Introduction
• Before I start project scheduling I will summarize
shortly what is project and project management.
• Project-Planned set of interrelated tasks to be
executed over a fixed period and within certain
cost and other limitations.
• Construction project
• Project management-Project management is the
application of processes, methods, knowledge,
skills and experience to achieve the project
objectives.
– Buying clothes
Planning-overview
• Making decisions with the objective of
influencing the future.
• What tasks will be performed?
• How tasks will be performed?
• Who will perform the tasks?
• Its an ‘ART’ form based on experience and
knowledge.
scheduling
• Determination of timing of events in the
Project.
• When tasks will be performed?
• In what sequence the tasks will be performed?
• Reflection of plan.
• Its like ‘SCIENCE’.
• Formalized method of managing time and
resources.
Why do we schedule?
• Better manage the project.
• Control change.
• Satisfy customer or contractual requirements.
• Monitor and measure progress against goals
What do you schedule?
• Milestones- it’s a reference point that marks a
major event or a branching decision point
within a project.
• Activities required by contract or customer.
• Activities critical to the performance of the
project.
• Changes to the original plan.
When do you schedule?
• Prior to, or at the beginning of a project. This
schedule is referred to as the “baseline”.
• At periodic intervals during the project. This is
commonly referred to “updating”.
• If there are changes in the scope of the
project.
• If the project is substantially behind or ahead
of the baseline.
Questions the Scheduler Asks
• What tasks will be performed? (Scope)
• How will the tasks be performed? (Execution Plan)
• What is the sequence in which the tasks will be
performed?(Execution Plan & Resources)
• Who will perform the tasks? (Resources & Execution Plan)
• Where is the equipment list, is there any exotic material
used? (Scope & Execution Plan)
• How many s/c’s do we plan to use? (Execution Plan &
Resources)
• What Permits are required and who is responsible for
them? (Scope & Execution Plan)
• Where is the Project to be executed? (Scope, Execution
Plan & Resources)
Terms used in scheduling
• Activity (Schedule or Task).
• Duration.
• Predecessor & successor.
• Relationship
– Finish to Start ‐ FS-the start of the next activity is
dependent upon the completion of the previous
activity.
• E.g.: on a construction project, you can’t pour the concrete
until the reinforcing steel is in place.
– Start to Start ‐ SS
– Finish to Finish ‐ FF
– Start to Finish ‐ SF
• Bar Chart (Gantt)- Graphical representation of
a group of activities making up a project,
represented by bars along the horizontal time
axis. Shows duration and planned sequence of
activities.
• Critical Path - The path or paths which are the
series of activities having zero float and must
be completed on their scheduled dates.
• Milestone-A point in time that signifies either
the beginning or the end of a series of related
activities.
• Float- amount of time that a task in a project
can be delayed without causing a delay to
subsequent tasks.
• Resource-Anything needed to complete an
activity: labor, materials, equipment, design,
etc.
• Work breakdown Structure (WBS) - organizes
the team's work into smaller manageable
sections.
Steps in creating a project schedule
• Activity Definition.
• Activity Sequencing- relationship
• Estimating Activity Duration
• Schedule Development.
• Schedule Control.(monitor and control)
Hierarchy of Schedules
• Milestone Summary Schedule – Level 1
• Project Intermediate Schedules – Level 2
• Details – Level 3 and 4 -working schedule
Scheduling software
• Microsoft project
• Primavera p6
• ZOHO projects
• Fastrack schedule9
• Workfront
There are so much jobs out there as a project
scheduler.
Scheduling of a project
Scheduling of a project

More Related Content

PPTX
Project Schedule Management - PMBOK6
PPT
Project time management
PDF
PMP Lecture 3: Project Management Processes
PPTX
Project time management
PPTX
Lec 03 project life cycle
PPTX
PROJECT-SCHEDULING-pptx.pptx
PPTX
Project management
PDF
PMP_Project Cost Management
Project Schedule Management - PMBOK6
Project time management
PMP Lecture 3: Project Management Processes
Project time management
Lec 03 project life cycle
PROJECT-SCHEDULING-pptx.pptx
Project management
PMP_Project Cost Management

What's hot (20)

