2
Most read
4
Most read
RME-085
Total Quality Management
Topic: Control charts for attributes
By:
Dr. Vinod Kumar Yadav
Department of Mechanical Engineering
G. L. Bajaj Institute of Technology and Management
Greater Noida
Email: vinod.yadav@glbitm.org
Theory of Control charts
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU
Lucknow in VIII semester 2019-20, and is not intended for wider circulation.
Control Charts for attributes
• Attribute – Quality characteristics that conform to
specifications or do not conform to specifications [1].
• Discrete data (Binary).
• Used where (i) measurements can’t be made. (ii)
Derived through judgements due to shortage of time
(Example: Accept / Reject - (Go/No Go gauges).
• Nonconformity - Departure of a quality
characteristic from its intended level – Hence,
product do not meet intended specification. Relevant
for specifications.
• Defect: Non-conformity concerned with satisfying
intended usage requirements. Relevant for usage
evaluation.
• Note: Variables can be converted into attributes – meeting the UCL/LCL
(Accept) or not meeting (Reject).
Limitations of variable control
chart:
1. Cannot be used for quality
characteristics like attributes.
2. Variables may be hundred or thousand
or even more- so, not feasible to draw
100 or 1000 X and R chart – time
consuming.
Attributes: Missing parts, incorrect color, scratches, roughness
Control
Charts
Variables
X , R etc.
Attributes
P, C etc.
Types of control charts for attributes
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU
Lucknow in VIII semester 2019-20, and is not intended for wider circulation.
1. For non-conforming units: (P charts)
• P chart – Expressed as a fraction or a
%. Used when each unit can be
considered pass or fail – no matter the
number of defects.
• P-chart shows the proportion
nonconforming in a sample or
subgroup.
• Based on the binomial distribution.
• Similar charts can be drawn for
conforming proportion.
• One more type: Number nonconforming
(np chart)
2. For non-conformities (c charts)
• c chart shows the count of
nonconformities in an inspected unit.
• u chart: Analogous to c chart: to count
nonconformities per unit [1].
• Based on the Poisson distribution.
• The c-chart allows the practitioner to
assign each sample more than one
defect.
Types of control charts for attributes
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU
Lucknow in VIII semester 2019-20, and is not intended for wider circulation.
1. For non-conforming units: (P charts)
• P chart – the proportion of the number of occurrences
of an event to the total number of occurrences.
• The fraction nonconforming is the proportion of the
number nonconforming in a sample or subgroup to the
total number in the sample or subgroup.
p =
𝒏𝒑
𝒏
Where,
p = proportion or fraction nonconforming in the sample
n = number in the sample
𝒏𝒑 = number nonconforming in the sample
P chart Versatile chart –used for one characteristics at
one time
The subgroup size of the p chart can be either
variable or constant.
Objectives of p charts:
1. Calculate average quality level for
benchmarking.
2. Help management in decision making
for quality improvement.
3. Performance evaluation of operator.
4. Identify the places where X and R
charts can be used.
P chart construction for constant subgroup size
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech
Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation.
Step-1: Choose quality characteristics:
• P charts can be used for: non-conformation of (a) a single
quality characteristic (b) A group of quality characteristics (c)
Part (d) Product (e) Group of products.
• Performance evaluation of (a) Worker (b) work place (c)
Division (d) shift (e) Plant (f) Corporation
Step-2: Selection of group size and method:
• Subgroup size - function of the nonconforming proportion.
• Example: If proportion nonconforming (p) = 0.01 and n
(subgroup size) = 100, then the average number
nonconforming, np , would be one per subgroup. This would
not make a good chart, because a large number of values posted
to the chart would be 0. If a part has a proportion
nonconforming of 0.15 and a subgroup size of 50, the average
number of nonconforming would be 7.5, which would make a
good chart. A minimum average number of nonconforming
unit size of 50 is suggested as a starting point.
Method of determining sample size [1]
n = p (1-p) 𝒁α/𝟐
𝑬
2
n = sample size
p = non-conforming proportion
𝒁α/𝟐 = Normal distribution coefficient (Z
value) for area between two tails. The area
represents the decimal equivalent of the
confidence limit.
