PILE LOAD TEST
Prepared by:-
-Jay Patel(120280106037)
-Naman Kantesaria(120280106039)
-Udit Patel(1202801060)
APPLIED MECHANICS
DEPARTEMENT
OBJECTIVE
 This test is used to determine the “LOAD CARRYING
CAPACITY” of a pile.
 This test gives us the value of
-ULTIMATE LOAD VALUE
-SAFE LOAD VALUE
-SETTLEMENT UNDER DIFFERENT VALUES OF
LOADS
EQUIPMENTS
 Anchor Girder or Reaction Girders
 Hydraulic Jack
 Test Pile
 Anchor Pile
 Dial Gauges
 Reaction Truss (in case of truss loading)
IS 2911:Part 4(2013)
PROCEDURE:-
 The set-up consists of two anchor piles provided with an
anchor girder or reaction girder at their top.
 The test pile is installed between the anchor piles as like
foundation pile is installed. The test pile should be at
lest 3B or 2.5m clear from the anchor pile.
 The test is conducted after a rest period of 3 days after
the installation in sandy soils and period of one month in
silts and soft clays.
 The load is applied through a hydraulic jack resting on
the reaction girder or Truss. The measurement of pile
movement are taken with respect to a fixed reference
mark.
 The load is applied in equal increment of about 20% of
the allowable load.
By Reaction Girder or
Anchor Girder method
By Truss Loading
Method
Pile load test
 Settlement should be recorded with 3 dial gauges.
 Each stage of the loading is maintained till the rate of
movement of the pile top is not more than 0.1mm per
hour in sandy soils and 0.02mm per hour in case of
clayey soils as maximum of two hours.
 Under each load increment, settlements are observed at
0.5, 1, 2, 4, 8, 12, 16, 20, 60 minutes.
 The loading should be continued up to twice the safe
load or the load at which the total settlement reaches a
specified value.
 The load is removed in the same decrements at 1 hour
interval & the final rebound recorded 24 hours after the
entire load has been removed.
 Plot a graph of LoadSettlement and make a curve for
loading as well as unloading obtained from a pile load
test.
LOADING
UNLOADING
Calculations
 Figure shows a typical Load-Settlement curve for loading as well
as unloading from a pile load test.
 For any given load, the net pile settlement (Sn ) is given by,
Sn = St - Se
 Where ,
St = Total settlement (gross settlement)
Se = Elastic settlement (rebound)
 Now, we will draw Net LoadSettlement curve.
Fig.(A)
Fig.(B)
(2)
(1)
RESULTS
 At the ULTIMATE LOAD (Qu), the load-settlement curve
becomes either linear as curve (2)
 Or There is a sharp break as in the curve (1), as shown in
Fig.(A).
 The safe load is usually taken as one-half of the Ultimate
load.
 According to IS:2911,
1. the safe load is taken as one-half of the load at which
the total settlement is equal to 10% of the pile diameter
or
2. two-third of the final load at which the total settlement
is 12mm, whichever is less.
3. Two-third of the final load which causes a net
settlement(residual settlement after removal of load) of
6 mm.
Pile load test

More Related Content

PPTX
Pile foundation
PPTX
Pile load test ppt
PDF
Pile Foundations
PPT
Pile foundation ppt 2 (usefulsearch.org) (useful search)
PDF
Report on Pile Foundation
PPTX
Plate load test ppt
PPTX
Pile foundation
PPT
Dynamic pile testing
Pile foundation
Pile load test ppt
Pile Foundations
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Report on Pile Foundation
Plate load test ppt
Pile foundation
Dynamic pile testing

What's hot (20)

PPTX
Field compaction methods
PDF
Load carrying capacity of piles
PPTX
PDF
Stability of Slopes
PPTX
ELECTRO OSMOSIS METHOD OF DEWATERING
PPTX
Effective stress
PPTX
Earthen Dams
PPTX
Dynamic Pile Formulae
PPTX
Canal outlets and modules
PDF
Lecture 2 bearing capacity
PPTX
Grouting
PPT
SOIL EXPLORATION
PPT
Soil stabilisation (1)
PPTX
Highway drainage
PPT
Soil exploration part i
PDF
Grouting Methods
PPT
Soil penetration tests
PPTX
Design and construction of well foundations
PPTX
Field compaction methods
Load carrying capacity of piles
Stability of Slopes
ELECTRO OSMOSIS METHOD OF DEWATERING
Effective stress
Earthen Dams
Dynamic Pile Formulae
Canal outlets and modules
Lecture 2 bearing capacity
Grouting
SOIL EXPLORATION
Soil stabilisation (1)
Highway drainage
Soil exploration part i
Grouting Methods
Soil penetration tests
Design and construction of well foundations
Ad

Viewers also liked (8)

PPT
Stanamic Testing and Tons Test
PPT
Statnamic testing of soils
DOCX
Plate load test image (usefulsearch.org) (useful search)
DOC
Plate load test observation and calculation Plate load test image (usefulsear...
PPTX
Plate load test
PPTX
Plate load test and its interpretations
PPTX
Plate load test
PPTX
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
Stanamic Testing and Tons Test
Statnamic testing of soils
Plate load test image (usefulsearch.org) (useful search)
Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test
Plate load test and its interpretations
Plate load test
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
Ad

Similar to Pile load test (9)

