Web-Based Schedule Management Comparison




                                           April 2010
Web-Based Schedule Management Comparison                                                                                                    Feature Key:
                                                                                                                                            Limited or         Available
Project 2010 offers flexibility and choice by providing tailored work management solutions for individuals, teams and the enterprise.
                                                                                                                                            Read-only
The table below compares only the new web-based schedule management capabilities in Project Web App (PWA) 2010* compared to
Project Professional 2010**.
Learn more about the Project 2010 family of products and solutions at www.microsoft.com/project.


Schedule Management                                                                                                                Project Web App
                                                                                                                                   (PWA) 2010            Project Professional 2010

    Multi-Resource Assignments
    Able to assign more than one resource to a particular task.

    Status Change Updates
    Receive updates on status changes that reschedule the project plan.

    Keyboard Shortcuts
    Use keyboard shortcuts for common operations such as indent/insert.

    Task Hierarchy
    Full support for displaying and rendering of tasks with hierarchical information.

    Indent/Outdent
    Apply full indenting/outdenting of tasks in a project plan.

    Change Highlighting
    Easily view project changes and all parts of the schedule affected by the change (successor tasks, summary costs, etc.)
    with change highlighting.

    Multi-Level Undo
    Perform what-if analysis and fully understand the impact of changes by reversing and reapplying an entire set of operations,
    including views, data and option changes.

    Cut/Copy/Paste
    Collaborate on schedule development by copying/pasting schedule details between applications.

    Flexible Views
    Move columns to define a specific view.

    High Fidelity Gantt Charts
    Create vivid, colorful Gantt charts; customizable Gantt chart styles.

    Grouping
    Ability to apply multiple grouping rows to a project plan.

2                                                                                                                                       © Microsoft Corp. All rights reserved
Schedule Management                                                                                                                          Project Web App
                                                                                                                                             (PWA) 2010         Project Professional 2010

    Sorting
    Ability for end user to sort project plan data.

    Filtering
    Ability to filter project plans by any data value in the plan.

    Automatically Scheduled Tasks
    Indicate tasks (mode) to be scheduled automatically using the Project scheduling engine.

    Manually Scheduled Tasks
    Indicate tasks (mode) to be scheduled manually.

    Linking
    Create, edit and delete task dependency relationships.

    Zoom In/ Zoom Out
    Use zoom controls on the status bar to quickly change the timeline perspective of your project schedules.

    Scroll to Task
    Select a task and then move the task into view on the Gantt chart.

    View and Edit Custom Fields
    Users can view and edit project metadata using custom fields.

    Project Information
    Edit project-level fields and properties.

    Edit Large Projects
    No limit to the size of plans that are editable. (Note: Larger projects may have performance implications but no limits are built in.)

    Import from SharePoint
    Import data from a SharePoint project task list into a project plan.

    SharePoint 2010 Project Task Lists
    Ability to accept SharePoint 2010 project task list status updates. (Note: Only using Project Professional 2010 are project task list
    status updates synchronized/bi-directional with SharePoint 2010 once the plan is published.)

    Connect to Project Server 2010
    Ability to connect to Project Server 2010.

    Microsoft® Office Fluent™ User Interface
    Increase productivity with the Ribbon, a tab interface to quickly find and use Project features and controls.


3                                                                                                                                                 © Microsoft Corp. All rights reserved
Schedule Management                                                                                                                        Project Web App
                                                                                                                                           (PWA) 2010         Project Professional 2010

    Real-Time Validation
    Mark cell data as invalid as you edit, instead of after saving or validating.

    Error Handling
    Handle invalid data and present data in an easy-to-use interface that helps resolve issues.

    Fill Down
    Drag bottom right corner of a cell to repeat data in the cells below.

    % Complete
    Mark task progress as a percentage of the assigned work that is complete.

    Cost and Material Resource Assignments
    Ability to assign Cost Resources or Material Resources to tasks (NOTE: assignments cannot be made in the web but previous
    assignments from Project Professional 2010 are available as Read-Only.)

    Inactive Tasks
    Mark a task as inactive. (Note: In PWA, tasks marked as inactive in Project Professional 2010 are Read-Only.)