E = maximum allowable error in the estimate of
p , which is also referred to as the desired
precision.
𝒁α/𝟐 Confidence limit (%)
1.036 70.0
1.282 80.0
1.645 90.0
1.96 95.0
2.575 99.0
3.00 99.73
Table-1
P chart construction for constant subgroup size contd.
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-
20, and is not intended for wider circulation.
Example: A gear company wants to calculate the proportion of gears that are not conforming the desired specifications.
As per previous record, the company assumes the percent nonconforming = 30%. The expected precision is 20% and a
confidence level of 99%. Determine the sample size.
Solution:
Given p = 0.3; Precision = 20%; Confidence level = 99%
E = 20% of p = 0.2*0.3 = 0.06
𝒁α/𝟐 = 2.575 (From Table 1)
n = 0.3 (1-0.3) (2.575/0.06)2 = 386.78
Hence, after 387 samples, the value of p = 0.6997. Then, the true value will be between 0.3 and 0.69 (p ± E) 99% of the
time.
n = p (1-p) 𝒁α/𝟐
𝑬
2
Step-3: Collect the data:
• P charts are effective during the starpt-up phase of a new item or process, when the process is very erratic [1].
Step-4: Calculate the trial central line and control limits.
𝑝 = Average proportion of nonconforming for many subgroups
n = number inspected in a subgroup 𝒑 =
𝒏𝒑
𝒏 UCL/LCL Ref [1]
P chart construction for constant subgroup size contd.
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-
20, and is not intended for wider circulation.
Step-5: Establish the revised central line and
control limits if the process is out of control:
• Note: only those subgroups with assignable causes are discarded.
• Then new UCL and LCL are computed
Step-6: Achieve the objective
• The last step involves action and leads to the achievement of the
objective.
Figure-1: p-chart [1]
Out of control
𝒑 =
𝒏𝒑 −𝒏𝒑𝒅
𝒏 −𝒏𝒅
Where,
𝒏𝒑 𝒅 = number nonconforming in the discarded group
𝒏 𝒅 = number inspected in the discarded subgroups
P chart construction for variable subgroup size
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider
circulation.
• p charts should be developed and used with a constant subgroup size.
• This situation is not possible when the p chart is used for 100% inspection of output that
varies from day to day.
• Data for p –chart use from sampling inspection might vary for a variety of reasons. Because
the control limits are a function of the subgroup size, n , the control limits will vary with the
subgroup size. Therefore, they need to be calculated for each.
• The procedures of data collection, trial central line and control limits, and revised central
line and control limits are the same as those for a p chart with constant subgroup size.
P chart construction for variable subgroup size (Example – Juice production plant)
Subgroup
No. of
inspections
(n)
Number
Nonconformi
ng (np)
Fraction
Nonconformin
g (p)
Limit
UCL LCL
01.01.2020 238 5 0.021 0.023 0.000
02.01.2020 140 2 0.014 0.017 0.000
03.01.2020 193 5 0.026 0.028 0.000
04.01.2020 245 4 0.016 0.018 0.000
05.01.2020 200 4 0.020 0.022 0.000
06.01.2020 216 5 0.023 0.025 0.000
07.01.2020 194 5 0.026 0.028 0.000
08.01.2020 196 4 0.020 0.023 0.000
09.01.2020 200 7 0.035 0.038 0.000
10.01.2020 201 4 0.020 0.022 0.000
11.01.2020 195 5 0.026 0.028 0.000
12.01.2020 175 4 0.023 0.025 0.000
13.01.2020 199 6 0.030 0.033 0.000
14.01.2020 200 3 0.015 0.017 0.000
15.01.2020 205 7 0.034 0.037 0.000
16.01.2020 189 4 0.021 0.023 0.000
17.01.2020 180 5 0.028 0.031 0.000
18.01.2020 185 4 0.022 0.024 0.000
19.01.2020 260 8 0.031 0.033 0.000
20.01.2020 199 6 0.030 0.033 0.000
21.01.2020 255 6 0.024 0.025 0.000
22.01.2020 245 3 0.012 0.014 0.000
23.01.2020 271 10 0.037 0.039 0.000
24.01.2020 150 5 0.033 0.037 0.000
25.01.2020 201 5 0.025 0.027 0.000
Summation 5132 126
- Sample Size – day wise inspection (25 samples from 25 days data).
