1) The document discusses ground improvement techniques of preloading and vertical drainage. Preloading involves applying a surcharge load to improve soil strength and reduce settlements before construction.
2) Vertical drains are often used with preloading to accelerate consolidation by shortening the drainage path. Common types are sand drains and prefabricated vertical drains.
3) Vacuum preloading is described as an alternative to conventional preloading using surcharge loads, applying atmospheric pressure via a membrane system instead. This requires an effective drainage and vacuum maintenance system.