SlideShare a Scribd company logo
PROCESSING OF TENDERSPROCESSING OF TENDERS
ANDAND
CVC GUIDELINESCVC GUIDELINES
Kashi Nath Jha
Dir., NICF
WHY
TENDERING ????
Fundamental Principle of PublicFundamental Principle of Public
buyingbuying
(A)Procurement of goods in Public
Interest –
i.Efficiency,
ii.Economy,
iii.Transparency
(B) Fair & Equitable treatment of suppliers
(C)Promotion of Competition
PUBLICPUBLIC PROCUREMENT :PROCUREMENT :
YARDSTICKSYARDSTICKS
Specifications in terms of quality
Need based procurement (avoid
excess)
Fair, Reasonable & Transparent
procedure
Procurement Vs Requirement
Reasonableness of Rate
Each stage of procurement should be
recorded
GFR: Rule 145GFR: Rule 145
Purchase of goods without quotation
 Value upto 15000/-
 Each occasion
 Certificate to be recorded by the competent
Authority –
“I,------ am personally satisfied that these goods
purchased are of the requisite quality and
specification and have been purchased from a
reliable supplier at a reasonable price.”
GFR: Rule 146GFR: Rule 146
Purchase of goods by
Purchase Committee
>15000/- and upto 1Lac on each occasion
Three members Committee as decided by the
HoD
Committee’s responsibilities
a)Market Survey
b)Reasonableness of Rates
c)Quality & Specifications
d)Identify appropriate supplier
Joint Certificate by the Committee
Purchase of goods by obtainingPurchase of goods by obtaining
bids(Tendering)bids(Tendering)
Ministry / Departments of Govt. of India
have been delegated full powers to make
their own arrangements for procurement
of goods
Rule 141 of GFR says about Central
Purchase Organisation (e.g. DGS&D) RATE
CONTRACT
Types of TenderTypes of Tender
In broader terms there are three
types of tender : -
A.Open Tender
B.Limited Tender
C.Single Tender
Method of obtaining bid :Method of obtaining bid :
Advertised Tender Enquiry (open )Advertised Tender Enquiry (open )
Tender value >= 25 Lac
Ad in Indian Trade Journal(ITJ)
At least one National Daily having wide
circulation
Publish at own website & NIC website
NIT to Indian Embassies abroad as well
as foreign embassies in India
Three Weeks time from date of
publication of bid
GFR : 151- LIMITED TENDERGFR : 151- LIMITED TENDER
Value up to 25 Lac
Bid document should be sent to Regd.
Suppliers by Speed Post/Regd
Post/Courier/ e-mail
No. of supplier firms in Ltd. Tender
should be more than three
Web based publicity
N.B. – Sufficient time should be given in
Ltd. Tender
Two Bid SystemTwo Bid System
1. Technical Bid (Tech. + Comm. Terms
)
2. Financial Bid (Item wise price )
(1) + (2) = (3) Main Envelop
 Firstly Tech. Bid shall be opened and
evaluated
 Secondly Fin. Bid of Technically
acceptable offer should be opened &
evaluated
Single TenderSingle Tender
 If only a particular firm is the
manufacturer
Emergent need to procure from a
particular source
Technical reason to be recorded
(standardization of machinery – HP,
SONY etc. )
N.B. - Single response to an open bid
can’t be termed as Single Tender
Standard Bid Document : -Standard Bid Document : -
Instruction to Bidder
Conditions of Contract
Schedule of Requirement
Specifications & allied Tech. details
Price Schedule
Contract Form
Other Standard Forms
Earnest Money DepositEarnest Money Deposit
To safeguard the interest of Deptt
(withdrawal / alter the bid by bidder)
Exemption – Regd. With Central
Purchase Organisation / National Small
Industries Corporation
EMD - 2 % to 5% of estimated value
Can be DD/ FDR/Banker Cheque /BG
Unsuccessful bidders EMD should be
returned /refunded at the earliest.
Performance SecurityPerformance Security
From the successful bidders
Amount – 5% to 10%
DD/FDR
Should be valid for 60 days beyond the
date of completion of all the contractual
obligations of the supplier including
warranty
Bid Security should be refunded on