    Edit Master Projects
    Edit master projects. (Note: In PWA, master projects are Read-Only.)

    Cross Project Links
    Create, edit, and delete a dependency relationship with a task in another project. (Note: In PWA, editing cross-project links is not
    supported; cross-project links created in Project Professional 2010 are Read-Only.)

    Summary Task Assignment
    Create a resource assignment on a summary task. (Note: In PWA, creating summary task assignments is not supported. Summary
    task assignments created in Project Professional 2010 are available in PWA as Read-Only.)

    Task Calendars
    Define a custom calendar associated with a task. (Note: In PWA, task calendars cannot be used, and project plans created in Project
    Professional 2010 that contain task calendars are available as Read-Only.)

    Fixed Work Tasks
    Define the type of a task as fixed work. (Note: In PWA, tasks cannot be created as fixed work and project plans created in Project
    Professional 2010 that contain fixed work tasks are available in PWA as Read-Only.)

    Edit Sub-Projects
    Ability to edit sub-projects within a master project. (Note: In PWA, sub-projects cannot be added to a project, and master projects
    are Read-Only. Sub-projects can be edited separately from a master project.)




4                                                                                                                                               © Microsoft Corp. All rights reserved
Schedule Management                                                                                                                  Project Web App
                                                                                                                                     (PWA) 2010         Project Professional 2010

    Effort-Driven Tasks
    Scheduling engine support for scheduling a task as effort driven (Note: In PWA, these tasks are editable but the effort driven
    setting on the task is not respected.)

    Task Deadlines
    Create deadlines for a task (NOTE: In PWA, deadlines will be displayed but cannot be created.)

    Edit Task Type
    Editing a task type. (Note: In PWA, task type is not an editable field.)

    WBS codes
    Define custom Work Breakdown Structure codes. (Note: In PWA, viewing custom codes is supported, but changing the code
    definition is not.)

    Create Baselines
    Create a snapshot baseline of the current project plan. (Note: Baselines created in Project Professional 2010 can be viewed in
    PWA as Read-Only.)

    Timeline
    Build and customize the timeline view to visualize schedule details and communicate with stakeholders.

    Team Planner
    Visually drag and drop resources in an interactive resource view to simplify complex resource scenarios.

    Resource Leveling
    Recognize and correct resource over allocation scenarios using various automatic resource leveling techniques.

    Time-Phased Editing
    Edit plans and work on a day-by-day basis.

    Edit Assignment Fields
    Edit assignment views.

    Paste with Task Hierarchy
    Paste hierarchical information included like indenting.

    Network Diagram View
    View, edit, create, and delete tasks in a network diagramming view.

    Task Form View
    View, edit, create, and delete tasks in a form view.




5                                                                                                                                         © Microsoft Corp. All rights reserved
Schedule Management                                                                                                               Project Web App
                                                                                                                                  (PWA) 2010         Project Professional 2010

    Task Information Dialog
    See task details by using a dialog interface.

    Blank (null) Tasks
    Create blank rows (blank, or null, tasks) in a project plan.

    Automatic Calculation
    Schedule the entire project plan, instead of only the current task, without pressing Calculate or F9.

    Text Formatting
    Modify text formatting by using colors and styles.

    Edit Calendars
    Edit calendars for your projects.

    Define Local Custom Fields
    Users can define local custom fields. (Note: In PWA, only users with administrator rights can define local custom fields.)

    Split Tasks
    Split tasks and show them as split in the Gantt chart.

    Backstage™ View
    Quickly access Project tools, templates, and program options using the new Microsoft Office Backstage™ view.

    Assignment Units
    Change the % units for each resource.

    Task Inspector
    Offers additional analysis and intuitive guidance to resolve scheduling conflicts, which you can choose to act upon or not.

    Offline Editing
    Edit project plans when not connected to Project Server 2010.




    *Project Web App (PWA) 2010 & Project Server 2010 & Project Server 2010 CAL
    **Project Professional 2010, as a stand-alone desktop application.




