PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi . K Abhijeet Kumar
Project “ A project is a series of activities directed to accomplishment of  a desired objective.” Plan your work first…..then work your plan
Network analysis Introduction Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. One definition of a project: “ A project is a temporary endeavour undertaken to create a "unique" product or service”
History Developed in 1950’s CPM by DuPont for chemical plants PERT by U.S. Navy for Polaris missile PERT  was developed by the US Navy for the planning and control of the  Polaris missile program  and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks).  CPM  was developed by  Du Pont  and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?)
CPM - Critical Path Method Definition: In  CPM  activities are shown as a network of precedence relationships using activity-on-node network construction Single estimate of activity time Deterministic activity times USED IN  :  Production management  - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
PERT -  Project Evaluation & Review Techniques Definition: In  PERT  activities are shown as a network of precedence relationships using activity-on-arrow network construction Multiple time estimates  Probabilistic activity times USED IN  :  Project management  -  for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This  technique uses probabilistic time estimates.
Originated by H.L.Gantt in 1918 Gantt chart Advantages  - Gantt charts are quite commonly used. They provide an easy graphical representation of when activities (might) take place. Limitations  Do not clearly indicate  details regarding the progress of activities Do not give a clear indication of interrelation ship between the separate activities
CPM/PERT These deficiencies can be eliminated to a large extent  by showing the interdependence of various activities by means of connecting arrows called network technique. Overtime CPM and PERT became one technique ADVANTAGES: Precedence relationships large projects more efficient
The Project Network Use of nodes and arrows Arrows   An arrow leads from tail to head directionally Indicate  ACTIVITY,  a time consuming effort  that is required to perform a part of the work. Nodes   A node is represented by a circle -  Indicate  EVENT,  a point in time where one or more activities start and/or  finish.
Activity on Node & Activity on Arrow Activity on Node -  A completion of an activity is represented by a node Activity on Arrow -  An arrow represents a task, while a node is the completion of a task -  Arrows represent order of events
Activity Slack Each event has two important times associated with it : Earliest time  ,  Te  , which is a calendar time when a event can occur when all the predecessor events completed at the earliest possible times Latest time  ,  TL ,  which is the latest time the event can occur with out delaying the subsequent events and completion of project. Difference between the latest time and the earliest time of an event is the  slack time  for that event  Positive slack  :  Slack is the amount of time an event  can be delayed without delaying the project completion
Critical Path Is that the sequence of activities and events where there is no “slack”  i.e..  Zero slack Longest path through a network minimum project completion time
Benefits of CPM/PERT Useful at many stages of project management Mathematically simple Give critical path and slack time Provide project documentation Useful in monitoring costs
Questions Answered by CPM & PERT Completion date? On Schedule? Within Budget? Critical Activities? How can the project be finished early at the least cost?
example Illustration of network analysis of a minor redesign of a product and its associated packaging. The key question is:  How long will it take to complete this project ?
For clarity, this list is kept to a minimum by specifying only immediate relationships, that is relationships involving activities that " occur near to each other in time".
"What activities must be finished before this activity can start"   could we complete this project in 30 weeks?  could we complete this project in 2 weeks?   One answer could be, if we first do activity 1, then activity 2, then activity 3, ...., then activity 10, then activity 11 and the project would then take the sum of the activity completion times, 30 weeks. “ What is the minimum possible time in which we can complete this project ?   “ Before starting any of the above activity, the questions asked would be
We shall see below how the network analysis diagram/picture we construct helps us to answer this question.
CRITICAL PATH TAKES  24 WEEKS  FOR THE COMPLETION OF THE PROJECT
Packages are available to determine the shortest path and other relevant information.
Data entry window
Output of the package
Limitations to CPM/PERT Clearly defined, independent and stable activities Specified precedence relationships Over emphasis on critical paths
Thank you