PPTX
Work breakdown structure ppt
PPT
09. Project Cost Management
PDF
Project Management
PDF
Project scheduling and resource levelling_Construction Management
PPTX
Time Cost Trade Off
PPTX
Project Management Knowledge Areas
PPTX
5 phases of project management
PPTX
Project cost & control
PPTX
Project Cost Management - PMBOK6
PPTX
Role and Responsibilities of Project Manager
PPT
Module :-5 project scheduling and resource levelling
DOCX
Procurement Methods
PPTX
Construction Project Management
PPT
Fast Tracking a Project and Project Crashing.ppt
PPTX
BIDDING-TENDER-CONTRACT
PPTX
Construction Management Introduction ppt
PDF
Delay analysis ... wise after the event.
PDF
Project cost management
PPTX
Construction claims, disputes and project closure
PDF
construction project planing
Work breakdown structure ppt
09. Project Cost Management
Project Management
Project scheduling and resource levelling_Construction Management
Time Cost Trade Off
Project Management Knowledge Areas
5 phases of project management
Project cost & control
Project Cost Management - PMBOK6
Role and Responsibilities of Project Manager
Module :-5 project scheduling and resource levelling
Procurement Methods
Construction Project Management
Fast Tracking a Project and Project Crashing.ppt
BIDDING-TENDER-CONTRACT
Construction Management Introduction ppt
Delay analysis ... wise after the event.
Project cost management
Construction claims, disputes and project closure
construction project planing
Ad

Similar to Scheduling of a project (20)

PPTX
Unit II.pptx
PPTX
Network Analysis- CPM ppt..pptx
PPT
4.1 Scheduling.ppt
PDF
Project_Planning_and_Scheduling_1742364195.pdf
PPT
Fundamentals of scheduling
PPTX
pm--basic.pptx
PPTX
project management and planning the projects
PPTX
10 me667 chap4 project scheduling
PPTX
AWIN presentation it's only logical-a scheduling overview
PPTX
Parthiv_Scheduling_Presentation_One.pptx
PPTX
KHURAIS WELLS TIE-IN PROJECT ppt. fir yoir use
PDF
Avoiding unrealistic schedules
PPTX
Building a-project-schedule
PPTX
PMNM101 Lesson 2 2022.pptx
PPTX
Project Sheduling.pptx
PPTX
PMP-Schedule Management area
PPTX
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
DOCX
Pm chapter 5
DOCX
Pm chapter 5
PPTX
Management and development PM 216 2.pptx
Unit II.pptx
Network Analysis- CPM ppt..pptx
4.1 Scheduling.ppt
Project_Planning_and_Scheduling_1742364195.pdf
Fundamentals of scheduling
pm--basic.pptx
project management and planning the projects
10 me667 chap4 project scheduling
AWIN presentation it's only logical-a scheduling overview
Parthiv_Scheduling_Presentation_One.pptx
KHURAIS WELLS TIE-IN PROJECT ppt. fir yoir use
Avoiding unrealistic schedules
Building a-project-schedule
PMNM101 Lesson 2 2022.pptx
Project Sheduling.pptx
PMP-Schedule Management area
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
Pm chapter 5
Pm chapter 5
Management and development PM 216 2.pptx
Ad

More from Sailish Cephas (6)

PPTX
BIM (Building Information Modeling) for digital construction
PDF
Sagarmala
PDF
Usage of waste plastic materials in road construction
PPTX
Solid waste treatment by composting
PDF
Effect of expansive soils on buildings and its prevention
PDF
Transportation problem with relevance to indian cities
BIM (Building Information Modeling) for digital construction
Sagarmala
Usage of waste plastic materials in road construction
Solid waste treatment by composting
Effect of expansive soils on buildings and its prevention
Transportation problem with relevance to indian cities

Recently uploaded (20)

PPTX
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
PDF
GSA-Past-Papers-2010-2024-2.pdf CSS examination
DOCX
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
PDF
Kalaari-SaaS-Founder-Playbook-2024-Edition-.pdf
PPTX
operating_systems_presentations_delhi_nc
PPTX
Cite It Right: A Compact Illustration of APA 7th Edition.pptx
PDF
English 2nd semesteNotesh biology biopsy results from the other day and I jus...
DOCX
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
PDF
Physical pharmaceutics two in b pharmacy
PDF
Laparoscopic Imaging Systems at World Laparoscopy Hospital
PPTX
CHROMIUM & Glucose Tolerance Factor.pptx
PDF
African Communication Research: A review
PDF
WHAT NURSES SAY_ COMMUNICATION BEHAVIORS ASSOCIATED WITH THE COMP.pdf
PDF
CHALLENGES FACED BY TEACHERS WHEN TEACHING LEARNERS WITH DEVELOPMENTAL DISABI...
PDF
Horaris_Grups_25-26_Definitiu_15_07_25.pdf
PPTX
climate change of delhi impacts on climate and there effects
PDF
Unleashing the Potential of the Cultural and creative industries
PDF
FAMILY PLANNING (preventative and social medicine pdf)
PDF
Health aspects of bilberry: A review on its general benefits
PDF
LATAM’s Top EdTech Innovators Transforming Learning in 2025.pdf
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
GSA-Past-Papers-2010-2024-2.pdf CSS examination
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
Kalaari-SaaS-Founder-Playbook-2024-Edition-.pdf
operating_systems_presentations_delhi_nc
Cite It Right: A Compact Illustration of APA 7th Edition.pptx
English 2nd semesteNotesh biology biopsy results from the other day and I jus...
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
Physical pharmaceutics two in b pharmacy
Laparoscopic Imaging Systems at World Laparoscopy Hospital
CHROMIUM & Glucose Tolerance Factor.pptx
African Communication Research: A review
WHAT NURSES SAY_ COMMUNICATION BEHAVIORS ASSOCIATED WITH THE COMP.pdf
CHALLENGES FACED BY TEACHERS WHEN TEACHING LEARNERS WITH DEVELOPMENTAL DISABI...
Horaris_Grups_25-26_Definitiu_15_07_25.pdf
climate change of delhi impacts on climate and there effects
Unleashing the Potential of the Cultural and creative industries
FAMILY PLANNING (preventative and social medicine pdf)
Health aspects of bilberry: A review on its general benefits
LATAM’s Top EdTech Innovators Transforming Learning in 2025.pdf