- The variation in the number inspected per day can be due to -
Machines breakdown, worker unavailability or any other reason
- Lowest inspection on 02.01.2020 due to major breakdown in plant.
Highest on 23.01.2020 due to the deployment of extra labor
(overtime)
- UCL and LCL are calculated using the same procedures and formulas as
for a constant subgroup. However, because the subgroup size changes
each day, limits must be calculated for each day.
0.000
0.005
0.010
0.015
0.020
0.025
0.030
0.035
0.040
0.045
P chart for variable subgroup
Fraction Nonconforming (p) UCL LCL p bar
Date (Subgroup)
simplified
Number non-conforming chart (np chart)
- np chart is almost same as the p chart But, not used
for the same objective as p chart
- The np chart is easier for operating personnel to
understand than the p chart
- Inspected results are plotted directly on to the chart
- Applicable only to constant subgroups
- The sample size should be shown on the chart so
viewers have a reference point.
- Central line and control limits are changed by a
factor of n.
- UCL = n𝒑 𝒐 + 3 𝒏𝒑 𝒐(𝟏 − 𝒑 𝒐)
- LCL = n𝒑 𝒐 - 3 𝒏𝒑 𝒐(𝟏 − 𝒑 𝒐)
If 𝒑 𝒐 is unknown, then it is determined by collecting
data, calculating trial UCL/LCL, and obtaining the best
estimate of 𝒑 𝒐.
Example: Given : Sample size = 100 per day in a lot of
3000 𝒑 𝒐 = 0.07
Then n𝒑 𝒐 = 100 * 0.07 = 7
UCL = 7 + 3*√ (7 (1-0.07) = 14.65
LCL = 7 - 3*√ (7 (1-0.07) = - 0.6544
2
5
7
8
10
9
7
3
8 8
12
-2
0
2
4
6
8
10
12
14
16
1 2 3 4 5 6 7 8 9 10 11
np Chart
npo UCL LCL Number of nonconformity
Nonconforming
number
sample size po npo UCL LCL
2 100 0.07 7 14.65441 -0.65441
5 100 0.07 7 14.65441 -0.65441
7 100 0.07 7 14.65441 -0.65441
8 100 0.07 7 14.65441 -0.65441
10 100 0.07 7 14.65441 -0.65441
9 100 0.07 7 14.65441 -0.65441
7 100 0.07 7 14.65441 -0.65441
3 100 0.07 7 14.65441 -0.65441
8 100 0.07 7 14.65441 -0.65441
8 100 0.07 7 14.65441 -0.65441
12 100 0.07 7 14.65441 -0.65441
UCL
LCL
Non-conformities chart (c chart)
- C chart is used to count non-conformities
- U chart count of nonconformities per unit
- UCL = 𝑪 + 3 𝑪
- LCL = 𝑪 - 3 𝑪
Where,
𝑪 = 𝐂𝐞𝐧𝐭𝐫𝐚𝐥 𝐥𝐢𝐧𝐞 𝐚𝐯𝐞𝐫𝐚𝐠𝐞 𝐯𝐚𝐥𝐮𝐞
UCL
LCL
3
6
5
4
5
3
2
4 4 4
-4
-2
0
2
4
6
8
10
12
1 2 3 4 5 6 7 8 9 10
AxisTitle
Group No.
c chart
Central line (average) UCL LCL No. of defects
Group
No.
No. of
Defects
Central line
(average) UCL LCL
1 3 4 10 -2
2 6 4 10 -2
3 5 4 10 -2
4 4 4 10 -2
5 5 4 10 -2
6 3 4 10 -2
7 2 4 10 -2
8 4 4 10 -2
9 4 4 10 -2
10 4 4 10 -2
sum 40
References:
[1] Dale H. Besterfiled. A Text book on Quality Improvement. 9th Edition. Pearson (ISBN 10: 0-13-262441-9) pp: 123-148.
Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU
Lucknow in VIII semester 2019-20, and is not intended for wider circulation.
Thank you

More Related Content

PPTX
Msa attribute study
PDF
Quality management unit 2
PDF
Lean Manufacturing : Concept & Overview [email protected]
PPT
Just in time
PPT
Training - Implementing a QMS.ppt
PPTX
Quick guide to ISO9001:2015
PPTX
Enabling Proactive Quality Management Across Quality and Manufacturing
PDF
Quality control
Msa attribute study
Quality management unit 2
Lean Manufacturing : Concept & Overview [email protected]
Just in time
Training - Implementing a QMS.ppt
Quick guide to ISO9001:2015
Enabling Proactive Quality Management Across Quality and Manufacturing
Quality control

What's hot (20)

PPTX
Cost of QUALITY [QM]
PPTX
Quality Management System
PPT
Visual Factory
PPTX
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
PPT
Basic quality concepts(3)
PDF
JARO Thermal ISO9001 2015 internal auditor training 20170118
PPTX
Quality dimensions for BMS
PPTX
Tpm presentasion in marathi
PPT
Iso Process Audit Training
PPT
Agile manufacturing
PDF
Eight principle of tqm
PDF
Six Sigma Process Capability Study (PCS) Training Module
PDF
Principles of quality management system
PDF
UNIT I - QUALITY MANAGEMENT
PPT
Quality Slides
PDF
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
PDF
Six Sigma.pdf
PPTX
QMS Awareness Session
PPTX
Manufacturing systems powerpoint
Cost of QUALITY [QM]
Quality Management System
Visual Factory
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
Basic quality concepts(3)
JARO Thermal ISO9001 2015 internal auditor training 20170118
Quality dimensions for BMS
Tpm presentasion in marathi
Iso Process Audit Training
Agile manufacturing
Eight principle of tqm
Six Sigma Process Capability Study (PCS) Training Module
Principles of quality management system
UNIT I - QUALITY MANAGEMENT
Quality Slides
ISO 9001:2015 Objectives Requirements | A Practical Approach That You Can Use...
Six Sigma.pdf
QMS Awareness Session
Manufacturing systems powerpoint
Ad

Similar to RME-085 (Total Quality Management) Unit-3 _part 3 (20)

PPTX
Attribute Chart.pptx
PPTX
Chapter 3 CONTROL CHART FOR ATTRIBUTE.pptx
PPTX
Control charts for attributes
PPTX
Presentation1 quality control-1.pptx
PDF
Attributes Control Charts
PPTX
Control charts (p np c u)
PPT
Ch09_. Control Chart for Attributes.ppt
PPTX
Quality control tool afor process capabilities
PPTX
TQM bits Pilani statistical process control attributes of Control chat
PPT
Attributes.ppt
PPTX
Fractional nonconforming (p – chart)
PPT
Chapter Two - for practice.ppt statical quality
PPTX
14. Statistical Process Control.pptx
PDF
Production & Operation Management Chapter9[1]
PDF
Chapter9[1]
PDF
control Chart u np c p
PPTX
P chart & c-chart
PPT
Statistical Process Control
PPT
Statistical process control for phd students
PPTX
New Microsoft PSeven quality improvement tools. x
Attribute Chart.pptx
Chapter 3 CONTROL CHART FOR ATTRIBUTE.pptx
Control charts for attributes
Presentation1 quality control-1.pptx
Attributes Control Charts
Control charts (p np c u)
Ch09_. Control Chart for Attributes.ppt
Quality control tool afor process capabilities
TQM bits Pilani statistical process control attributes of Control chat
