The document lists excavation works that shall not be measured separately, including site preparation works like clearing vegetation, unauthorized changes to excavation, and forming temporary structures. It also specifies that excavation shall be measured in successive stages of 1.5m and described as "excavate and get out", which includes throwing excavated earth at least 1m clear of the excavation edge.