receipt of Performance Security
Process at a glanceProcess at a glance
 Estimate (Qty. and Amount)
 EOI – Expression of Interest
 RFP/RFQ – Request for Proposal / Quotation
 PBC – Pre Bid Conference
 NIT – Notice Inviting Tender
 APPROVAL
 WEB PUBLICITY
 EMD – Earnest Money Deposit
 BIDDING
 TOC – Tender Opening Committee (Tech)
 APPROVAL
Process at a glanceProcess at a glance
 TOC – Tender Opening Committee(Fin.
Bid)
 APPROVAL
 TEC – Tender Evaluation Committee
 APPROVAL
 PO - Purchase Order
 AWARD OF CONTRACT
 SD - Security Deposit
 AGREEMENT
 REFUND OF EMD
 NOTICE / WEB PUBLICITY ABOUT AWARD
OF CONTRACT(Downloadable form)
EVALUATION PROCESS - microEVALUATION PROCESS - micro
 Tender is sealed
Tender documents must clearly
specify evaluation criteria.
Two types of Bids:
◦ Technical
◦ Financial
Tender evaluation to be in
accordance with evaluation criteria.
EVALUATION PROCESS - microEVALUATION PROCESS - micro
Time taken for evaluation and
extension of tender validity.
Process of tender evaluation to be
confidential until the award of the
contract is notified.
Difference between TOC (Tender
Opening Committee) & TEC
(Tender Evaluation Committee)
EVALUATION PROCESS - microEVALUATION PROCESS - micro
The factors for initial examination:
◦ Whether the tenderer meets the eligibility
criteria ?
◦ Whether the crucial documents have been
submitted & duly signed / attested ?
◦ Whether the requisite EMD (Earnest Money
Deposit) has been furnished ?
EVALUATION PROCESS - microEVALUATION PROCESS - micro
Satisfaction of Conditions specific to the
contract
Sample Testing
Capacity Evaluation.
Turnover
Statutory documentation
Arrival at Outcome Price of the bid
Determination of L-1, L-2, L-3……
Determining Reasonableness of the L-1 Rates
Recommendation for Negotiation (if require)
CVC Guidelines: Pre-Award StageCVC Guidelines: Pre-Award Stage
Financial and Technical sanction of competent
authority is available.
Adequate and wide publicity is given.
Advertisement is posted on website and tender
documents are available for downloading.
Convenient tender receiving/opening time and
address of the tender receiving officials/tender
box are properly notified.
In the case of limited tender, panel is prepared in
a transparent manner clearly publishing the
eligibility criteria. The panel is updated regularly.
Pre-qualification criteria are properly defined/
notified.
CVC Guidelines: Pre-Award StageCVC Guidelines: Pre-Award Stage
Short listed firms/consultants are fulfilling the
eligibility criteria. There is no deviation from notified
criteria during evaluation.
Experience certificates submitted have been duly
verified.
Tenders/bids are opened in the presence of
bidders/their authorised representative.
Corrections/omissions/additions etc., in price bid are
properly numbered and attested and accounted page
–wise. Tender summary note/ Tender opening
register is scrupulously maintained.
Conditions having financial implications are not
altered after opening of the price bids.
CVC Guidelines: NegotiationsCVC Guidelines: Negotiations
Circular No. 4/3/07, 3rd March, 2007
As post tender negotiations could often
be a source of corruption, it is directed that
there should be no post-tender negotiations
with L-1, except in certain exceptional
situations. Such exceptional situations would
include, procurement of proprietary items,
items with limited sources of supply and
items where there is suspicion of a cartel
formation. The justification and details of
such negotiations should be duly recorded
and documented without any loss of time.
Latest guideline of CVC on negotiationLatest guideline of CVC on negotiation
Procurement of Works, Goods
and Services - Guidelines on
Tenders/Use of website
http://cvc.nic.in/proc_works.htm

