This document provides an overview of intelligent pigging and the intelligent pigging survey of a 14-inch crude oil pipeline from Barauni Pump Station to Pump Station 5 that is 756 km long. Intelligent pigging uses specially designed tools called "pigs" to inspect and clean pipelines without stopping flow. The document discusses the types of pigs used for different pipeline activities like construction, maintenance, and operation. It also summarizes the goals and activities of the survey conducted by Rosen Europe B.V. on the 14-inch pipeline, including using a corrosion detection pig (CDP) to detect metal loss and pipe wall defects.