Chapter 2
Team Roles & Responsibilities

2-1
2-1

What You Will See in This Module
I.

Team Roles

II.

Responsibilities for Successful Improvement
A.
B.
C.

Before the Project
During the Project
After the Project

III. Leadership Team Reviews
2-2

Team Roles
• Team Members carry out the team’s work, sharing their
knowledge and experience, listening to others, and completing
assignments. Effective Team Members
•
•
•
•
•
•
•
•

Contribute fully to the project
Share their knowledge and experience
Participate in meetings and discussions
Listen to others and stay open to ideas
Assist the Team Leader with managing meetings, documentation,
discussions, etc.
Carry out assignments between meetings
Communicate effectively with colleagues
Recognize they may be implementing changes themselves
Team Roles, cont.
• The Team Leader orchestrates team activities, maintains
records, and serves as a communication link with the rest of
the organization. An effective Team Leader
•
•
•
•
•
•
•
•
•

Focuses on following a data-based method to solve the problem
Serves as the contact point for communication
Develops ways of updating others who might be affected by the team’s
work
Meets with the Sponsor between scheduled meetings
Keeps official team records
Participates selectively and carefully in discussions
Participates in carrying out the work between meetings
Retains authority as a manager or supervisor —the leader can
immediately implement changes
Helps the team resolve its problems

2-3
To
2-4
Team Roles, cont.
• The Coach understands the tools and concepts of
improvement, including approaches that help a team have
effective, productive meetings. An effective Coach
•
•
•
•
•
•
•
•
•
•
•
•

Attends meetings, but is neither a leader nor a member
Focuses more on the team’s process than its product
Assists the Team Leader in developing individual assignments
Works with the Team Leader to plan for upcoming meetings
Helps the Team Leader review plans
Teaches data collection and analysis techniques
Helps the team graphically present data
Guides the team’s efforts when technical expertise is required
Encourages the team to seek the causes of the problem before
generating solutions
Works with Team Members to develop data collection forms
Helps the Team Leader handle group dynamics
Helps the team prepare and rehearse management presentations

2-4
To
2-5
Team Roles, cont.
• The Sponsor selects a problem or process for improvement,
and reviews and supports team efforts. An effective Sponsor
•
•
•
•
•
•
•
•
•

Maintains overall responsibility, authority, and accountability for the
effort
Selects and defines the project
Determines the resources
Selects the Coach, Team Leader, and Team Members
Provides context, guidance, direction, and support
Reviews progress and “runs interference”
Ensures stakeholders have appropriate involvement
Ensures changes are implemented and monitored
Feeds data and lessons learned into a system for further improvements

2-6
To
2-7
2-9

Roles and Responsibilities
Roles and Responsibilities for Improvement Projects
Before the Project
Sponsor responsibilities before the project:
• Select and define the project
• Draft a clear charter
• Select the Coach
• Select the Team Leader
• Select the Team Members
• Provide the resources

2-10
To
2-16
2-10

Selecting a Process to Improve
Select a process that
• Is important to the organization and its customers
• Is not undergoing major changes
• Is relatively simple and defined
• Completes a cycle once a day or so
2-10

Common Errors in Selecting Projects
• Selecting a process beyond your authority or control
• Selecting a project no one is interested in
• Selecting a solution to implement rather than a problem to
investigate
• Selecting a process in transition
• Selecting a system, not a process
2-16

Before the Project
Coach responsibilities before the project:
• Work with Team Leader to identify team’s initial training
• Work with Sponsor and Team Leader to pick Team Members
• Help Sponsor and Team Leader complete first draft of the
charter
• Help Team Leader draft the initial project plan
Team Leader responsibilities before the project:
• Review charter with Sponsor to understand the scope of the
problem
• Draft remaining elements of charter for Sponsor review
• Meet with Coach to clarify roles and responsibilities
• Review charter with Coach and draft project plan
During the Project
Sponsor responsibilities during the project:
• Orient the team
• Represent team interests to the organization
• Review team progress
Coach responsibilities during the project:
• Meet with Team Leader to discuss team’s progress
• Teach tools/skills to team during meetings
• Get team “unstuck” during meetings
• Meet with Sponsor, Team Leader, and Team Members for
joint team meetings

