Preliminary Evaluation of Chip & Coolant Handling System 

                                                             (These are not represented to be actual, but industry guidelines used 
Cost Factors used to prepare Estimate                        to determine initial project viability)

 Scheduled run hours:           M‐Th are two (12) hour shifts, F,S,S are one (12) hour shift. Total of 11 shifts per week.

 Run weeks per year:            50
 Shifts per year                550
 Cost of machine downtime                                    (Verify based on LOST SALES, value of production,  total labor, price of non
                                $400 
 ($/hr):                                                                                 conformance??)
 Hard Labor & Burden ($/hr):    $90 
 Soft Labor & Burden ($/hr):    $0 



                                                                         "Hard"          "Lost Sales" 
                                       Resources Used 
           Activity                                          Hours       Savings           Savings                    Comment
                                          (Current)
                                                                       Potential ($)      Potential
Planned Downtime
                                6 hrs per 4 weeks X 6 
     Sump service                                                468         $13,572           $187,200 Go to 6 month clean‐out
                                people

Unplanned Downtime*
     Operation 1                7.5 minutes every hour           825         $74,250           $330,000 1 machine at 550 shifts
     Operation 2                7.5 minutes every 2 hrs          825         $74,250           $330,000 2 machines
     Operation 3                7.5 minutes every 2 hrs          825         $74,250           $330,000 2 machines
                                                                                                        Get (4) hoppers of chips per 
                                                                                                        shift, but conveyor doesn't bring 
                                5 minutes X 3 times/12 hr 
     Operation 4                                                 138         $12,375            $55,000 everything out. Have to 
                                shift
                                                                                                        manually remove fines/chips 
                                                                                                        from sump.

Labor Savings
                                                                                                           Hard or soft savings? (Can this 
     Chip hopper leveling       10 minutes/hr X 1 person        1100                             $99,000
                                                                                                           time be used to make parts?)

                                1 hour total per 12 hour                                                   Hard or soft savings? (Can this 
     Housekeeping                                                550                             $49,500
                                shift                                                                      time be used to make parts?)

Total Estimated Improvement                                                $248,697         $1,380,700

* Unplanned machine downtime costs may be impacted by which operation causes a bottleneck. If we understand this we can potentially 
help eliminate.

More Related Content

PDF
Henry Filter Upgrade Benefit Analysis 4 22 10
PDF
Harrigan Process Engineering
PDF
Harrigan Plant Services
PDF
Harrigan Equipment
PDF
Business Model 10 13 2010
PPTX
A Progressive Comparison
PDF
Sirris manufacturingday2011 flexible-robotising-robo_job
PDF
F5 Answers To Examples
Henry Filter Upgrade Benefit Analysis 4 22 10
Harrigan Process Engineering
Harrigan Plant Services
Harrigan Equipment
Business Model 10 13 2010
A Progressive Comparison
Sirris manufacturingday2011 flexible-robotising-robo_job
F5 Answers To Examples

Similar to KMS 2005 (20)

PDF
Page 17 Rank Your Profit Opportunities
PPT
A presentation on job planning job manuals,
PPTX
Repair & Maintenance Planning for Commercial Kitchens
PPT
Haeger Profit Center
PPTX
Pascual Martinez Giesen
PDF
Case Study
PPTX
Energy Innovation ILIT Powerpoint
PDF
CIM Report
PDF
CIM report - final
PDF
CIM report - final
PDF
Ez Strip TR Muncher
XLSX
Pwds V No Pwds
PPT
10. Modul 10 Pencapaian & Penciptaan Nilai KIK
DOCX
My Resume Machinist
PDF
Packaging Line Change-over White Paper
PPTX
Method for-increasing-energy-efficiency-in-flexible-manufacturing
PPT
TrashScan
DOC
Group 8 murtuza steel company
DOCX
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
PDF
Industrial Project Management
Page 17 Rank Your Profit Opportunities
A presentation on job planning job manuals,
Repair & Maintenance Planning for Commercial Kitchens
Haeger Profit Center
Pascual Martinez Giesen
Case Study
Energy Innovation ILIT Powerpoint
CIM Report
CIM report - final
CIM report - final
Ez Strip TR Muncher
Pwds V No Pwds
10. Modul 10 Pencapaian & Penciptaan Nilai KIK
My Resume Machinist
Packaging Line Change-over White Paper
Method for-increasing-energy-efficiency-in-flexible-manufacturing
TrashScan
Group 8 murtuza steel company
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
Industrial Project Management
Ad

KMS 2005

  • 1. Preliminary Evaluation of Chip & Coolant Handling System  (These are not represented to be actual, but industry guidelines used  Cost Factors used to prepare Estimate to determine initial project viability) Scheduled run hours: M‐Th are two (12) hour shifts, F,S,S are one (12) hour shift. Total of 11 shifts per week. Run weeks per year: 50 Shifts per year 550 Cost of machine downtime  (Verify based on LOST SALES, value of production,  total labor, price of non $400  ($/hr): conformance??) Hard Labor & Burden ($/hr): $90  Soft Labor & Burden ($/hr): $0  "Hard"  "Lost Sales"  Resources Used  Activity Hours Savings  Savings  Comment (Current) Potential ($) Potential Planned Downtime 6 hrs per 4 weeks X 6  Sump service 468 $13,572 $187,200 Go to 6 month clean‐out people Unplanned Downtime* Operation 1 7.5 minutes every hour 825 $74,250 $330,000 1 machine at 550 shifts Operation 2 7.5 minutes every 2 hrs 825 $74,250 $330,000 2 machines Operation 3 7.5 minutes every 2 hrs 825 $74,250 $330,000 2 machines Get (4) hoppers of chips per  shift, but conveyor doesn't bring  5 minutes X 3 times/12 hr  Operation 4 138 $12,375 $55,000 everything out. Have to  shift manually remove fines/chips  from sump. Labor Savings Hard or soft savings? (Can this  Chip hopper leveling 10 minutes/hr X 1 person 1100 $99,000 time be used to make parts?) 1 hour total per 12 hour  Hard or soft savings? (Can this  Housekeeping 550 $49,500 shift time be used to make parts?) Total Estimated Improvement $248,697 $1,380,700 * Unplanned machine downtime costs may be impacted by which operation causes a bottleneck. If we understand this we can potentially  help eliminate.