More Related Content

PPT
Procurement of goods , GFR provisions
PPTX
Tender & bidding in construction projects
PDF
Bid Management PowerPoint Presentation Slides
PPT
Project financing
PPTX
Tender procedure slide
PDF
Sustainability
PPTX
Tender & Tender Notice
Procurement of goods , GFR provisions
Tender & bidding in construction projects
Bid Management PowerPoint Presentation Slides
Project financing
Tender procedure slide
Sustainability
Tender & Tender Notice

What's hot (20)

PPT
Tender Management
PPTX
Tendering
PDF
Bid Evaluation
PPTX
Tendering presenation
PPTX
Module 4 lecture 1
PPTX
EVALUATION OF BID & AWARDING OF WORK
PPTX
Tendering process, Bid Evaluation & Award Process
PPTX
The Basics of Tendering & Bidding
PPTX
Tender processing
PPTX
Tenders , Invitation of tender
PPTX
BIDDING-TENDER-CONTRACT
PPT
Procurement of services
PPT
Lecture 1 introduction to construction procurement process.
PPTX
Tenders for construction
PDF
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
PPT
Tendering in construction introduction
PPT
Tender evaluation procedure
PPT
Fidic flow charts final
PPTX
Tenders, their types and process
Tender Management
Tendering
Bid Evaluation
Tendering presenation
Module 4 lecture 1
EVALUATION OF BID & AWARDING OF WORK
Tendering process, Bid Evaluation & Award Process
The Basics of Tendering & Bidding
Tender processing
Tenders , Invitation of tender
BIDDING-TENDER-CONTRACT
Procurement of services
Lecture 1 introduction to construction procurement process.
Tenders for construction
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
Tendering in construction introduction
Tender evaluation procedure
Fidic flow charts final
Tenders, their types and process
Ad

Similar to Tendering process cvc_guidelines (20)

PPT
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PDF
Mechanisms to implement wind energy projects “egyptian experience”
PDF
Tpt's tendering process at a glance
PDF
StandardTenderDocument-14122020.pdf
PPTX
Government Tender Key words and Process with example
PPT
REPUBLIC ACT 9184 PROCUREMENT GUIDLEINES
PPT
Revised Procurement Guidelines and Simplified Bidding Procedures for Electric...
PPTX
Procurement Procedure using OTM, LTM and RFQM by Zahangir XEN.pptx
PPTX
BIDDING PROCEDURES AND UPDATES.pptx
PPTX
2. Project Procurement Process.pptx
PPTX
Procurement Procedure using OTM, LTM and RFQM by Zahangir XEN (1).pptx
PPTX
Tendering & Pre Construction Operations in Construction
PPTX
Procurement management in PS. ppt_MCMC.pptx
PPT
Tender process United Nation PD2018 (1).ppt
PPT
Tender process 2018Tender process 2018Tender process 2018Tender process 2018T...
PPT
Tender on Water services in PRED Department
PPT
Orientation programme on purchase procedure
PPT
Understanding Pre Qualification Questionnaires
PPTX
Lecture-2 fgcxhvcbsjvdcn mv,nnjnkvdxbccccccccccckkkknb.pptx
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
Mechanisms to implement wind energy projects “egyptian experience”
Tpt's tendering process at a glance
StandardTenderDocument-14122020.pdf
Government Tender Key words and Process with example
REPUBLIC ACT 9184 PROCUREMENT GUIDLEINES
Revised Procurement Guidelines and Simplified Bidding Procedures for Electric...
Procurement Procedure using OTM, LTM and RFQM by Zahangir XEN.pptx
BIDDING PROCEDURES AND UPDATES.pptx
2. Project Procurement Process.pptx
Procurement Procedure using OTM, LTM and RFQM by Zahangir XEN (1).pptx
Tendering & Pre Construction Operations in Construction
Procurement management in PS. ppt_MCMC.pptx
Tender process United Nation PD2018 (1).ppt
Tender process 2018Tender process 2018Tender process 2018Tender process 2018T...
Tender on Water services in PRED Department
Orientation programme on purchase procedure
Understanding Pre Qualification Questionnaires
Lecture-2 fgcxhvcbsjvdcn mv,nnjnkvdxbccccccccccckkkknb.pptx
Ad

Recently uploaded (20)