6                                                                                                                                      © Microsoft Corp. All rights reserved

More Related Content

PPTX
Project e Project Server Service Pack 1
PDF
D66123 gc10 toc
PPT
Webinar Bes OutLook
PPTX
MSPC12 - Integrating SharePoint & Project Server 2010 - Giles Hamson (#PC324)
PDF
Wbs schedule prouserguide
PDF
Bpc 10.1 nw classic training
PDF
SharePoint_Developer_Admin.PDF
DOC
Ambikumar - Sharepoint Developer
Project e Project Server Service Pack 1
D66123 gc10 toc
Webinar Bes OutLook
MSPC12 - Integrating SharePoint & Project Server 2010 - Giles Hamson (#PC324)
Wbs schedule prouserguide
Bpc 10.1 nw classic training
SharePoint_Developer_Admin.PDF
Ambikumar - Sharepoint Developer

What's hot (20)

PDF
C_EPMBPC_10 BPC 10 Certification
PDF
CCLA Oracle WebCenter Portal Spaces Case Study
PDF
Part modules help(nx10)_12345678
DOC
Clayton Cobb Resume - SharePoint
PPTX
Mvpskill Saturday EP_28 25 April. 2563 - Microsoft 365 Products Update + DEMO
DOCX
Patricia Todd SharePoint Resume
DOCX
Kleimeyer SharePoint Resume
PDF
Moss2007 Enterprise Features Administration
DOCX
Miguel Alberto Flores Torres AM (1)
PDF
Office Share Point Server2007 Functionaland Architectural Overview
DOCX
Nhi Doan SharePoint Resume
PDF
HIDDAYAT RESUME-SHAREPOINT DEVELOPER
PDF
Lab5 RTC reports and Dashboards
PDF
PDF
Nintex attachment workflow
PPT
Module 1: Overview of Rational Team Concert
PDF
Work status illustrated
PDF
Microsoft Windows Share Point Services Installation Configuration
PPTX
Empowering Business with Hybrid Code/No-Code Solutions by Bob German - SPTechCon
PPSX
Rational team concert (RTC) tips
C_EPMBPC_10 BPC 10 Certification
CCLA Oracle WebCenter Portal Spaces Case Study
Part modules help(nx10)_12345678
Clayton Cobb Resume - SharePoint
Mvpskill Saturday EP_28 25 April. 2563 - Microsoft 365 Products Update + DEMO
Patricia Todd SharePoint Resume
Kleimeyer SharePoint Resume
Moss2007 Enterprise Features Administration
Miguel Alberto Flores Torres AM (1)
Office Share Point Server2007 Functionaland Architectural Overview
Nhi Doan SharePoint Resume
HIDDAYAT RESUME-SHAREPOINT DEVELOPER
Lab5 RTC reports and Dashboards
Nintex attachment workflow
Module 1: Overview of Rational Team Concert
Work status illustrated
Microsoft Windows Share Point Services Installation Configuration
Empowering Business with Hybrid Code/No-Code Solutions by Bob German - SPTechCon
Rational team concert (RTC) tips
Ad

Viewers also liked (10)

DOCX
Synopsis for student interaction portal
PDF
Professional Graduation Project
PDF
STUDENT PORTAL Analysis & Implementation
PDF
Toll application - .NET and Android - SRS
PPTX
Toll app - Android project
PDF
Graduation Project Documentation.PDF
DOC
Graduation Project Report
PPTX
Online Banking Project
DOC
My Project Report Documentation with Abstract & Snapshots
PDF
Android College Application Project Report
Synopsis for student interaction portal
Professional Graduation Project
STUDENT PORTAL Analysis & Implementation
Toll application - .NET and Android - SRS
Toll app - Android project
Graduation Project Documentation.PDF
Graduation Project Report
Online Banking Project
My Project Report Documentation with Abstract & Snapshots
Android College Application Project Report
Ad

Similar to Comparação Project Professional x Project Web App (PWA) (20)

