This document provides instructions for performing a heavy-duty gas turbine combustion inspection. It lists the typical combustion hardware that needs to be inspected, including combustion liners, endcovers, fuel nozzles, transition pieces, cross fire tubes, and flow sleeves. Standard inspection intervals are every 8,000 hours or 900 starts. The inspection involves removing, inspecting, and repairing combustion components. Replacement parts should be available for installation after the inspection is complete. A series of 18 operations is outlined to remove the various combustion and fuel system components to allow for inspection.