This document summarizes the procedures for conducting a pile load test to determine the load carrying capacity of a pile. The test involves installing a test pile between two anchor piles and applying incremental loads through a hydraulic jack while monitoring settlement. Loads are applied until the pile reaches twice its safe load or a specified settlement. A load-settlement curve is plotted to determine the ultimate load and safe load based on settlement criteria. The test provides values for maximum load, permissible working load, and pile settlement under different loads.