DOCX
Revlon - Project Server 2010 - Case Study
PDF
Version comparisondesktop
PPTX
CPS - Transitioning from SharePoint to Project Server 2013 for Enterprise Pro...
PPTX
Initialization microsoft project 2010
PPTX
Getting Started with Project Online
DOCX
Marquette University Project Server 2010 Case Study
DOCX
Technical Lead (Azure , SharePoint, ASP.Net ), 12+ years exp.
PPTX
Microsoft Project 2013
DOCX
Waqar Ahmed CV
PDF
The Taming of the MS Project for Management Construction and Manufacturing Pr...
PDF
The Taming of Microsoft Project for Construction Projects
DOCX
PPTX
Combining Project and Sharepoint
PPTX
meetroo projects and Microsoft Project Online
PPTX
Project 2010
DOC
Iman Mukhopadhyay_Resume
PPTX
Top 3 tools for Project Management
PDF
Msproject2010 in 16 minutes flat
PPTX
Understanding Tasks End-to-End
Revlon - Project Server 2010 - Case Study
Version comparisondesktop
CPS - Transitioning from SharePoint to Project Server 2013 for Enterprise Pro...
Initialization microsoft project 2010
Getting Started with Project Online
Marquette University Project Server 2010 Case Study
Technical Lead (Azure , SharePoint, ASP.Net ), 12+ years exp.
Microsoft Project 2013
Waqar Ahmed CV
The Taming of the MS Project for Management Construction and Manufacturing Pr...
The Taming of Microsoft Project for Construction Projects
Combining Project and Sharepoint
meetroo projects and Microsoft Project Online
Project 2010
Iman Mukhopadhyay_Resume
Top 3 tools for Project Management
Msproject2010 in 16 minutes flat
Understanding Tasks End-to-End

More from Paulo Junior (20)

PDF
Apresentacao pmi-palestrantes-9-seminario
PPTX
Noano365 pj project
PPTX
Microsoft project 2013
PDF
Gerenciamento de projetos apostila completa
PDF
Gerenciamento de projetos com ms project
PDF
Gerenciamento de projetos aula 6 (tempo)
PDF
Gerenciamento de projetos aula 7 (custos)
PDF
Gerenciamento de projetos aula 13 (riscos)
PDF
Gerenciamento de projetos aula 4 (escopo)
PDF
Gerenciamento de projetos aula 3 (iniciação)
PDF
Gerenciamento de projetos aula 2 (conceitos)
PDF
Gerenciamento de projetos aula 1 (introdução)
PDF
Palestra certificações microsoft
PDF
Benchmarking gp 2010_geral
PDF
Artigo porque gerenciar projetos (barcaui)
PDF
Gestão de projetos em empresas no brasil
PDF
Ensaio teorico corrente critica
PPTX
Aula 03 9 areas de conhecimento
PPTX
Aula 02 pmi
PPTX
Aula 01 projetos
Apresentacao pmi-palestrantes-9-seminario
Noano365 pj project
Microsoft project 2013
Gerenciamento de projetos apostila completa
Gerenciamento de projetos com ms project
Gerenciamento de projetos aula 6 (tempo)
Gerenciamento de projetos aula 7 (custos)
Gerenciamento de projetos aula 13 (riscos)
Gerenciamento de projetos aula 4 (escopo)
Gerenciamento de projetos aula 3 (iniciação)
Gerenciamento de projetos aula 2 (conceitos)
Gerenciamento de projetos aula 1 (introdução)
Palestra certificações microsoft
Benchmarking gp 2010_geral
Artigo porque gerenciar projetos (barcaui)
Gestão de projetos em empresas no brasil
Ensaio teorico corrente critica
Aula 03 9 areas de conhecimento
Aula 02 pmi
Aula 01 projetos

Recently uploaded (20)