PPTX
Chapter 1: Philippines constitution laws
PDF
Items # 6&7 - 900 Cambridge Oval Right-of-Way
PPTX
The DFARS - Part 251 - Use of Government Sources By Contractors
PDF
PPT Item # 5 - 5307 Broadway St (Final Review).pdf
PPTX
DFARS Part 253 - Forms - Defense Contracting Regulations
PPT
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
PPTX
LUNG CANCER PREDICTION MODELING USING ARTIFICIAL NEURAL NETWORK.pptx
PDF
PPT Item # 10 -- Proposed 2025 Tax Rate
PDF
2024-Need-Assessment-Report-March-2025.pdf
PDF
Introducrion of creative nonfiction lesson 1
PDF
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
PPTX
CHS rollout Presentation by Abraham Lebeza.pptx
PDF
Item # 5 - 5307 Broadway St final review
PDF
4_Key Concepts Structure and Governance plus UN.pdf okay
PPTX
Presentatio koos kokos koko ossssn5.pptx
PDF
Abhay Bhutada Foundation’s ESG Compliant Initiatives
PPTX
cpgram enivaran cpgram enivaran cpgram enivaran
PPTX
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
DOCX
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu
PPTX
Workshop-Session-1-LGU-WFP-Formulation.pptx
Chapter 1: Philippines constitution laws
Items # 6&7 - 900 Cambridge Oval Right-of-Way
The DFARS - Part 251 - Use of Government Sources By Contractors
PPT Item # 5 - 5307 Broadway St (Final Review).pdf
DFARS Part 253 - Forms - Defense Contracting Regulations
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
LUNG CANCER PREDICTION MODELING USING ARTIFICIAL NEURAL NETWORK.pptx
PPT Item # 10 -- Proposed 2025 Tax Rate
2024-Need-Assessment-Report-March-2025.pdf
Introducrion of creative nonfiction lesson 1
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
CHS rollout Presentation by Abraham Lebeza.pptx
Item # 5 - 5307 Broadway St final review
4_Key Concepts Structure and Governance plus UN.pdf okay
Presentatio koos kokos koko ossssn5.pptx
Abhay Bhutada Foundation’s ESG Compliant Initiatives
cpgram enivaran cpgram enivaran cpgram enivaran
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu
Workshop-Session-1-LGU-WFP-Formulation.pptx