More Related Content

PPTX
Programme evaluation & review technique (pert)
PPTX
Programme evaluation and review technique &Gantt Chart
PPTX
Applications of pert
PPTX
Pert and mbo
PPTX
Pert and its applications
PPTX
Seminar on pert
PPT
Pert
Programme evaluation & review technique (pert)
Programme evaluation and review technique &Gantt Chart
Applications of pert
Pert and mbo
Pert and its applications
Seminar on pert
Pert

What's hot (20)

PPT
06 pert cpm
PPT
P E R T
PDF
“Application of the Program Evaluation Review and Technique
PPT
Project management Using Pert
PDF
Program Evaluation And Review Technique
PPTX
Project management techniques
PPTX
Unit v mha project evaluation review technique (pert)
PPTX
PERT-CPM : PROJECT MANAGEMENT TOOLS
PDF
Gantt PERT and CPM
PPTX
Program evaluation and review technique
PPTX
Project Management Through Gantt & Pert Chart
PPTX
Software project management tools
PPTX
PERT & Gantt Chart
PPT
Program Evaluation and Review Technique
PDF
pert chart guide for dummies
PPTX
PM scheduling techniques
PPTX
Pert, cpm & gert
PPT
Project Management: NETWORK ANALYSIS - CPM and PERT
PPT
PERT, Programme Evaluation Review Technique, POOJA GODIYAL
06 pert cpm
P E R T
“Application of the Program Evaluation Review and Technique
Project management Using Pert
Program Evaluation And Review Technique
Project management techniques
Unit v mha project evaluation review technique (pert)
PERT-CPM : PROJECT MANAGEMENT TOOLS
Gantt PERT and CPM
Program evaluation and review technique
Project Management Through Gantt & Pert Chart
Software project management tools
PERT & Gantt Chart
Program Evaluation and Review Technique
pert chart guide for dummies
PM scheduling techniques
Pert, cpm & gert
Project Management: NETWORK ANALYSIS - CPM and PERT
PERT, Programme Evaluation Review Technique, POOJA GODIYAL
Ad

Viewers also liked (7)

PDF
SINDROME METABOLICO
PDF
Aplicaciones lineales
PPT
Excursión zoológico la Aurora
PPTX
Complejidad de un algoritmo
PPTX
Funciones de excel
PDF
E-Book Os Novos Clientes DOM Strategy Partners 2012
PPTX
Corporativo Seven
SINDROME METABOLICO
Aplicaciones lineales
Excursión zoológico la Aurora
Complejidad de un algoritmo
Funciones de excel
E-Book Os Novos Clientes DOM Strategy Partners 2012
Corporativo Seven
Ad

Similar to Pert 182 (20)

PPT
06_Pert cpmugfhghfhxr justify gfghhhhhhh
PPT
time mamangement.ppt
PPT
Pert -cpm
PPT
Pert -cpm
PPT
PPT
06 pert cpm
PPT
3...06 pert cpm
PDF
project managment lesson mechanical engineering
PPTX
porject management
PPT
06 pert cpm
PPT
06 pert cpm (1)
PPT
Pert cpm
PPT
S pert cpm
PPTX
Project Management & Engineering Economics
PPTX
MPA/BPA/TU-Project managemen PERT VS CPM
PPTX
PMP Project Management Basics Tutorial For Beginners
PPT
Project management
PPT
Network analysis cpm module3 ppt
PPT
Pert Cpm Nis
PPTX
pert-cpm.pptx
06_Pert cpmugfhghfhxr justify gfghhhhhhh
time mamangement.ppt
Pert -cpm
Pert -cpm
06 pert cpm
3...06 pert cpm
project managment lesson mechanical engineering
porject management
06 pert cpm
06 pert cpm (1)
Pert cpm
S pert cpm
Project Management & Engineering Economics
MPA/BPA/TU-Project managemen PERT VS CPM
PMP Project Management Basics Tutorial For Beginners
Project management
Network analysis cpm module3 ppt
Pert Cpm Nis
pert-cpm.pptx