PPTX
Capital Investment in IS Infrastracture and Innovation (SDG9)
PPTX
PPT Hafizullah Oria- Final Thesis Exam.pptx
PPTX
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx
PPTX
TS - CIM-as of august 2023 .pptx
PPTX
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx
PDF
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
PDF
France's Top 5 Promising EdTech Companies to Watch in 2025.pdf
PDF
The Role of School Boards in Educational Management (www.kiu.ac.ug)
DOCX
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
PDF
Integrating Porter-Lawler Theory of Motivation and Hofstede's Dimensions of N...
PDF
The Impact of Immigration on National Identity (www.kiu.ac.ug)
PDF
El futuro empresarial 2024 una vista gen
PDF
Investment in CUBA. Basic information for United States businessmen (1957)
PPTX
UNIT 3 INTERNATIONAL BUSINESS [Autosaved].pptx
PDF
Chembond Chemicals Limited Presentation 2025
PDF
IFRS Green Book_Part B for professional pdf
PDF
BeMetals_Presentation_September_2025.pdf
PDF
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
PDF
The Evolution of Legal Communication through History (www.kiu.ac.ug)
DOCX
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
Capital Investment in IS Infrastracture and Innovation (SDG9)
PPT Hafizullah Oria- Final Thesis Exam.pptx
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx
TS - CIM-as of august 2023 .pptx
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
France's Top 5 Promising EdTech Companies to Watch in 2025.pdf
The Role of School Boards in Educational Management (www.kiu.ac.ug)
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
Integrating Porter-Lawler Theory of Motivation and Hofstede's Dimensions of N...
The Impact of Immigration on National Identity (www.kiu.ac.ug)
El futuro empresarial 2024 una vista gen
Investment in CUBA. Basic information for United States businessmen (1957)
UNIT 3 INTERNATIONAL BUSINESS [Autosaved].pptx
Chembond Chemicals Limited Presentation 2025
IFRS Green Book_Part B for professional pdf
BeMetals_Presentation_September_2025.pdf
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
The Evolution of Legal Communication through History (www.kiu.ac.ug)
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...

Comparação Project Professional x Project Web App (PWA)

