch size for transport = 1600 Batch size for transport = 120 Perfect Quality Process Orientation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow Cyclical Material Flow Frequency transportation allows continuous stock reduction Diesel Systems / Chassis Systems Control 9 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 10. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 10 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 11. Salone d‘ Impresa - Venezia 18.05.2012 Since 2008: Transparency through 5S + Safety = 6S Perfect Quality Process Orientation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow 6S 6S as must for BPS Diesel Systems / Chassis Systems Control 11 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 12. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 12 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 13. Salone d‘ Impresa - Venezia 18.05.2012 Since 2009: Associate Involvement - empowering the entire organization  Training for Managers Training Top Down  Shopfloor PM  Shopfloor Training Bottom Up Management VSMgr Management Cycle Cycle Department  Leveling and Manager  Standards for Pull TeCo and Groupleader Tele  Training for Teamkoordinater, Planer, Planer Teamleader  Standards at Shopfloor for Workers workers Training, involvement and motivation as success factor Diesel Systems / Chassis Systems Control 13 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 14. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 14 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 15. Salone d‘ Impresa - Venezia 18.05.2012 Since 2009: Associate Involvement Management as Mentor in daily work Targ et Management Top Down: - Development of the Vision - Mentor - Mentee - Support employees to Management Bottom Up: find solutions - Release of resources - Target setting Management Associate I Know it I do it I Lead it I teach it Diesel Systems / Chassis Systems Control 15 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 16. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 16 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 17. Salone d‘ Impresa - Venezia 18.05.2012 Since 2010: Continous Improvement through „From System CIP to Point CIP“  4 System CIP Workshops per year  Duration 2 days  Participants:  PM (PT, PC), VSMgrs  Department Managers, Group Leaders, Planners  First line shop floor manager (Foremen)  External Fresh Eye  Content of the System CIP LIVE Workshop:  Customer Requirements 30’ Plenum  Business Requirements, current/target state 30’ VSMgrs  “Go to Gemba”LIVE, VSM/Bubble Diagram 180’ 7 Workgroups  Development VSD/Bubble Diagram 180’ 7 Workgroups  Definition of projects including KPIs and Tree 120’ 7 Workgroups  Roadmap 180’ 7 Workgroups  Release of projects by PM (PT,PC), VSMgrs 90’ Plenum Leaders drive with Speed the Improvement Process Diesel Systems / Chassis Systems Control 17 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 18. Salone d‘ Impresa - Venezia 18.05.2012 Positive experience:  A Production System is a change of mindset:  If you decide to do it, no doubt  JUST DO IT  The Production System isn‘t a Sprint, it is a Marathon  Leaders: I can lead it  Involve the whole organization  Start consequently with 6S  No Production System without 6S  Deployment and Training through the entire organization Diesel Systems / Chassis Systems Control 18 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 19. Salone d‘ Impresa - Venezia 18.05.2012 Support Processes: Lean Administration approach Diesel Systems / Chassis Systems Control 19 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 20. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration – VS visualization:  Flusso di informazioni VSM = modello “swimlanes” Diesel Systems / Chassis Systems Control 20 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 21. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration: High maturity level CIP Redefined running • Improvement process approach • Point CIP at managed at VSDiA office 100% lowest level Process • Organization • Strategy installed • Competence (employees, planers) mapping • Vision level 4 for • higher level Roll-out • Training for Lean • WS • Training managers assures a role of mentor • Training for referents Lean • Redesign • Lean experts of several Administrati • All the main key on starts processes processes • Basic are (VSD) training for mapped managers (VSM) 2009 2010 2011 2012 2013 2014 Diesel Systems / Chassis Systems Control 21 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 22. Salone d‘ Impresa - Venezia 18.05.2012 Since 2012 – Redefined approach:  Revised strategy and long term vision  New department fully dedicated to Lean Administration  Structured VSDiA projects to assure :  Reasonable duration (4 to 8 months)  Adequate and stable results Put the basis for Lean Administration success story Diesel Systems / Chassis Systems Control 22 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 23. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration: High maturity level CIP Redefined running • Improvement process approach • Point CIP at managed at VSDiA office 100% lowest level Process • Organization • Strategy installed • Competence (employees, planers) mapping • Training for • Vision level 4 for • higher level • WS managers assures a role Roll-out Lean referents • Training of mentor • Training for Lean • Redesign experts of several • Lean • All the main key Administrati processes processes on starts are (VSD) • Basic training for mapped managers (VSM) 2009 2010 2011 2012 2013 2014 Diesel Systems / Chassis Systems Control 23 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.