Attributes.ppt
Fractional nonconforming (p – chart)
Chapter Two - for practice.ppt statical quality
14. Statistical Process Control.pptx
Production & Operation Management Chapter9[1]
Chapter9[1]
control Chart u np c p
P chart & c-chart
Statistical Process Control
Statistical process control for phd students
New Microsoft PSeven quality improvement tools. x
Ad

More from ssuserf6c4bd (16)

PDF
RME-085 TQM Unit-5 part 6
PDF
RME-085 TQM Unit-5 part 5
PDF
RME-085 TQM Unit-5 part 4
PDF
RME-085 TQM Unit-5 part 3
PDF
RME-085_TQM Unit-4 Part 5
PDF
RME-085 TQM Unit-5 part 2
PPTX
RME-085 TQM Unit-5 part 2
PDF
RME-085 TQM (unit-5 part 1)
PPTX
RME-085_TQM Unit-4 Part 4
PDF
RME-085_TQM Unit-4 Part 3
PDF
RME-085_TQM_Unit-4 (Part-2)
PDF
RME-085 TQM unit-4 part 1
PPTX
RME 085 TQM unit-3 _part 5
PDF
RME 085 TQM unit-3 _part 4
PPTX
Rme 085 tqm unit-3 part 2
PPTX
RME 085 TQM
RME-085 TQM Unit-5 part 6
RME-085 TQM Unit-5 part 5
RME-085 TQM Unit-5 part 4
RME-085 TQM Unit-5 part 3
RME-085_TQM Unit-4 Part 5
RME-085 TQM Unit-5 part 2
RME-085 TQM Unit-5 part 2
RME-085 TQM (unit-5 part 1)
RME-085_TQM Unit-4 Part 4
RME-085_TQM Unit-4 Part 3
RME-085_TQM_Unit-4 (Part-2)
RME-085 TQM unit-4 part 1
RME 085 TQM unit-3 _part 5
RME 085 TQM unit-3 _part 4
Rme 085 tqm unit-3 part 2
RME 085 TQM

Recently uploaded (20)

PDF
POM_Unit1_Notes.pdf Introduction to Management #mba #bba #bcom #bballb #class...
PPTX
MMW-CHAPTER-1-final.pptx major Elementary Education
PDF
Review of Related Literature & Studies.pdf
PPTX
CHROMIUM & Glucose Tolerance Factor.pptx
PDF
faiz-khans about Radiotherapy Physics-02.pdf
PPT
hemostasis and its significance, physiology
PPTX
2025 High Blood Pressure Guideline Slide Set.pptx
PPTX
ENGlishGrade8_Quarter2_WEEK1_LESSON1.pptx
PPTX
IT infrastructure and emerging technologies
PDF
Physical pharmaceutics two in b pharmacy
PPTX
Copy of ARAL Program Primer_071725(1).pptx
PPTX
Theoretical for class.pptxgshdhddhdhdhgd
PPTX
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
PDF
GSA-Past-Papers-2010-2024-2.pdf CSS examination
PPTX
growth and developement.pptxweeeeerrgttyyy
PPTX
pharmaceutics-1unit-1-221214121936-550b56aa.pptx
PDF
WHAT NURSES SAY_ COMMUNICATION BEHAVIORS ASSOCIATED WITH THE COMP.pdf
PDF
FYJC - Chemistry textbook - standard 11.
PDF
Health aspects of bilberry: A review on its general benefits
PPTX
Approach to a child with acute kidney injury
POM_Unit1_Notes.pdf Introduction to Management #mba #bba #bcom #bballb #class...
MMW-CHAPTER-1-final.pptx major Elementary Education
Review of Related Literature & Studies.pdf
CHROMIUM & Glucose Tolerance Factor.pptx
faiz-khans about Radiotherapy Physics-02.pdf
hemostasis and its significance, physiology
2025 High Blood Pressure Guideline Slide Set.pptx
ENGlishGrade8_Quarter2_WEEK1_LESSON1.pptx
IT infrastructure and emerging technologies
Physical pharmaceutics two in b pharmacy
Copy of ARAL Program Primer_071725(1).pptx
Theoretical for class.pptxgshdhddhdhdhgd
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
GSA-Past-Papers-2010-2024-2.pdf CSS examination
growth and developement.pptxweeeeerrgttyyy
pharmaceutics-1unit-1-221214121936-550b56aa.pptx
WHAT NURSES SAY_ COMMUNICATION BEHAVIORS ASSOCIATED WITH THE COMP.pdf
FYJC - Chemistry textbook - standard 11.
