RELIABILITY DEMONSTRATION TEST (RDT)
                Discover product weaknesses and failure modes that occur over time
                    Verify product MTBF at a desired statistical confidence level
                                      Accelerate the future

RDTs are long duration physical stress tests which measure
product reliability and accelerate failure mechanisms.                                                    Demonstrated
Product performance is monitored and data is statistically                                                200,000 hour
analyzed to determine if it meets its goal. Accelerated                                                   MTBF!!!!!
environments (elevated stresses) and multiple samples are
used to reduce test time - accelerating the future!

     Demonstrate and quantify product reliability
     Ensure confidence prior to initial shipments                   F
       Plan warranty costs and spares strategy                      a                   T
        Satisfy your customer’s requirements                        i                EC
                                                                                  EJ                 E
                                                                    l           R                 NU
                                                                                                TI
                     TEST PLAN                                      u                         N
                                                                                            CO               PT
A comprehensive Test Plan is crucial to ensuring timely             r                                      CE
success and maximum Return On Investment. After                     e                                    AC
establishing the reliability goal, Ops A La Carte works             s
closely with the client to create the plan. A demonstration
model is selected then all factors (fixed and variable) to be                                              Test Time
considered are identified. A 3-D matrix of options
(acceleration factor parameters, number of samples, length
of test, confidence levels, etc.) is typically assembled and            REPORT AND PRESENTATION
reviewed with the client to select the best set of options      Final Analysis and Detailed Report        ~$ 1-2K
which balance cost and value. The deliverable is an RDT         Executive Summary format explains:
Plan document with detailed test setup, test protocols,                 The methods used
failure criteria definitions, the amount and type of test               Analysis of the product performance (failures)
articles, test equipment required, and total time. Typically            The results achieved compared with the goal
requires 5-10 business days to complete.                                Significance of the results
   ○ Product in Benign End Environment              ~$ 2-3K             Recommended product improvements
   ○ Product under Stress in End Environment                    On-Site Presentation                          ~$ 1-2K
       (end environment consists of stresses such as temp.      One to two hour review of results/recommendations, with
       cycling, vibration, and humidity)           ~$ 3-10K     analysis of the effects of changes to the product.

               TEST EXECUTION
Using the RDT Plan document, the test can be executed at                OTHER RELATED SERVICES
any location with the required facilities and equipment             Estimate product Failure Rate (MTBF) with Reliability
(e.g. at the client's site or an independent test lab).               Predictions at Component Level and System Level
   ○ Typical Product                             TBD                Establish risks associated with failures via Failure
                                                                      Modes Effects and Criticality Analysis (FMECA)
     MONITORING OF TEST DATA                                        Maximize product robustness with Accelerated Stress
During RDT execution, recorded results are reviewed on a              Testing (HALT)
regular basis to guide decisions on declaring it successful,        Eliminate infant mortalities with production screening
continuing, modifying, or abandoning the test. Ops A La               (HASS)
Carte’s engineering experience can ensure that product
behavior will be reviewed and interpreted appropriately in
its context. Deliverables are regular updates of progress                               TERMS
status via plots (using Weibull analysis methods) and brief     Expedited (rush) service available at nominal fee
Summary Worksheet with plots on completion.                     Formal quotes: Fixed Price or Time and Materials basis
   ○ Product in Benign End Environment            ~$ 2-3K       Invoicing: On progress basis
   ○ Product under Stress in End Environment ~$ 3-5K            Payment due: Net 15 days after invoice

                    Ops A La Carte LLC             www.opsalacarte.com            (408) 472-3889                         8/04

More Related Content

PPTX
Msa training
PPT
Measurement systems analysis v1.1
PDF
PROCESS CAPABILITY
PDF
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Measurement System ...
PPTX
Lesson11
PPTX
Process capability
PDF
10. measurement system analysis (msa)
PDF
6. process capability analysis (variable data)
Msa training
Measurement systems analysis v1.1
PROCESS CAPABILITY
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Measurement System ...
Lesson11
Process capability
10. measurement system analysis (msa)
6. process capability analysis (variable data)