2-17
To
2-18
2-18

During the Project, cont.
Team Leader responsibilities during the project:
• Lead improvement project
• Provide Team Members with improvement tools and methods
• Develop, update, and execute the project plan
• Identify problems and risks
• Plan team meetings
• Lead meetings until Team Members are comfortable enough to
take turns
• Handle meeting logistics
• Regularly meet with Sponsor and Coach to review progress
• Meet with Sponsor, Coach, Team Members for joint reviews
• Make recommendations for changes when necessary
During the Project, cont.
Team Member responsibilities during the project:
• Participate in team meetings
• Help with administrative tasks
• Complete assignments between meetings
• Communicate progress to colleagues
• Make recommendations for changes
• Meet with Sponsor, Coach, Team Leader for joint reviews

2-19
To
2-20
2-21

Balancing Roles
Continuum of Leadership Shared Between Team Leader and Coach
Amount of Active Leadership by Coach
Start of the
project
After a few
meetings
End of the
project
Amount of Active Leadership by Team Leader
Joint Review Meetings
Joint review meetings between Sponsor, Coach, Team Leader,
and Team Members are held
• To stay updated on progress
• At the end of each step
• Whenever unexpected
problems arise
• When major revisions
occur
• When solutions are
selected

2-22
To
2-23
2-24

Structure of Review Meeting
Before the review:
• Team Members agree on what to present
• Team Leader and Sponsor agree on agenda
• Team Members prepare and send out handouts
• Sponsor and Coach read materials, looking to understand logic
and supporting data
2-24

Structure of Review Meeting, cont.
Part one of the review:
• Sponsor opens meeting and
reviews agenda
• Team presents highlights of work
• Sponsor asks questions and
offers suggestions
• Team asks questions and responds
• Sponsor closes part one and
reviews next steps
2-25

Structure of Review Meeting, cont.
Part two of the review:
• Sponsor and Coach meet and discuss
•
•
•

Main messages sent to the team
Ways to improve what was said
Ways to improve the review itself

• Team Leader and Team Members meet and discuss
•
•
•

Main message heard by the team
How to address the main points
Ways to improve the review itself
2-25

Structure of Review Meeting, cont.
Part three of the review:
• Sponsor, Coach, and Team Members reconvene to discuss
•
•
•
•

Main messages sent and received
Any modifications to those messages
The team’s plans for next steps
How to improve the next review
2-27

After the Project
Sponsor responsibilities after the project:
• Celebrate project’s conclusion
• Communicate team’s results
• Monitor changes
• Review information collected during the project
Team Leader responsibilities after the project:
• Ensure project documentation complete
• See that process owner receives documentation
• Identify, document, and communicate lessons learned
2-28

After the Project, cont.
The Process Owner is the manager or supervisor who has
ongoing responsibility to
• Monitor the processes and key measures in his or her area of
responsibility
• Maintain control of key elements
• Maintain the project’s gains
Leadership Team Reviews

2-30
To
2-31

The Leadership Team meets periodically to
• Continually assess project mix against organizational priorities
• Check for synergies across projects
• Manage the “pipeline” of projects
• Reinforce consistent message about importance of projects
• Gather lessons learned
Summary
• Teams require people with specific roles and responsibilites.
• Sponsors identify and review projects and support the team.
• Coaches teach teams how to use specific tools and skills.
• Team Leaders orchestrate team acitivities.
• Team Members share knowledge, experience, and expertise to
while completing the project.
• Joint review meetings are held throughout the life of the
project.
• The Leadership Team periodically reviews all project so the
organization can improve how it improves.

More Related Content

PPT
General Safety Presentation
PPTX
Event management
PPTX
GitHub Copilot.pptx
PPT
Teamwork Presentation
PPT
Organizational change & development
DOC
Team Facilitation
PPTX
Managing virtual teams
PPS
Network ppt
General Safety Presentation
Event management
GitHub Copilot.pptx
Teamwork Presentation
Organizational change & development
Team Facilitation
Managing virtual teams
Network ppt

What's hot (20)

PPT
Fundamentals of Project Management
PPTX
Project monitoring
PPT
Coaching & Mentoring
PPTX
Project Management 101
PPTX
Coaching & mentoring
PPTX
project management
PDF
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
PPTX
ppt on Recruitment & Selection Process
PPTX
RECRUITMENT AND SELECTION
PPT
Presentation on Organization
PDF
Developing asset management plans
PPTX
Project Scheduling
PPTX
Organizational Structure and Design
PPT
Project Planning Scheduling
PPTX
Effective project management skills
PPT
Scheduling-Resources-and-Costs.ppt
PPTX
Performace evaluation
PPTX
Induction and Orientation
PPTX
OFFICE ORGANIZATION LECTURE THREE
Fundamentals of Project Management
Project monitoring
Coaching & Mentoring
Project Management 101
Coaching & mentoring
project management
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
ppt on Recruitment & Selection Process
RECRUITMENT AND SELECTION
Presentation on Organization
Developing asset management plans
Project Scheduling
Organizational Structure and Design
Project Planning Scheduling
Effective project management skills
Scheduling-Resources-and-Costs.ppt
Performace evaluation
Induction and Orientation
OFFICE ORGANIZATION LECTURE THREE
Ad