Health aspects of bilberry: A review on its general benefits
Approach to a child with acute kidney injury

RME-085 (Total Quality Management) Unit-3 _part 3

  • 1. RME-085 Total Quality Management Topic: Control charts for attributes By: Dr. Vinod Kumar Yadav Department of Mechanical Engineering G. L. Bajaj Institute of Technology and Management Greater Noida Email: [email protected]
  • 2. Theory of Control charts Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation. Control Charts for attributes • Attribute – Quality characteristics that conform to specifications or do not conform to specifications [1]. • Discrete data (Binary). • Used where (i) measurements can’t be made. (ii) Derived through judgements due to shortage of time (Example: Accept / Reject - (Go/No Go gauges). • Nonconformity - Departure of a quality characteristic from its intended level – Hence, product do not meet intended specification. Relevant for specifications. • Defect: Non-conformity concerned with satisfying intended usage requirements. Relevant for usage evaluation. • Note: Variables can be converted into attributes – meeting the UCL/LCL (Accept) or not meeting (Reject). Limitations of variable control chart: 1. Cannot be used for quality characteristics like attributes. 2. Variables may be hundred or thousand or even more- so, not feasible to draw 100 or 1000 X and R chart – time consuming. Attributes: Missing parts, incorrect color, scratches, roughness Control Charts Variables X , R etc. Attributes P, C etc.
  • 3. Types of control charts for attributes Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation. 1. For non-conforming units: (P charts) • P chart – Expressed as a fraction or a %. Used when each unit can be considered pass or fail – no matter the number of defects. • P-chart shows the proportion nonconforming in a sample or subgroup. • Based on the binomial distribution. • Similar charts can be drawn for conforming proportion. • One more type: Number nonconforming (np chart) 2. For non-conformities (c charts) • c chart shows the count of nonconformities in an inspected unit. • u chart: Analogous to c chart: to count nonconformities per unit [1]. • Based on the Poisson distribution. • The c-chart allows the practitioner to assign each sample more than one defect.
  • 4. Types of control charts for attributes Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation. 1. For non-conforming units: (P charts) • P chart – the proportion of the number of occurrences of an event to the total number of occurrences. • The fraction nonconforming is the proportion of the number nonconforming in a sample or subgroup to the total number in the sample or subgroup. p = 𝒏𝒑 𝒏 Where, p = proportion or fraction nonconforming in the sample n = number in the sample 𝒏𝒑 = number nonconforming in the sample P chart Versatile chart –used for one characteristics at one time The subgroup size of the p chart can be either variable or constant. Objectives of p charts: 1. Calculate average quality level for benchmarking. 2. Help management in decision making for quality improvement. 3. Performance evaluation of operator. 4. Identify the places where X and R charts can be used.