What's hot (20)

PPT
Training ppt for control plan
PPT
Basics of Process Capability
PDF
Process Quality Control Training
PPTX
Intro to Measurement System Analysis (MSA)
PPTX
Design of Experiments
PPTX
APQP Training presentation
PDF
Attribute MSA presentation
PPT
Reliability integration across the product life cycle
PDF
NG BB 24 Measurement System Analysis - Continuous
PDF
Gage R&R Measurement Systems Analysis Sample Slides
PPTX
Six Sigma : Process Capability
PPT
SPC - Statistical process control
PPS
R&R Analysis Using SEDana
PDF
Measuremen Systems Analysis Training Module
PPTX
Building a Better PPAP Experience
PPT
Process Capability[1]
PPTX
Estimation of process capability 1st yr mpharmacy
PPTX
Statistical process control
PPT
Ppap training-presentation
PDF
Process Capability Analysis in Single and Multiple Batch Manufacturing Systems
Training ppt for control plan
Basics of Process Capability
Process Quality Control Training
Intro to Measurement System Analysis (MSA)
Design of Experiments
APQP Training presentation
Attribute MSA presentation
Reliability integration across the product life cycle
NG BB 24 Measurement System Analysis - Continuous
Gage R&R Measurement Systems Analysis Sample Slides
Six Sigma : Process Capability
SPC - Statistical process control
R&R Analysis Using SEDana
Measuremen Systems Analysis Training Module
Building a Better PPAP Experience
Process Capability[1]
Estimation of process capability 1st yr mpharmacy
Statistical process control
Ppap training-presentation
Process Capability Analysis in Single and Multiple Batch Manufacturing Systems
Ad

Viewers also liked (7)

PPT
Trapped by MTBF
PPT
Perils of an Old Metric: MTBF
PDF
Alternatives to MTBF
PPT
Three primary steps in maintenance reliability engineering
PPT
Wind turbine reliability
PDF
A Proposal for an Alternative to MTBF/MTTF
PDF
Failure Reporting, Analysis, Corrective Action System
Trapped by MTBF
Perils of an Old Metric: MTBF
Alternatives to MTBF
Three primary steps in maintenance reliability engineering
Wind turbine reliability
A Proposal for an Alternative to MTBF/MTTF
Failure Reporting, Analysis, Corrective Action System
Ad

Similar to Ops a la_carte_rdt_broch (20)

PDF
3. Qulaity assurance, Quality Control, Inspection, TQM
PPTX
Introduction to testing.
PPTX
Technology transfer plan & exhibit
PDF
testplan software testing planing tests.pdf
PDF
test planning and test case test suite.pdf
PPT
Six sigma-measure-phase2505
PPT
Lecture08
PPTX
Test Plan.pptx
PPTX
4.3.application performance
PPT
ISTQB, ISEB Lecture Notes- 2
PDF
What is Test Matrix?
PDF
20100531 TE Basic Knowledge Rev.1 from TW Lam
PDF
DMAIIC (DMAIC is a data-driven, problem)
PPT
ISTQB / ISEB Foundation Exam Practice - 2
PPTX
Performance testing
PPTX
Qualification validation ppt_171116
PPTX
A study on the efficiency of a test analysis method utilizing test-categories...
PPTX
20240903_cfp_mpox_evaluation_ppt_template_FV_EN_.pptx
PPS
ISTQB Foundation - Chapter 2
PDF
calibrationintervalspresentation.pdf
3. Qulaity assurance, Quality Control, Inspection, TQM
Introduction to testing.
Technology transfer plan & exhibit
testplan software testing planing tests.pdf
test planning and test case test suite.pdf
Six sigma-measure-phase2505
Lecture08
Test Plan.pptx
4.3.application performance
ISTQB, ISEB Lecture Notes- 2
What is Test Matrix?
20100531 TE Basic Knowledge Rev.1 from TW Lam
DMAIIC (DMAIC is a data-driven, problem)
ISTQB / ISEB Foundation Exam Practice - 2
Performance testing
Qualification validation ppt_171116
A study on the efficiency of a test analysis method utilizing test-categories...
20240903_cfp_mpox_evaluation_ppt_template_FV_EN_.pptx
ISTQB Foundation - Chapter 2
calibrationintervalspresentation.pdf