Scheduling of a project

  • 1. SCHEDULING OF A PROJECT SAILISH CEPHAS E 17MK09 M.E. INFRASTRUCTURE ENGINEERING PSG COLLEGE OF TECHNOLOGY COIMBATORE
  • 2. Contents • Introduction • Planning-overview • Scheduling • Why do we schedule? • When do we schedule? • What do we schedule? • Questions the scheduler asks • Terms used in scheduling • Steps in creating a project schedule • Hierarchy of schedules • Scheduling software
  • 3. Introduction • Before I start project scheduling I will summarize shortly what is project and project management. • Project-Planned set of interrelated tasks to be executed over a fixed period and within certain cost and other limitations. • Construction project • Project management-Project management is the application of processes, methods, knowledge, skills and experience to achieve the project objectives. – Buying clothes
  • 4. Planning-overview • Making decisions with the objective of influencing the future. • What tasks will be performed? • How tasks will be performed? • Who will perform the tasks? • Its an ‘ART’ form based on experience and knowledge.
  • 5. scheduling • Determination of timing of events in the Project. • When tasks will be performed? • In what sequence the tasks will be performed? • Reflection of plan. • Its like ‘SCIENCE’. • Formalized method of managing time and resources.
  • 6. Why do we schedule? • Better manage the project. • Control change. • Satisfy customer or contractual requirements. • Monitor and measure progress against goals
  • 7. What do you schedule? • Milestones- it’s a reference point that marks a major event or a branching decision point within a project. • Activities required by contract or customer. • Activities critical to the performance of the project. • Changes to the original plan.
  • 8. When do you schedule? • Prior to, or at the beginning of a project. This schedule is referred to as the “baseline”. • At periodic intervals during the project. This is commonly referred to “updating”. • If there are changes in the scope of the project. • If the project is substantially behind or ahead of the baseline.
  • 9. Questions the Scheduler Asks • What tasks will be performed? (Scope) • How will the tasks be performed? (Execution Plan) • What is the sequence in which the tasks will be performed?(Execution Plan & Resources) • Who will perform the tasks? (Resources & Execution Plan) • Where is the equipment list, is there any exotic material used? (Scope & Execution Plan) • How many s/c’s do we plan to use? (Execution Plan & Resources) • What Permits are required and who is responsible for them? (Scope & Execution Plan) • Where is the Project to be executed? (Scope, Execution Plan & Resources)
  • 10. Terms used in scheduling • Activity (Schedule or Task). • Duration. • Predecessor & successor. • Relationship – Finish to Start ‐ FS-the start of the next activity is dependent upon the completion of the previous activity. • E.g.: on a construction project, you can’t pour the concrete until the reinforcing steel is in place. – Start to Start ‐ SS – Finish to Finish ‐ FF – Start to Finish ‐ SF
  • 11. • Bar Chart (Gantt)- Graphical representation of a group of activities making up a project, represented by bars along the horizontal time axis. Shows duration and planned sequence of activities.
  • 12. • Critical Path - The path or paths which are the series of activities having zero float and must be completed on their scheduled dates. • Milestone-A point in time that signifies either the beginning or the end of a series of related activities. • Float- amount of time that a task in a project can be delayed without causing a delay to subsequent tasks. • Resource-Anything needed to complete an activity: labor, materials, equipment, design, etc.
  • 13. • Work breakdown Structure (WBS) - organizes the team's work into smaller manageable sections.
  • 14. Steps in creating a project schedule • Activity Definition. • Activity Sequencing- relationship • Estimating Activity Duration • Schedule Development. • Schedule Control.(monitor and control)
  • 15. Hierarchy of Schedules • Milestone Summary Schedule – Level 1 • Project Intermediate Schedules – Level 2 • Details – Level 3 and 4 -working schedule
  • 16. Scheduling software • Microsoft project • Primavera p6 • ZOHO projects • Fastrack schedule9 • Workfront There are so much jobs out there as a project scheduler.