  • 5. P chart construction for constant subgroup size Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation. Step-1: Choose quality characteristics: • P charts can be used for: non-conformation of (a) a single quality characteristic (b) A group of quality characteristics (c) Part (d) Product (e) Group of products. • Performance evaluation of (a) Worker (b) work place (c) Division (d) shift (e) Plant (f) Corporation Step-2: Selection of group size and method: • Subgroup size - function of the nonconforming proportion. • Example: If proportion nonconforming (p) = 0.01 and n (subgroup size) = 100, then the average number nonconforming, np , would be one per subgroup. This would not make a good chart, because a large number of values posted to the chart would be 0. If a part has a proportion nonconforming of 0.15 and a subgroup size of 50, the average number of nonconforming would be 7.5, which would make a good chart. A minimum average number of nonconforming unit size of 50 is suggested as a starting point. Method of determining sample size [1] n = p (1-p) 𝒁α/𝟐 𝑬 2 n = sample size p = non-conforming proportion 𝒁α/𝟐 = Normal distribution coefficient (Z value) for area between two tails. The area represents the decimal equivalent of the confidence limit. E = maximum allowable error in the estimate of p , which is also referred to as the desired precision. 𝒁α/𝟐 Confidence limit (%) 1.036 70.0 1.282 80.0 1.645 90.0 1.96 95.0 2.575 99.0 3.00 99.73 Table-1
  • 6. P chart construction for constant subgroup size contd. Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019- 20, and is not intended for wider circulation. Example: A gear company wants to calculate the proportion of gears that are not conforming the desired specifications. As per previous record, the company assumes the percent nonconforming = 30%. The expected precision is 20% and a confidence level of 99%. Determine the sample size. Solution: Given p = 0.3; Precision = 20%; Confidence level = 99% E = 20% of p = 0.2*0.3 = 0.06 𝒁α/𝟐 = 2.575 (From Table 1) n = 0.3 (1-0.3) (2.575/0.06)2 = 386.78 Hence, after 387 samples, the value of p = 0.6997. Then, the true value will be between 0.3 and 0.69 (p ± E) 99% of the time. n = p (1-p) 𝒁α/𝟐 𝑬 2 Step-3: Collect the data: • P charts are effective during the starpt-up phase of a new item or process, when the process is very erratic [1]. Step-4: Calculate the trial central line and control limits. 𝑝 = Average proportion of nonconforming for many subgroups n = number inspected in a subgroup 𝒑 = 𝒏𝒑 𝒏 UCL/LCL Ref [1]
  • 7. P chart construction for constant subgroup size contd. Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019- 20, and is not intended for wider circulation. Step-5: Establish the revised central line and control limits if the process is out of control: • Note: only those subgroups with assignable causes are discarded. • Then new UCL and LCL are computed Step-6: Achieve the objective • The last step involves action and leads to the achievement of the objective. Figure-1: p-chart [1] Out of control 𝒑 = 𝒏𝒑 −𝒏𝒑𝒅 𝒏 −𝒏𝒅 Where, 𝒏𝒑 𝒅 = number nonconforming in the discarded group 𝒏 𝒅 = number inspected in the discarded subgroups
  • 8. P chart construction for variable subgroup size Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation. • p charts should be developed and used with a constant subgroup size. • This situation is not possible when the p chart is used for 100% inspection of output that varies from day to day. • Data for p –chart use from sampling inspection might vary for a variety of reasons. Because the control limits are a function of the subgroup size, n , the control limits will vary with the subgroup size. Therefore, they need to be calculated for each. • The procedures of data collection, trial central line and control limits, and revised central line and control limits are the same as those for a p chart with constant subgroup size.