Viewers also liked (20)

PPTX
Team role
PDF
Roles And Responsibilities
DOC
Roles and-responsibilities-project manager
PPTX
Team work presentation
PPTX
Team Leadership
PPTX
Tips to effective public speaking
PPT
Project life cycle
PDF
Conducting Group Meetings
PPTX
Leaders
PPT
Taking oaths
PDF
4 roles on the it project team
PDF
Student Government Constitution and by laws
PDF
Jason Mesut: Wicked Workshops
PPTX
Time Management Workshop
PDF
Time Management Workshop
PDF
Master the Moment - a three hour workshop on time management
PPT
Gender & sexuality
PPTX
Time management workshop by Dr Manishankar Chakraborty for the ETC staff of I...
PPTX
Decisionmaking
Team role
Roles And Responsibilities
Roles and-responsibilities-project manager
Team work presentation
Team Leadership
Tips to effective public speaking
Project life cycle
Conducting Group Meetings
Leaders
Taking oaths
4 roles on the it project team
Student Government Constitution and by laws
Jason Mesut: Wicked Workshops
Time Management Workshop
Time Management Workshop
Master the Moment - a three hour workshop on time management
Gender & sexuality
Time management workshop by Dr Manishankar Chakraborty for the ETC staff of I...
Decisionmaking
Ad

Similar to Chapter 2 - Team Roles & Responsibilities (20)

PPTX
CISA Training - Chapter 3 - 2016
PPTX
PMP Exam Prep 2021 free sample module 1
PPTX
SPM Unit 1.pptx
PDF
Pmi kenya starting a pmo
PDF
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PPTX
Week 2 - Session 2-hello world ples.pptx
DOCX
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docx
PDF
Project Management Tools & Techniques by Susan W. Carey
PPTX
Atppmp1ov1
PDF
Performance Improvement Final Presentation - ODH project
PDF
Lesson 1 - Introduction to Project Management .pdf
PPTX
Board Evaluation
PDF
PRESENTATION ON BASICS OF HUMAN RESOURCE MGT.pdf
PDF
Ch09 human resources management v1.2
PPTX
Chapter 2 Project Organization and life cycle.pptx
PPTX
Integrated Project Management
PPTX
P&C_INTEL LeadershipTraining_implementation plan_workteam.pptx
PPTX
Team and project
PPTX
Organization Chart & Project Responsibilities
PPTX
Organization Chart Roles & Responsibilities Matrix
CISA Training - Chapter 3 - 2016
PMP Exam Prep 2021 free sample module 1
SPM Unit 1.pptx
Pmi kenya starting a pmo
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
Week 2 - Session 2-hello world ples.pptx
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docx
Project Management Tools & Techniques by Susan W. Carey
Atppmp1ov1
Performance Improvement Final Presentation - ODH project
Lesson 1 - Introduction to Project Management .pdf
Board Evaluation
PRESENTATION ON BASICS OF HUMAN RESOURCE MGT.pdf
Ch09 human resources management v1.2
Chapter 2 Project Organization and life cycle.pptx
Integrated Project Management
P&C_INTEL LeadershipTraining_implementation plan_workteam.pptx
Team and project
Organization Chart & Project Responsibilities
Organization Chart Roles & Responsibilities Matrix

Recently uploaded (20)