More from itsvineeth209 (20)

PPTX
Green Marketing
PPT
Evolution,Drivers Of Indian Retail
PPT
Intro To Tretailing 6.2.09
PPT
Indian Retail Sector
PPT
Sampling Design
DOC
Sampling Design
PPT
Rm 10 Report Writing 2
PPT
Rm 6 Sampling Design
PPT
Rm 1 Intro Types Research Process
PPT
Rm 5 Methods Of Data Collection
PPT
Rm 3 Hypothesis
DOC
Research Design
PPT
Rm 4 Research Design
PPT
Rm 2 Problem Identification
PPT
Transportation Problem
DOC
Transportation Problem
PPT
Simplex Method
DOC
Procedure Of Simplex Method
PPT
North West Corner Rule
Green Marketing
Evolution,Drivers Of Indian Retail
Intro To Tretailing 6.2.09
Indian Retail Sector
Sampling Design
Sampling Design
Rm 10 Report Writing 2
Rm 6 Sampling Design
Rm 1 Intro Types Research Process
Rm 5 Methods Of Data Collection
Rm 3 Hypothesis
Research Design
Rm 4 Research Design
Rm 2 Problem Identification
Transportation Problem
Transportation Problem
Simplex Method
Procedure Of Simplex Method
North West Corner Rule

Recently uploaded (20)

PPTX
pharmaceutics-1unit-1-221214121936-550b56aa.pptx
PDF
Chevening Scholarship Application and Interview Preparation Guide
DOCX
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
PDF
Laparoscopic Imaging Systems at World Laparoscopy Hospital
PDF
GSA-Past-Papers-2010-2024-2.pdf CSS examination
PDF
African Communication Research: A review
PPTX
ACFE CERTIFICATION TRAINING ON LAW.pptx
PDF
GIÁO ÁN TIẾNG ANH 7 GLOBAL SUCCESS (CẢ NĂM) THEO CÔNG VĂN 5512 (2 CỘT) NĂM HỌ...
PPTX
Neurological complocations of systemic disease
PPTX
Diploma pharmaceutics notes..helps diploma students
PPTX
ENGlishGrade8_Quarter2_WEEK1_LESSON1.pptx
PDF
Diabetes Mellitus , types , clinical picture, investigation and managment
PDF
FAMILY PLANNING (preventative and social medicine pdf)
PDF
BSc-Zoology-02Sem-DrVijay-Comparative anatomy of vertebrates.pdf
PDF
FYJC - Chemistry textbook - standard 11.
PPTX
CHROMIUM & Glucose Tolerance Factor.pptx
PPTX
Approach to a child with acute kidney injury
DOCX
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
PDF
faiz-khans about Radiotherapy Physics-02.pdf
PPTX
Power Point PR B.Inggris 12 Ed. 2019.pptx
pharmaceutics-1unit-1-221214121936-550b56aa.pptx
Chevening Scholarship Application and Interview Preparation Guide
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
Laparoscopic Imaging Systems at World Laparoscopy Hospital
GSA-Past-Papers-2010-2024-2.pdf CSS examination
African Communication Research: A review
ACFE CERTIFICATION TRAINING ON LAW.pptx
GIÁO ÁN TIẾNG ANH 7 GLOBAL SUCCESS (CẢ NĂM) THEO CÔNG VĂN 5512 (2 CỘT) NĂM HỌ...
Neurological complocations of systemic disease
Diploma pharmaceutics notes..helps diploma students
ENGlishGrade8_Quarter2_WEEK1_LESSON1.pptx
Diabetes Mellitus , types , clinical picture, investigation and managment
FAMILY PLANNING (preventative and social medicine pdf)
BSc-Zoology-02Sem-DrVijay-Comparative anatomy of vertebrates.pdf
FYJC - Chemistry textbook - standard 11.
CHROMIUM & Glucose Tolerance Factor.pptx
Approach to a child with acute kidney injury
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
faiz-khans about Radiotherapy Physics-02.pdf
Power Point PR B.Inggris 12 Ed. 2019.pptx