  • 1. Web-Based Schedule Management Comparison April 2010
  • 2. Web-Based Schedule Management Comparison Feature Key: Limited or Available Project 2010 offers flexibility and choice by providing tailored work management solutions for individuals, teams and the enterprise. Read-only The table below compares only the new web-based schedule management capabilities in Project Web App (PWA) 2010* compared to Project Professional 2010**. Learn more about the Project 2010 family of products and solutions at www.microsoft.com/project. Schedule Management Project Web App (PWA) 2010 Project Professional 2010 Multi-Resource Assignments Able to assign more than one resource to a particular task. Status Change Updates Receive updates on status changes that reschedule the project plan. Keyboard Shortcuts Use keyboard shortcuts for common operations such as indent/insert. Task Hierarchy Full support for displaying and rendering of tasks with hierarchical information. Indent/Outdent Apply full indenting/outdenting of tasks in a project plan. Change Highlighting Easily view project changes and all parts of the schedule affected by the change (successor tasks, summary costs, etc.) with change highlighting. Multi-Level Undo Perform what-if analysis and fully understand the impact of changes by reversing and reapplying an entire set of operations, including views, data and option changes. Cut/Copy/Paste Collaborate on schedule development by copying/pasting schedule details between applications. Flexible Views Move columns to define a specific view. High Fidelity Gantt Charts Create vivid, colorful Gantt charts; customizable Gantt chart styles. Grouping Ability to apply multiple grouping rows to a project plan. 2 © Microsoft Corp. All rights reserved
  • 3. Schedule Management Project Web App (PWA) 2010 Project Professional 2010 Sorting Ability for end user to sort project plan data. Filtering Ability to filter project plans by any data value in the plan. Automatically Scheduled Tasks Indicate tasks (mode) to be scheduled automatically using the Project scheduling engine. Manually Scheduled Tasks Indicate tasks (mode) to be scheduled manually. Linking Create, edit and delete task dependency relationships. Zoom In/ Zoom Out Use zoom controls on the status bar to quickly change the timeline perspective of your project schedules. Scroll to Task Select a task and then move the task into view on the Gantt chart. View and Edit Custom Fields Users can view and edit project metadata using custom fields. Project Information Edit project-level fields and properties. Edit Large Projects No limit to the size of plans that are editable. (Note: Larger projects may have performance implications but no limits are built in.) Import from SharePoint Import data from a SharePoint project task list into a project plan. SharePoint 2010 Project Task Lists Ability to accept SharePoint 2010 project task list status updates. (Note: Only using Project Professional 2010 are project task list status updates synchronized/bi-directional with SharePoint 2010 once the plan is published.) Connect to Project Server 2010 Ability to connect to Project Server 2010. Microsoft® Office Fluent™ User Interface Increase productivity with the Ribbon, a tab interface to quickly find and use Project features and controls. 3 © Microsoft Corp. All rights reserved
  • 4. Schedule Management Project Web App (PWA) 2010 Project Professional 2010 Real-Time Validation Mark cell data as invalid as you edit, instead of after saving or validating. Error Handling Handle invalid data and present data in an easy-to-use interface that helps resolve issues. Fill Down Drag bottom right corner of a cell to repeat data in the cells below. % Complete Mark task progress as a percentage of the assigned work that is complete. Cost and Material Resource Assignments Ability to assign Cost Resources or Material Resources to tasks (NOTE: assignments cannot be made in the web but previous assignments from Project Professional 2010 are available as Read-Only.) Inactive Tasks Mark a task as inactive. (Note: In PWA, tasks marked as inactive in Project Professional 2010 are Read-Only.) Edit Master Projects Edit master projects. (Note: In PWA, master projects are Read-Only.) Cross Project Links Create, edit, and delete a dependency relationship with a task in another project. (Note: In PWA, editing cross-project links is not supported; cross-project links created in Project Professional 2010 are Read-Only.) Summary Task Assignment Create a resource assignment on a summary task. (Note: In PWA, creating summary task assignments is not supported. Summary task assignments created in Project Professional 2010 are available in PWA as Read-Only.) Task Calendars Define a custom calendar associated with a task. (Note: In PWA, task calendars cannot be used, and project plans created in Project Professional 2010 that contain task calendars are available as Read-Only.) Fixed Work Tasks Define the type of a task as fixed work. (Note: In PWA, tasks cannot be created as fixed work and project plans created in Project Professional 2010 that contain fixed work tasks are available in PWA as Read-Only.) Edit Sub-Projects Ability to edit sub-projects within a master project. (Note: In PWA, sub-projects cannot be added to a project, and master projects are Read-Only. Sub-projects can be edited separately from a master project.) 4 © Microsoft Corp. All rights reserved
  • 5. Schedule Management Project Web App (PWA) 2010 Project Professional 2010 Effort-Driven Tasks Scheduling engine support for scheduling a task as effort driven (Note: In PWA, these tasks are editable but the effort driven setting on the task is not respected.) Task Deadlines Create deadlines for a task (NOTE: In PWA, deadlines will be displayed but cannot be created.) Edit Task Type Editing a task type. (Note: In PWA, task type is not an editable field.) WBS codes Define custom Work Breakdown Structure codes. (Note: In PWA, viewing custom codes is supported, but changing the code definition is not.) Create Baselines Create a snapshot baseline of the current project plan. (Note: Baselines created in Project Professional 2010 can be viewed in PWA as Read-Only.) Timeline Build and customize the timeline view to visualize schedule details and communicate with stakeholders. Team Planner Visually drag and drop resources in an interactive resource view to simplify complex resource scenarios. Resource Leveling Recognize and correct resource over allocation scenarios using various automatic resource leveling techniques. Time-Phased Editing Edit plans and work on a day-by-day basis. Edit Assignment Fields Edit assignment views. Paste with Task Hierarchy Paste hierarchical information included like indenting. Network Diagram View View, edit, create, and delete tasks in a network diagramming view. Task Form View View, edit, create, and delete tasks in a form view. 5 © Microsoft Corp. All rights reserved
  • 6. Schedule Management Project Web App (PWA) 2010 Project Professional 2010 Task Information Dialog See task details by using a dialog interface. Blank (null) Tasks Create blank rows (blank, or null, tasks) in a project plan. Automatic Calculation Schedule the entire project plan, instead of only the current task, without pressing Calculate or F9. Text Formatting Modify text formatting by using colors and styles. Edit Calendars Edit calendars for your projects. Define Local Custom Fields Users can define local custom fields. (Note: In PWA, only users with administrator rights can define local custom fields.) Split Tasks Split tasks and show them as split in the Gantt chart. Backstage™ View Quickly access Project tools, templates, and program options using the new Microsoft Office Backstage™ view. Assignment Units Change the % units for each resource. Task Inspector Offers additional analysis and intuitive guidance to resolve scheduling conflicts, which you can choose to act upon or not. Offline Editing Edit project plans when not connected to Project Server 2010. *Project Web App (PWA) 2010 & Project Server 2010 & Project Server 2010 CAL **Project Professional 2010, as a stand-alone desktop application. 6 © Microsoft Corp. All rights reserved