PDF
the role of manager in strategic alliances
PDF
The Impact of Historical Events on Legal Communication Styles (www.kiu.ac.ug)
PDF
The Relationship between Leadership Behaviourand Firm Performance in the Read...
DOCX
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
PPTX
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
PPTX
Warehouse. B pptx
PDF
Implementing Steam Education: Challenges and Solutions (www.kiu.ac.ug)
PDF
The Impact of Immigration on National Identity (www.kiu.ac.ug)
PDF
Integrating Porter-Lawler Theory of Motivation and Hofstede's Dimensions of N...
PPTX
Business Research Methods- Secondary Data
PPTX
Hospitality & tourism management.pptxHospitality & tourism management.pptx
PPTX
PwC consulting Powerpoint Graphics 2014 templates
PDF
The Impact of Policy Changes on Legal Communication Strategies (www.kiu.ac.ug)
PPTX
PPT Hafizullah Oria- Final Thesis Exam.pptx
PDF
El futuro en e sector empresarial 2024 e
PDF
The Role of School Boards in Educational Management (www.kiu.ac.ug)
PDF
Unit 2 Electronic-Commerce Business Models.pptx
PDF
Unit-1 Introduction to Electronic-Commerce.pptx
PDF
Chembond Chemicals Limited Presentation 2025
PPTX
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx
the role of manager in strategic alliances
The Impact of Historical Events on Legal Communication Styles (www.kiu.ac.ug)
The Relationship between Leadership Behaviourand Firm Performance in the Read...
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
Warehouse. B pptx
Implementing Steam Education: Challenges and Solutions (www.kiu.ac.ug)
The Impact of Immigration on National Identity (www.kiu.ac.ug)
Integrating Porter-Lawler Theory of Motivation and Hofstede's Dimensions of N...
Business Research Methods- Secondary Data
Hospitality & tourism management.pptxHospitality & tourism management.pptx
PwC consulting Powerpoint Graphics 2014 templates
The Impact of Policy Changes on Legal Communication Strategies (www.kiu.ac.ug)
PPT Hafizullah Oria- Final Thesis Exam.pptx
El futuro en e sector empresarial 2024 e
The Role of School Boards in Educational Management (www.kiu.ac.ug)
Unit 2 Electronic-Commerce Business Models.pptx
Unit-1 Introduction to Electronic-Commerce.pptx
Chembond Chemicals Limited Presentation 2025
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx

Chapter 2 - Team Roles & Responsibilities

  • 1. Chapter 2 Team Roles & Responsibilities 2-1
  • 2. 2-1 What You Will See in This Module I. Team Roles II. Responsibilities for Successful Improvement A. B. C. Before the Project During the Project After the Project III. Leadership Team Reviews
  • 3. 2-2 Team Roles • Team Members carry out the team’s work, sharing their knowledge and experience, listening to others, and completing assignments. Effective Team Members • • • • • • • • Contribute fully to the project Share their knowledge and experience Participate in meetings and discussions Listen to others and stay open to ideas Assist the Team Leader with managing meetings, documentation, discussions, etc. Carry out assignments between meetings Communicate effectively with colleagues Recognize they may be implementing changes themselves
  • 4. Team Roles, cont. • The Team Leader orchestrates team activities, maintains records, and serves as a communication link with the rest of the organization. An effective Team Leader • • • • • • • • • Focuses on following a data-based method to solve the problem Serves as the contact point for communication Develops ways of updating others who might be affected by the team’s work Meets with the Sponsor between scheduled meetings Keeps official team records Participates selectively and carefully in discussions Participates in carrying out the work between meetings Retains authority as a manager or supervisor —the leader can immediately implement changes Helps the team resolve its problems 2-3 To 2-4
  • 5. Team Roles, cont. • The Coach understands the tools and concepts of improvement, including approaches that help a team have effective, productive meetings. An effective Coach • • • • • • • • • • • • Attends meetings, but is neither a leader nor a member Focuses more on the team’s process than its product Assists the Team Leader in developing individual assignments Works with the Team Leader to plan for upcoming meetings Helps the Team Leader review plans Teaches data collection and analysis techniques Helps the team graphically present data Guides the team’s efforts when technical expertise is required Encourages the team to seek the causes of the problem before generating solutions Works with Team Members to develop data collection forms Helps the Team Leader handle group dynamics Helps the team prepare and rehearse management presentations 2-4 To 2-5
  • 6. Team Roles, cont. • The Sponsor selects a problem or process for improvement, and reviews and supports team efforts. An effective Sponsor • • • • • • • • • Maintains overall responsibility, authority, and accountability for the effort Selects and defines the project Determines the resources Selects the Coach, Team Leader, and Team Members Provides context, guidance, direction, and support Reviews progress and “runs interference” Ensures stakeholders have appropriate involvement Ensures changes are implemented and monitored Feeds data and lessons learned into a system for further improvements 2-6 To 2-7
  • 7. 2-9 Roles and Responsibilities Roles and Responsibilities for Improvement Projects
  • 8. Before the Project Sponsor responsibilities before the project: • Select and define the project • Draft a clear charter • Select the Coach • Select the Team Leader • Select the Team Members • Provide the resources 2-10 To 2-16
  • 9. 2-10 Selecting a Process to Improve Select a process that • Is important to the organization and its customers • Is not undergoing major changes • Is relatively simple and defined • Completes a cycle once a day or so
  • 10. 2-10 Common Errors in Selecting Projects • Selecting a process beyond your authority or control • Selecting a project no one is interested in • Selecting a solution to implement rather than a problem to investigate • Selecting a process in transition • Selecting a system, not a process
  • 11. 2-16 Before the Project Coach responsibilities before the project: • Work with Team Leader to identify team’s initial training • Work with Sponsor and Team Leader to pick Team Members • Help Sponsor and Team Leader complete first draft of the charter • Help Team Leader draft the initial project plan Team Leader responsibilities before the project: • Review charter with Sponsor to understand the scope of the problem • Draft remaining elements of charter for Sponsor review • Meet with Coach to clarify roles and responsibilities • Review charter with Coach and draft project plan
  • 12. During the Project Sponsor responsibilities during the project: • Orient the team • Represent team interests to the organization • Review team progress Coach responsibilities during the project: • Meet with Team Leader to discuss team’s progress • Teach tools/skills to team during meetings • Get team “unstuck” during meetings • Meet with Sponsor, Team Leader, and Team Members for joint team meetings 2-17 To 2-18
  • 13. 2-18 During the Project, cont. Team Leader responsibilities during the project: • Lead improvement project • Provide Team Members with improvement tools and methods • Develop, update, and execute the project plan • Identify problems and risks • Plan team meetings • Lead meetings until Team Members are comfortable enough to take turns • Handle meeting logistics • Regularly meet with Sponsor and Coach to review progress • Meet with Sponsor, Coach, Team Members for joint reviews • Make recommendations for changes when necessary
  • 14. During the Project, cont. Team Member responsibilities during the project: • Participate in team meetings • Help with administrative tasks • Complete assignments between meetings • Communicate progress to colleagues • Make recommendations for changes • Meet with Sponsor, Coach, Team Leader for joint reviews 2-19 To 2-20
  • 15. 2-21 Balancing Roles Continuum of Leadership Shared Between Team Leader and Coach Amount of Active Leadership by Coach Start of the project After a few meetings End of the project Amount of Active Leadership by Team Leader
  • 16. Joint Review Meetings Joint review meetings between Sponsor, Coach, Team Leader, and Team Members are held • To stay updated on progress • At the end of each step • Whenever unexpected problems arise • When major revisions occur • When solutions are selected 2-22 To 2-23
  • 17. 2-24 Structure of Review Meeting Before the review: • Team Members agree on what to present • Team Leader and Sponsor agree on agenda • Team Members prepare and send out handouts • Sponsor and Coach read materials, looking to understand logic and supporting data
  • 18. 2-24 Structure of Review Meeting, cont. Part one of the review: • Sponsor opens meeting and reviews agenda • Team presents highlights of work • Sponsor asks questions and offers suggestions • Team asks questions and responds • Sponsor closes part one and reviews next steps
  • 19. 2-25 Structure of Review Meeting, cont. Part two of the review: • Sponsor and Coach meet and discuss • • • Main messages sent to the team Ways to improve what was said Ways to improve the review itself • Team Leader and Team Members meet and discuss • • • Main message heard by the team How to address the main points Ways to improve the review itself
  • 20. 2-25 Structure of Review Meeting, cont. Part three of the review: • Sponsor, Coach, and Team Members reconvene to discuss • • • • Main messages sent and received Any modifications to those messages The team’s plans for next steps How to improve the next review
  • 21. 2-27 After the Project Sponsor responsibilities after the project: • Celebrate project’s conclusion • Communicate team’s results • Monitor changes • Review information collected during the project Team Leader responsibilities after the project: • Ensure project documentation complete • See that process owner receives documentation • Identify, document, and communicate lessons learned
  • 22. 2-28 After the Project, cont. The Process Owner is the manager or supervisor who has ongoing responsibility to • Monitor the processes and key measures in his or her area of responsibility • Maintain control of key elements • Maintain the project’s gains
  • 23. Leadership Team Reviews 2-30 To 2-31 The Leadership Team meets periodically to • Continually assess project mix against organizational priorities • Check for synergies across projects • Manage the “pipeline” of projects • Reinforce consistent message about importance of projects • Gather lessons learned
  • 24. Summary • Teams require people with specific roles and responsibilites. • Sponsors identify and review projects and support the team. • Coaches teach teams how to use specific tools and skills. • Team Leaders orchestrate team acitivities. • Team Members share knowledge, experience, and expertise to while completing the project. • Joint review meetings are held throughout the life of the project. • The Leadership Team periodically reviews all project so the organization can improve how it improves.