More from Accendo Reliability (20)

PDF
Should RCM be applied to all assets.pdf
PDF
T or F Must have failure data.pdf
PDF
Should RCM Templates be used.pdf
PDF
12-RCM NOT a Maintenance Program.pdf
PDF
13-RCM Reduces Maintenance.pdf
PDF
11-RCM is like a diet.pdf
PDF
09-Myth RCM only product is maintenance.pdf
PDF
10-RCM has serious weaknesses industrial environment.pdf
PDF
08-Master the basics carousel.pdf
PDF
07-Manufacturer Recommended Maintenance.pdf
PDF
06-Is a Criticality Analysis Required.pdf
PDF
05-Failure Modes Right Detail.pdf
PDF
03-3 Ways to Do RCM.pdf
PDF
04-Equipment Experts Couldn't believe response.pdf
PDF
02-5 RCM Myths Carousel.pdf
PDF
01-5 CBM Facts.pdf
PDF
Lean Manufacturing
PDF
Reliability Engineering Management course flyer
PPTX
How to Create an Accelerated Life Test
PPTX
Reliability Programs
Should RCM be applied to all assets.pdf
T or F Must have failure data.pdf
Should RCM Templates be used.pdf
12-RCM NOT a Maintenance Program.pdf
13-RCM Reduces Maintenance.pdf
11-RCM is like a diet.pdf
09-Myth RCM only product is maintenance.pdf
10-RCM has serious weaknesses industrial environment.pdf
08-Master the basics carousel.pdf
07-Manufacturer Recommended Maintenance.pdf
06-Is a Criticality Analysis Required.pdf
05-Failure Modes Right Detail.pdf
03-3 Ways to Do RCM.pdf
04-Equipment Experts Couldn't believe response.pdf
02-5 RCM Myths Carousel.pdf
01-5 CBM Facts.pdf
Lean Manufacturing
Reliability Engineering Management course flyer
How to Create an Accelerated Life Test
Reliability Programs

Recently uploaded (20)

PDF
Introduction to MCP and A2A Protocols: Enabling Agent Communication
PDF
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
PDF
A symptom-driven medical diagnosis support model based on machine learning te...
PDF
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
PDF
EIS-Webinar-Regulated-Industries-2025-08.pdf
PDF
SaaS reusability assessment using machine learning techniques
PDF
Data Virtualization in Action: Scaling APIs and Apps with FME
PDF
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
DOCX
Basics of Cloud Computing - Cloud Ecosystem
PDF
Build Real-Time ML Apps with Python, Feast & NoSQL
PDF
Early detection and classification of bone marrow changes in lumbar vertebrae...
PDF
Advancing precision in air quality forecasting through machine learning integ...
PDF
CEH Module 2 Footprinting CEH V13, concepts
PDF
LMS bot: enhanced learning management systems for improved student learning e...
PDF
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
PPTX
SGT Report The Beast Plan and Cyberphysical Systems of Control
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PDF
Ensemble model-based arrhythmia classification with local interpretable model...
PDF
Co-training pseudo-labeling for text classification with support vector machi...
PDF
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf
Introduction to MCP and A2A Protocols: Enabling Agent Communication
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
A symptom-driven medical diagnosis support model based on machine learning te...
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
EIS-Webinar-Regulated-Industries-2025-08.pdf
SaaS reusability assessment using machine learning techniques
Data Virtualization in Action: Scaling APIs and Apps with FME
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
Basics of Cloud Computing - Cloud Ecosystem
Build Real-Time ML Apps with Python, Feast & NoSQL
Early detection and classification of bone marrow changes in lumbar vertebrae...
Advancing precision in air quality forecasting through machine learning integ...
CEH Module 2 Footprinting CEH V13, concepts
LMS bot: enhanced learning management systems for improved student learning e...
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
SGT Report The Beast Plan and Cyberphysical Systems of Control
giants, standing on the shoulders of - by Daniel Stenberg
Ensemble model-based arrhythmia classification with local interpretable model...
Co-training pseudo-labeling for text classification with support vector machi...
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf

Ops a la_carte_rdt_broch

  • 1. RELIABILITY DEMONSTRATION TEST (RDT) Discover product weaknesses and failure modes that occur over time Verify product MTBF at a desired statistical confidence level Accelerate the future RDTs are long duration physical stress tests which measure product reliability and accelerate failure mechanisms. Demonstrated Product performance is monitored and data is statistically 200,000 hour analyzed to determine if it meets its goal. Accelerated MTBF!!!!! environments (elevated stresses) and multiple samples are used to reduce test time - accelerating the future! Demonstrate and quantify product reliability Ensure confidence prior to initial shipments F Plan warranty costs and spares strategy a T Satisfy your customer’s requirements i EC EJ E l R NU TI TEST PLAN u N CO PT A comprehensive Test Plan is crucial to ensuring timely r CE success and maximum Return On Investment. After e AC establishing the reliability goal, Ops A La Carte works s closely with the client to create the plan. A demonstration model is selected then all factors (fixed and variable) to be Test Time considered are identified. A 3-D matrix of options (acceleration factor parameters, number of samples, length of test, confidence levels, etc.) is typically assembled and REPORT AND PRESENTATION reviewed with the client to select the best set of options Final Analysis and Detailed Report ~$ 1-2K which balance cost and value. The deliverable is an RDT Executive Summary format explains: Plan document with detailed test setup, test protocols, The methods used failure criteria definitions, the amount and type of test Analysis of the product performance (failures) articles, test equipment required, and total time. Typically The results achieved compared with the goal requires 5-10 business days to complete. Significance of the results ○ Product in Benign End Environment ~$ 2-3K Recommended product improvements ○ Product under Stress in End Environment On-Site Presentation ~$ 1-2K (end environment consists of stresses such as temp. One to two hour review of results/recommendations, with cycling, vibration, and humidity) ~$ 3-10K analysis of the effects of changes to the product. TEST EXECUTION Using the RDT Plan document, the test can be executed at OTHER RELATED SERVICES any location with the required facilities and equipment Estimate product Failure Rate (MTBF) with Reliability (e.g. at the client's site or an independent test lab). Predictions at Component Level and System Level ○ Typical Product TBD Establish risks associated with failures via Failure Modes Effects and Criticality Analysis (FMECA) MONITORING OF TEST DATA Maximize product robustness with Accelerated Stress During RDT execution, recorded results are reviewed on a Testing (HALT) regular basis to guide decisions on declaring it successful, Eliminate infant mortalities with production screening continuing, modifying, or abandoning the test. Ops A La (HASS) Carte’s engineering experience can ensure that product behavior will be reviewed and interpreted appropriately in its context. Deliverables are regular updates of progress TERMS status via plots (using Weibull analysis methods) and brief Expedited (rush) service available at nominal fee Summary Worksheet with plots on completion. Formal quotes: Fixed Price or Time and Materials basis ○ Product in Benign End Environment ~$ 2-3K Invoicing: On progress basis ○ Product under Stress in End Environment ~$ 3-5K Payment due: Net 15 days after invoice Ops A La Carte LLC www.opsalacarte.com (408) 472-3889 8/04