Tendering process cvc_guidelines

  • 1. PROCESSING OF TENDERSPROCESSING OF TENDERS ANDAND CVC GUIDELINESCVC GUIDELINES Kashi Nath Jha Dir., NICF
  • 3. Fundamental Principle of PublicFundamental Principle of Public buyingbuying (A)Procurement of goods in Public Interest – i.Efficiency, ii.Economy, iii.Transparency (B) Fair & Equitable treatment of suppliers (C)Promotion of Competition
  • 4. PUBLICPUBLIC PROCUREMENT :PROCUREMENT : YARDSTICKSYARDSTICKS Specifications in terms of quality Need based procurement (avoid excess) Fair, Reasonable & Transparent procedure Procurement Vs Requirement Reasonableness of Rate Each stage of procurement should be recorded
  • 5. GFR: Rule 145GFR: Rule 145 Purchase of goods without quotation  Value upto 15000/-  Each occasion  Certificate to be recorded by the competent Authority – “I,------ am personally satisfied that these goods purchased are of the requisite quality and specification and have been purchased from a reliable supplier at a reasonable price.”
  • 6. GFR: Rule 146GFR: Rule 146 Purchase of goods by Purchase Committee >15000/- and upto 1Lac on each occasion Three members Committee as decided by the HoD Committee’s responsibilities a)Market Survey b)Reasonableness of Rates c)Quality & Specifications d)Identify appropriate supplier Joint Certificate by the Committee
  • 7. Purchase of goods by obtainingPurchase of goods by obtaining bids(Tendering)bids(Tendering) Ministry / Departments of Govt. of India have been delegated full powers to make their own arrangements for procurement of goods Rule 141 of GFR says about Central Purchase Organisation (e.g. DGS&D) RATE CONTRACT
  • 8. Types of TenderTypes of Tender In broader terms there are three types of tender : - A.Open Tender B.Limited Tender C.Single Tender
  • 9. Method of obtaining bid :Method of obtaining bid : Advertised Tender Enquiry (open )Advertised Tender Enquiry (open ) Tender value >= 25 Lac Ad in Indian Trade Journal(ITJ) At least one National Daily having wide circulation Publish at own website & NIC website NIT to Indian Embassies abroad as well as foreign embassies in India Three Weeks time from date of publication of bid
  • 10. GFR : 151- LIMITED TENDERGFR : 151- LIMITED TENDER Value up to 25 Lac Bid document should be sent to Regd. Suppliers by Speed Post/Regd Post/Courier/ e-mail No. of supplier firms in Ltd. Tender should be more than three Web based publicity N.B. – Sufficient time should be given in Ltd. Tender
  • 11. Two Bid SystemTwo Bid System 1. Technical Bid (Tech. + Comm. Terms ) 2. Financial Bid (Item wise price ) (1) + (2) = (3) Main Envelop  Firstly Tech. Bid shall be opened and evaluated  Secondly Fin. Bid of Technically acceptable offer should be opened & evaluated
  • 12. Single TenderSingle Tender  If only a particular firm is the manufacturer Emergent need to procure from a particular source Technical reason to be recorded (standardization of machinery – HP, SONY etc. ) N.B. - Single response to an open bid can’t be termed as Single Tender
  • 13. Standard Bid Document : -Standard Bid Document : - Instruction to Bidder Conditions of Contract Schedule of Requirement Specifications & allied Tech. details Price Schedule Contract Form Other Standard Forms
  • 14. Earnest Money DepositEarnest Money Deposit To safeguard the interest of Deptt (withdrawal / alter the bid by bidder) Exemption – Regd. With Central Purchase Organisation / National Small Industries Corporation EMD - 2 % to 5% of estimated value Can be DD/ FDR/Banker Cheque /BG Unsuccessful bidders EMD should be returned /refunded at the earliest.
  • 15. Performance SecurityPerformance Security From the successful bidders Amount – 5% to 10% DD/FDR Should be valid for 60 days beyond the date of completion of all the contractual obligations of the supplier including warranty Bid Security should be refunded on receipt of Performance Security
  • 16. Process at a glanceProcess at a glance  Estimate (Qty. and Amount)  EOI – Expression of Interest  RFP/RFQ – Request for Proposal / Quotation  PBC – Pre Bid Conference  NIT – Notice Inviting Tender  APPROVAL  WEB PUBLICITY  EMD – Earnest Money Deposit  BIDDING  TOC – Tender Opening Committee (Tech)  APPROVAL
  • 17. Process at a glanceProcess at a glance  TOC – Tender Opening Committee(Fin. Bid)  APPROVAL  TEC – Tender Evaluation Committee  APPROVAL  PO - Purchase Order  AWARD OF CONTRACT  SD - Security Deposit  AGREEMENT  REFUND OF EMD  NOTICE / WEB PUBLICITY ABOUT AWARD OF CONTRACT(Downloadable form)
  • 18. EVALUATION PROCESS - microEVALUATION PROCESS - micro  Tender is sealed Tender documents must clearly specify evaluation criteria. Two types of Bids: ◦ Technical ◦ Financial Tender evaluation to be in accordance with evaluation criteria.
  • 19. EVALUATION PROCESS - microEVALUATION PROCESS - micro Time taken for evaluation and extension of tender validity. Process of tender evaluation to be confidential until the award of the contract is notified. Difference between TOC (Tender Opening Committee) & TEC (Tender Evaluation Committee)
  • 20. EVALUATION PROCESS - microEVALUATION PROCESS - micro The factors for initial examination: ◦ Whether the tenderer meets the eligibility criteria ? ◦ Whether the crucial documents have been submitted & duly signed / attested ? ◦ Whether the requisite EMD (Earnest Money Deposit) has been furnished ?
  • 21. EVALUATION PROCESS - microEVALUATION PROCESS - micro Satisfaction of Conditions specific to the contract Sample Testing Capacity Evaluation. Turnover Statutory documentation Arrival at Outcome Price of the bid Determination of L-1, L-2, L-3…… Determining Reasonableness of the L-1 Rates Recommendation for Negotiation (if require)
  • 22. CVC Guidelines: Pre-Award StageCVC Guidelines: Pre-Award Stage Financial and Technical sanction of competent authority is available. Adequate and wide publicity is given. Advertisement is posted on website and tender documents are available for downloading. Convenient tender receiving/opening time and address of the tender receiving officials/tender box are properly notified. In the case of limited tender, panel is prepared in a transparent manner clearly publishing the eligibility criteria. The panel is updated regularly. Pre-qualification criteria are properly defined/ notified.
  • 23. CVC Guidelines: Pre-Award StageCVC Guidelines: Pre-Award Stage Short listed firms/consultants are fulfilling the eligibility criteria. There is no deviation from notified criteria during evaluation. Experience certificates submitted have been duly verified. Tenders/bids are opened in the presence of bidders/their authorised representative. Corrections/omissions/additions etc., in price bid are properly numbered and attested and accounted page –wise. Tender summary note/ Tender opening register is scrupulously maintained. Conditions having financial implications are not altered after opening of the price bids.
  • 24. CVC Guidelines: NegotiationsCVC Guidelines: Negotiations Circular No. 4/3/07, 3rd March, 2007 As post tender negotiations could often be a source of corruption, it is directed that there should be no post-tender negotiations with L-1, except in certain exceptional situations. Such exceptional situations would include, procurement of proprietary items, items with limited sources of supply and items where there is suspicion of a cartel formation. The justification and details of such negotiations should be duly recorded and documented without any loss of time.
  • 25. Latest guideline of CVC on negotiationLatest guideline of CVC on negotiation
  • 26. Procurement of Works, Goods and Services - Guidelines on Tenders/Use of website http://cvc.nic.in/proc_works.htm