Pert 182

  • 1. PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi . K Abhijeet Kumar
  • 2. Project “ A project is a series of activities directed to accomplishment of a desired objective.” Plan your work first…..then work your plan
  • 3. Network analysis Introduction Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. One definition of a project: “ A project is a temporary endeavour undertaken to create a "unique" product or service”
  • 4. History Developed in 1950’s CPM by DuPont for chemical plants PERT by U.S. Navy for Polaris missile PERT was developed by the US Navy for the planning and control of the Polaris missile program and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks). CPM was developed by Du Pont and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?)
  • 5. CPM - Critical Path Method Definition: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction Single estimate of activity time Deterministic activity times USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
  • 6. PERT - Project Evaluation & Review Techniques Definition: In PERT activities are shown as a network of precedence relationships using activity-on-arrow network construction Multiple time estimates Probabilistic activity times USED IN : Project management - for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
  • 7. Originated by H.L.Gantt in 1918 Gantt chart Advantages - Gantt charts are quite commonly used. They provide an easy graphical representation of when activities (might) take place. Limitations Do not clearly indicate details regarding the progress of activities Do not give a clear indication of interrelation ship between the separate activities
  • 8. CPM/PERT These deficiencies can be eliminated to a large extent by showing the interdependence of various activities by means of connecting arrows called network technique. Overtime CPM and PERT became one technique ADVANTAGES: Precedence relationships large projects more efficient
  • 9. The Project Network Use of nodes and arrows Arrows  An arrow leads from tail to head directionally Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes  A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish.
  • 10. Activity on Node & Activity on Arrow Activity on Node - A completion of an activity is represented by a node Activity on Arrow - An arrow represents a task, while a node is the completion of a task - Arrows represent order of events
  • 11. Activity Slack Each event has two important times associated with it : Earliest time , Te , which is a calendar time when a event can occur when all the predecessor events completed at the earliest possible times Latest time , TL , which is the latest time the event can occur with out delaying the subsequent events and completion of project. Difference between the latest time and the earliest time of an event is the slack time for that event Positive slack : Slack is the amount of time an event can be delayed without delaying the project completion
  • 12. Critical Path Is that the sequence of activities and events where there is no “slack” i.e.. Zero slack Longest path through a network minimum project completion time
  • 13. Benefits of CPM/PERT Useful at many stages of project management Mathematically simple Give critical path and slack time Provide project documentation Useful in monitoring costs
  • 14. Questions Answered by CPM & PERT Completion date? On Schedule? Within Budget? Critical Activities? How can the project be finished early at the least cost?
  • 15. example Illustration of network analysis of a minor redesign of a product and its associated packaging. The key question is: How long will it take to complete this project ?
  • 16. For clarity, this list is kept to a minimum by specifying only immediate relationships, that is relationships involving activities that " occur near to each other in time".
  • 17. "What activities must be finished before this activity can start" could we complete this project in 30 weeks? could we complete this project in 2 weeks? One answer could be, if we first do activity 1, then activity 2, then activity 3, ...., then activity 10, then activity 11 and the project would then take the sum of the activity completion times, 30 weeks. “ What is the minimum possible time in which we can complete this project ? “ Before starting any of the above activity, the questions asked would be
  • 18. We shall see below how the network analysis diagram/picture we construct helps us to answer this question.
  • 19. CRITICAL PATH TAKES 24 WEEKS FOR THE COMPLETION OF THE PROJECT
  • 20. Packages are available to determine the shortest path and other relevant information.
  • 22. Output of the package
  • 23. Limitations to CPM/PERT Clearly defined, independent and stable activities Specified precedence relationships Over emphasis on critical paths