  • 9. P chart construction for variable subgroup size (Example – Juice production plant) Subgroup No. of inspections (n) Number Nonconformi ng (np) Fraction Nonconformin g (p) Limit UCL LCL 01.01.2020 238 5 0.021 0.023 0.000 02.01.2020 140 2 0.014 0.017 0.000 03.01.2020 193 5 0.026 0.028 0.000 04.01.2020 245 4 0.016 0.018 0.000 05.01.2020 200 4 0.020 0.022 0.000 06.01.2020 216 5 0.023 0.025 0.000 07.01.2020 194 5 0.026 0.028 0.000 08.01.2020 196 4 0.020 0.023 0.000 09.01.2020 200 7 0.035 0.038 0.000 10.01.2020 201 4 0.020 0.022 0.000 11.01.2020 195 5 0.026 0.028 0.000 12.01.2020 175 4 0.023 0.025 0.000 13.01.2020 199 6 0.030 0.033 0.000 14.01.2020 200 3 0.015 0.017 0.000 15.01.2020 205 7 0.034 0.037 0.000 16.01.2020 189 4 0.021 0.023 0.000 17.01.2020 180 5 0.028 0.031 0.000 18.01.2020 185 4 0.022 0.024 0.000 19.01.2020 260 8 0.031 0.033 0.000 20.01.2020 199 6 0.030 0.033 0.000 21.01.2020 255 6 0.024 0.025 0.000 22.01.2020 245 3 0.012 0.014 0.000 23.01.2020 271 10 0.037 0.039 0.000 24.01.2020 150 5 0.033 0.037 0.000 25.01.2020 201 5 0.025 0.027 0.000 Summation 5132 126 - Sample Size – day wise inspection (25 samples from 25 days data). - The variation in the number inspected per day can be due to - Machines breakdown, worker unavailability or any other reason - Lowest inspection on 02.01.2020 due to major breakdown in plant. Highest on 23.01.2020 due to the deployment of extra labor (overtime) - UCL and LCL are calculated using the same procedures and formulas as for a constant subgroup. However, because the subgroup size changes each day, limits must be calculated for each day. 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 P chart for variable subgroup Fraction Nonconforming (p) UCL LCL p bar Date (Subgroup) simplified
  • 10. Number non-conforming chart (np chart) - np chart is almost same as the p chart But, not used for the same objective as p chart - The np chart is easier for operating personnel to understand than the p chart - Inspected results are plotted directly on to the chart - Applicable only to constant subgroups - The sample size should be shown on the chart so viewers have a reference point. - Central line and control limits are changed by a factor of n. - UCL = n𝒑 𝒐 + 3 𝒏𝒑 𝒐(𝟏 − 𝒑 𝒐) - LCL = n𝒑 𝒐 - 3 𝒏𝒑 𝒐(𝟏 − 𝒑 𝒐) If 𝒑 𝒐 is unknown, then it is determined by collecting data, calculating trial UCL/LCL, and obtaining the best estimate of 𝒑 𝒐. Example: Given : Sample size = 100 per day in a lot of 3000 𝒑 𝒐 = 0.07 Then n𝒑 𝒐 = 100 * 0.07 = 7 UCL = 7 + 3*√ (7 (1-0.07) = 14.65 LCL = 7 - 3*√ (7 (1-0.07) = - 0.6544 2 5 7 8 10 9 7 3 8 8 12 -2 0 2 4 6 8 10 12 14 16 1 2 3 4 5 6 7 8 9 10 11 np Chart npo UCL LCL Number of nonconformity Nonconforming number sample size po npo UCL LCL 2 100 0.07 7 14.65441 -0.65441 5 100 0.07 7 14.65441 -0.65441 7 100 0.07 7 14.65441 -0.65441 8 100 0.07 7 14.65441 -0.65441 10 100 0.07 7 14.65441 -0.65441 9 100 0.07 7 14.65441 -0.65441 7 100 0.07 7 14.65441 -0.65441 3 100 0.07 7 14.65441 -0.65441 8 100 0.07 7 14.65441 -0.65441 8 100 0.07 7 14.65441 -0.65441 12 100 0.07 7 14.65441 -0.65441 UCL LCL
  • 11. Non-conformities chart (c chart) - C chart is used to count non-conformities - U chart count of nonconformities per unit - UCL = 𝑪 + 3 𝑪 - LCL = 𝑪 - 3 𝑪 Where, 𝑪 = 𝐂𝐞𝐧𝐭𝐫𝐚𝐥 𝐥𝐢𝐧𝐞 𝐚𝐯𝐞𝐫𝐚𝐠𝐞 𝐯𝐚𝐥𝐮𝐞 UCL LCL 3 6 5 4 5 3 2 4 4 4 -4 -2 0 2 4 6 8 10 12 1 2 3 4 5 6 7 8 9 10 AxisTitle Group No. c chart Central line (average) UCL LCL No. of defects Group No. No. of Defects Central line (average) UCL LCL 1 3 4 10 -2 2 6 4 10 -2 3 5 4 10 -2 4 4 4 10 -2 5 5 4 10 -2 6 3 4 10 -2 7 2 4 10 -2 8 4 4 10 -2 9 4 4 10 -2 10 4 4 10 -2 sum 40
  • 12. References: [1] Dale H. Besterfiled. A Text book on Quality Improvement. 9th Edition. Pearson (ISBN 10: 0-13-262441-9) pp: 123-148. Note: The contents used in this slide is being used for academic purposes only, and is intended only for students registered in B.Tech Mechanical Engineering at AKTU Lucknow in VIII semester 2019-20, and is not intended for wider circulation.