PPTX
PILE LOAD TEST-abhishek.pptx
PDF
Methodology-of-Static-Pile-Load-Test.pdf
PPT
METHOD AND ASSESSMENT FOR LOAD TEST.ppt
PDF
publication_1580218342.pdf
PPTX
Deep Foundations
PPTX
1.Pile foundations 2021 (1).pptx
PDF
The static loading test bengt h. fellenius
DOCX
4-pile foundation.docx pile foundation.docx
PPTX
PILE FOUNDATION.pptx
PILE LOAD TEST-abhishek.pptx
Methodology-of-Static-Pile-Load-Test.pdf
METHOD AND ASSESSMENT FOR LOAD TEST.ppt
publication_1580218342.pdf
Deep Foundations
1.Pile foundations 2021 (1).pptx
The static loading test bengt h. fellenius
4-pile foundation.docx pile foundation.docx
PILE FOUNDATION.pptx

Recently uploaded (20)

PDF
electrical machines course file-anna university
PPTX
CNS - Unit 1 (Introduction To Computer Networks) - PPT (2).pptx
PPTX
BBOC407 BIOLOGY FOR ENGINEERS (CS) - MODULE 1 PART 1.pptx
PPTX
Cisco Network Behaviour dibuywvdsvdtdstydsdsa
PPTX
Micro1New.ppt.pptx the mai themes of micfrobiology
PPTX
Principal presentation for NAAC (1).pptx
PPTX
chapter 1.pptx dotnet technology introduction
PPTX
Wireless sensor networks (WSN) SRM unit 2
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PPTX
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
PPTX
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PDF
Project_Mgmt_Institute_-Marc Marc Marc .pdf
PDF
Micro 4 New.ppt.pdf a servay of cells and microorganism
PPTX
Environmental studies, Moudle 3-Environmental Pollution.pptx
PPTX
Solar energy pdf of gitam songa hemant k
PDF
Lesson 3 .pdf
PDF
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
PPTX
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
electrical machines course file-anna university
CNS - Unit 1 (Introduction To Computer Networks) - PPT (2).pptx
BBOC407 BIOLOGY FOR ENGINEERS (CS) - MODULE 1 PART 1.pptx
Cisco Network Behaviour dibuywvdsvdtdstydsdsa
Micro1New.ppt.pptx the mai themes of micfrobiology
Principal presentation for NAAC (1).pptx
chapter 1.pptx dotnet technology introduction
Wireless sensor networks (WSN) SRM unit 2
Beginners-Guide-to-Artificial-Intelligence.pdf
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
MLpara ingenieira CIVIL, meca Y AMBIENTAL
Project_Mgmt_Institute_-Marc Marc Marc .pdf
Micro 4 New.ppt.pdf a servay of cells and microorganism
Environmental studies, Moudle 3-Environmental Pollution.pptx
Solar energy pdf of gitam songa hemant k
Lesson 3 .pdf
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf

Pile load test

  • 1. PILE LOAD TEST Prepared by:- -Jay Patel(120280106037) -Naman Kantesaria(120280106039) -Udit Patel(1202801060) APPLIED MECHANICS DEPARTEMENT
  • 2. OBJECTIVE  This test is used to determine the “LOAD CARRYING CAPACITY” of a pile.  This test gives us the value of -ULTIMATE LOAD VALUE -SAFE LOAD VALUE -SETTLEMENT UNDER DIFFERENT VALUES OF LOADS
  • 3. EQUIPMENTS  Anchor Girder or Reaction Girders  Hydraulic Jack  Test Pile  Anchor Pile  Dial Gauges  Reaction Truss (in case of truss loading)
  • 4. IS 2911:Part 4(2013) PROCEDURE:-  The set-up consists of two anchor piles provided with an anchor girder or reaction girder at their top.  The test pile is installed between the anchor piles as like foundation pile is installed. The test pile should be at lest 3B or 2.5m clear from the anchor pile.  The test is conducted after a rest period of 3 days after the installation in sandy soils and period of one month in silts and soft clays.  The load is applied through a hydraulic jack resting on the reaction girder or Truss. The measurement of pile movement are taken with respect to a fixed reference mark.  The load is applied in equal increment of about 20% of the allowable load.
  • 5. By Reaction Girder or Anchor Girder method
  • 8.  Settlement should be recorded with 3 dial gauges.  Each stage of the loading is maintained till the rate of movement of the pile top is not more than 0.1mm per hour in sandy soils and 0.02mm per hour in case of clayey soils as maximum of two hours.  Under each load increment, settlements are observed at 0.5, 1, 2, 4, 8, 12, 16, 20, 60 minutes.  The loading should be continued up to twice the safe load or the load at which the total settlement reaches a specified value.  The load is removed in the same decrements at 1 hour interval & the final rebound recorded 24 hours after the entire load has been removed.  Plot a graph of LoadSettlement and make a curve for loading as well as unloading obtained from a pile load test.
  • 10. Calculations  Figure shows a typical Load-Settlement curve for loading as well as unloading from a pile load test.  For any given load, the net pile settlement (Sn ) is given by, Sn = St - Se  Where , St = Total settlement (gross settlement) Se = Elastic settlement (rebound)  Now, we will draw Net LoadSettlement curve.
  • 12. RESULTS  At the ULTIMATE LOAD (Qu), the load-settlement curve becomes either linear as curve (2)  Or There is a sharp break as in the curve (1), as shown in Fig.(A).  The safe load is usually taken as one-half of the Ultimate load.  According to IS:2911, 1. the safe load is taken as one-half of the load at which the total settlement is equal to 10% of the pile diameter or 2. two-third of the final load at which the total settlement is 12mm, whichever is less. 3. Two-third of the final load which causes a net settlement(residual settlement after removal of load) of 6 mm.