A
Presentation on
MS Project
Conart Engineers Limited
Introduction
• Microsoft Project is a project management software
developed and sold by Microsoft
• Design to assist project managers in developing
plans, assigning resources to task, tracking progress,
managing budgets and analyzing workloads,
• The application creates critical path schedules, and
critical chain which can be visualized in a Gantt chart.
• Available currently in two editions, Standard and
Professional.
• MS Project’s proprietary file format is *.mpp
Conart Engineers Limited
Scheduling Software Commonly Used
• Gantt Project
• Genius inside
• Liquid planner
• Micro planner X-pert
• Naval plan
• Open project
• Open workbench
• Primavera 3.1 / 6.2
• Project. Net
Conart Engineers Limited
Project Manager
Responsible for:
• Work
• Quality
• Human Resource
• Time
• Communications
• Costs
Conart Engineers Limited
Basic Settings of MS project
Conart Engineers Limited
Basic setting A: Create a new project plan
• On the file menu, click on new.
• Under new click on blank project.
• Project 2003 create a New Project, and the New
Project task pane is replaced by the task panes of the
project guide
Conart Engineers Limited
Conart Engineers Limited
Basic setting B: Create a Calendar for a task
•By default, tasks are scheduled based on the project
calendar.
•To define unique or specific exceptions, such as
machinery that runs during nonworking time, or an
office move that can occur only on a weekend, you can
create a task calendar for individual tasks that override
the project calendar.
Conart Engineers Limited
Using MS Project
Project
Management
Planning
task
Build the
plan
Set the project
start date
Enter task, name &
duration
Link task
fine tune the
plan
Monitoring &
Tracking task
Set a base
line
Enter actual
Track variables
Adjustschedules
Communicate
with team
Conart Engineers Limited
CRITICAL PATH
The sequence of the activities which have no float or
slack is called critical path.
Slack= Late start – Early start OR Late finish – Early
finish
• Add up to the longest overall duration. T
• Is the shortest time possible to complete the project.
Any Delay of an activity on the critical path directly
imparts the planned project completed date.
Conart Engineers Limited
TIME-COST TRADE-OFFS: CRASHING
• When they an activity will take a certain no. of days or weeks
what we really mean is this activity normally takes this many
days or weeks. We could make it take less time, but to do so
would cost more money.
Crashing is the process of expediting project schedule by
compressing the total project duration
• Key is attain maximum decrease in the schedule time with
minimum cost.
• More resources are needed to speed up a part of project.
• Depends on what slack is available in a non critical activity.
Conart Engineers Limited
Conart Engineers Limited
Other Settings of MS Project
Conart Engineers Limited
Conart Engineers Limited
Constraints type and
description
Description
As soon as possible This is default setting based. Start the task ASAP based upon the other
constraints & relationship. Do not enter a date for this constraint.
As late as possible Start the task as late as possible based upon the other constraints &
relationship. Used when scheduling a project from the project finish
date. Do not enter date for this constraint.
Finish no earlier than Finish the task on or after the date you specify.
Start no earlier than Start the task on or after the date you specify.
Finish no later than Finish the task on or before the date you specify.
Start no later than Start the task on or before the date you specify.
Must finish on Finish the task on specified date.
Must start on Start the task on specified date.
Other Settings A – SCHEDULING A TASK
Other Setting – B: DEPENDENCY – Finish to
Start
• Task 1 must finish before Task 2 can start. This is the By Default Dependency
created and very commonly used Relationship in Project.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Start to Start
• Task 1 and Task 2 must start at the same time.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Finish
to Finish
• Task 1 and Task 2 must finish at the same time.
• FF dependencies also reduce the overall amount of time in
Project, same as SS Dependency.
• If Task 1 will take 5 days to complete, and Task 2 will take 3
days to complete, with FS dependency the overall duration of
the two tasks is 8 days.
• If we set an FF dependency, the overall duration of the two
tasks is only 5 days.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Start to Start
• Task 2 cannot finish until the start of Task 1.This is
VERY RARE scenario of Task in any type of Project.
Conart Engineers Limited
Other Setting – C: UNLINKING
To unlink tasks:
• Using the Control key, select the tasks to unlink.
• Click the Unlink icon located on the ribbon menu.
Conart Engineers Limited
Other Setting – E: Activity Type: Milestone,
Flag, Bar
• When u enter a task or import a no. of task, they have
duration of 1 day as default
• To create a milestone select the task considered as milestone
and then right click. Select Task information. Put a check mark
on Milestone
• To create subtask, select the task considered & then select
Project/Outline/indent in the menu
• Link the selected task by selecting Edit/link task in the menu
Conart Engineers Limited
Conart Engineers Limited
Other Setting – G: Page set up
• Select file, page set up in the Menu bar.
• The “ Page set-up” dialog Box will appear showing
Paper sizes and other choices
• Customize the printed output By inserting additional
info Into the “Header” and
“ Footer”
Conart Engineers Limited
Conart Engineers Limited
Action Reflection
Conart Engineers Limited

More Related Content

PDF
Ms project lectures
PPT
Software project-scheduling
PPTX
00 Introduction of project scheduling
PPT
Unit2 scheduling wbs_network
PPTX
Project management with ms project 2007
PPT
PROJECT SCHEDULING
PPTX
Project scheduling
PPTX
PROJECT SCHEDULE
Ms project lectures
Software project-scheduling
00 Introduction of project scheduling
Unit2 scheduling wbs_network
Project management with ms project 2007
PROJECT SCHEDULING
Project scheduling
PROJECT SCHEDULE

What's hot (20)

PPTX
Successful Project Managers Use These 5 Ways to Represent Project Schedule
PPTX
Microsoft Office Project 2007 Tutorial
PPTX
Msp presentation
PPT
Project Management focused on Scheduling of a Project
PPTX
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
PDF
Oracle Primavera Team member 8.3
PPT
Unit2 scheduling wbs_network Management
PDF
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
PPT
Graphical Indicators in MS Project
PPTX
How Project Network Diagram's Can Help You Become A Better Project Manager
PPTX
Ms project training ppt
PDF
Ms Project Workshop
PPTX
Ms project 2016 overview
PPTX
tcc primavera
PPTX
Seven Basic Steps to Build Realistic Schedule in Project 2010
DOC
Work BreakDown Structure
PDF
Schedule Updates
PDF
Project Closure Activities In Project Management PowerPoint Presentation Slides
PPTX
44259126 ms-project-presentation
PDF
Ms project 2010 level 1&2
Successful Project Managers Use These 5 Ways to Represent Project Schedule
Microsoft Office Project 2007 Tutorial
Msp presentation
Project Management focused on Scheduling of a Project
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
Oracle Primavera Team member 8.3
Unit2 scheduling wbs_network Management
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Graphical Indicators in MS Project
How Project Network Diagram's Can Help You Become A Better Project Manager
Ms project training ppt
Ms Project Workshop
Ms project 2016 overview
tcc primavera
Seven Basic Steps to Build Realistic Schedule in Project 2010
Work BreakDown Structure
Schedule Updates
Project Closure Activities In Project Management PowerPoint Presentation Slides
44259126 ms-project-presentation
Ms project 2010 level 1&2
Ad

Viewers also liked (19)

PDF
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
PDF
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
PPTX
Presentation2
PPT
AAS NGO - Bird's Eye View
PPTX
ARTICLE
PDF
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
PDF
Depresion4
PDF
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
PPTX
Proses laktasi dan menyusui,ppt
DOC
Proyecto esperanza y edith
DOCX
Las TIC en la aula de clase
PPTX
PDF
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUAL
DOC
Ds 160 client form
DOCX
Clinical Dental Research Paper
PPTX
ARTICLE
PDF
CALIFORNIA BROCHURE ESTELLE
PPTX
ARTICLE
PPT
K3 and Patient Safety "Penanganan limbah di laboratorium"
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
Presentation2
AAS NGO - Bird's Eye View
ARTICLE
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
Depresion4
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
Proses laktasi dan menyusui,ppt
Proyecto esperanza y edith
Las TIC en la aula de clase
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUAL
Ds 160 client form
Clinical Dental Research Paper
ARTICLE
CALIFORNIA BROCHURE ESTELLE
ARTICLE
K3 and Patient Safety "Penanganan limbah di laboratorium"
Ad

Similar to Scheduling MS project 09.13.rev 1 (20)

PPTX
Introduction to Microsoft Project 2010
PPTX
Microsoft Project Foundations Course.pptx
PDF
Project 2007 full handout
DOC
2007 MS Project Training Instructors Manual (sample)
PPS
MS Project Svcs Productivity
PPTX
Ms project presentation
PPTX
Project management software
PPTX
MICROSOFT PROJECT
PPTX
dokumen.tips_ms-project-presentation.pptx
PPTX
ms-project-presentation.pptx
PDF
class-notes-5-tutorial-ms-project-28042025-101858am.pdf
PPTX
MS Project Presentation
PPT
PRJ101xl Project Libre Basic Training
PPTX
07 Fine-tuning Task Details
PPT
Ms Project 2007(Basic)
PPTX
02 Creating A Task List
PDF
How Does MS Project Works 6- Task Controlling Factors
DOCX
Microsoft® Project Painting Exercise CPMGT303 Version 111
DOCX
Microsoft® project painting exercise cpmgt303 version 111
PDF
Ms.project brochure
Introduction to Microsoft Project 2010
Microsoft Project Foundations Course.pptx
Project 2007 full handout
2007 MS Project Training Instructors Manual (sample)
MS Project Svcs Productivity
Ms project presentation
Project management software
MICROSOFT PROJECT
dokumen.tips_ms-project-presentation.pptx
ms-project-presentation.pptx
class-notes-5-tutorial-ms-project-28042025-101858am.pdf
MS Project Presentation
PRJ101xl Project Libre Basic Training
07 Fine-tuning Task Details
Ms Project 2007(Basic)
02 Creating A Task List
How Does MS Project Works 6- Task Controlling Factors
Microsoft® Project Painting Exercise CPMGT303 Version 111
Microsoft® project painting exercise cpmgt303 version 111
Ms.project brochure

Scheduling MS project 09.13.rev 1

  • 2. Introduction • Microsoft Project is a project management software developed and sold by Microsoft • Design to assist project managers in developing plans, assigning resources to task, tracking progress, managing budgets and analyzing workloads, • The application creates critical path schedules, and critical chain which can be visualized in a Gantt chart. • Available currently in two editions, Standard and Professional. • MS Project’s proprietary file format is *.mpp Conart Engineers Limited
  • 3. Scheduling Software Commonly Used • Gantt Project • Genius inside • Liquid planner • Micro planner X-pert • Naval plan • Open project • Open workbench • Primavera 3.1 / 6.2 • Project. Net Conart Engineers Limited
  • 4. Project Manager Responsible for: • Work • Quality • Human Resource • Time • Communications • Costs Conart Engineers Limited
  • 5. Basic Settings of MS project Conart Engineers Limited
  • 6. Basic setting A: Create a new project plan • On the file menu, click on new. • Under new click on blank project. • Project 2003 create a New Project, and the New Project task pane is replaced by the task panes of the project guide Conart Engineers Limited
  • 8. Basic setting B: Create a Calendar for a task •By default, tasks are scheduled based on the project calendar. •To define unique or specific exceptions, such as machinery that runs during nonworking time, or an office move that can occur only on a weekend, you can create a task calendar for individual tasks that override the project calendar. Conart Engineers Limited
  • 9. Using MS Project Project Management Planning task Build the plan Set the project start date Enter task, name & duration Link task fine tune the plan Monitoring & Tracking task Set a base line Enter actual Track variables Adjustschedules Communicate with team Conart Engineers Limited
  • 10. CRITICAL PATH The sequence of the activities which have no float or slack is called critical path. Slack= Late start – Early start OR Late finish – Early finish • Add up to the longest overall duration. T • Is the shortest time possible to complete the project. Any Delay of an activity on the critical path directly imparts the planned project completed date. Conart Engineers Limited
  • 11. TIME-COST TRADE-OFFS: CRASHING • When they an activity will take a certain no. of days or weeks what we really mean is this activity normally takes this many days or weeks. We could make it take less time, but to do so would cost more money. Crashing is the process of expediting project schedule by compressing the total project duration • Key is attain maximum decrease in the schedule time with minimum cost. • More resources are needed to speed up a part of project. • Depends on what slack is available in a non critical activity. Conart Engineers Limited
  • 13. Other Settings of MS Project Conart Engineers Limited
  • 14. Conart Engineers Limited Constraints type and description Description As soon as possible This is default setting based. Start the task ASAP based upon the other constraints & relationship. Do not enter a date for this constraint. As late as possible Start the task as late as possible based upon the other constraints & relationship. Used when scheduling a project from the project finish date. Do not enter date for this constraint. Finish no earlier than Finish the task on or after the date you specify. Start no earlier than Start the task on or after the date you specify. Finish no later than Finish the task on or before the date you specify. Start no later than Start the task on or before the date you specify. Must finish on Finish the task on specified date. Must start on Start the task on specified date. Other Settings A – SCHEDULING A TASK
  • 15. Other Setting – B: DEPENDENCY – Finish to Start • Task 1 must finish before Task 2 can start. This is the By Default Dependency created and very commonly used Relationship in Project. Conart Engineers Limited
  • 16. Other Setting – B: DEPENDENCY – Start to Start • Task 1 and Task 2 must start at the same time. Conart Engineers Limited
  • 17. Other Setting – B: DEPENDENCY – Finish to Finish • Task 1 and Task 2 must finish at the same time. • FF dependencies also reduce the overall amount of time in Project, same as SS Dependency. • If Task 1 will take 5 days to complete, and Task 2 will take 3 days to complete, with FS dependency the overall duration of the two tasks is 8 days. • If we set an FF dependency, the overall duration of the two tasks is only 5 days. Conart Engineers Limited
  • 18. Other Setting – B: DEPENDENCY – Start to Start • Task 2 cannot finish until the start of Task 1.This is VERY RARE scenario of Task in any type of Project. Conart Engineers Limited
  • 19. Other Setting – C: UNLINKING To unlink tasks: • Using the Control key, select the tasks to unlink. • Click the Unlink icon located on the ribbon menu. Conart Engineers Limited
  • 20. Other Setting – E: Activity Type: Milestone, Flag, Bar • When u enter a task or import a no. of task, they have duration of 1 day as default • To create a milestone select the task considered as milestone and then right click. Select Task information. Put a check mark on Milestone • To create subtask, select the task considered & then select Project/Outline/indent in the menu • Link the selected task by selecting Edit/link task in the menu Conart Engineers Limited
  • 22. Other Setting – G: Page set up • Select file, page set up in the Menu bar. • The “ Page set-up” dialog Box will appear showing Paper sizes and other choices • Customize the printed output By inserting additional info Into the “Header” and “ Footer” Conart Engineers Limited