Page 2Classification: Restricted
Agenda
• Requirement Management
• Configuration Management
• Project Management
• Risk Management
Page 3Classification: Restricted
Requirements, CM, Strategy & DLC
• Requirement Management
• Configuration Management
• Project Management
• Risk Management
• Test Strategy and Planning
• Overview of Test Strategy
• Test Planning (Pre->Test->Post Activities)
• Risk Analysis
• Estimations
• Typical Test issues
Page 4Classification: Restricted
Requirement Management
Testing Cycle starts with the study of client’s requirements.
Understanding of the requirements is very essential for testing the product.
Requirements management is the process of documenting, analyzing,
tracing, prioritizing and agreeing on requirements and then controlling
change and communicating to relevant stakeholders. It is a continuous
process throughout a project. A requirement is a capability to which a project
outcome (product or service) should conform
Page 5Classification: Restricted
Configuration Management
PC version
Initial system DEC
version
VMS
version
Unix
version
Mainfram
e version
Workstatio
n version
Sun
version
CM should be based on a set of standards, which are applied within
an organization.
Page 6Classification: Restricted
CM Planning
• Documents, required for future system maintenance, should be identified and
included as managed documents.
• It defines the types of documents to be managed and a document naming scheme.
Change Management
• Keeping and managing the changes and ensuring that they are implemented in the
most cost-effective way.
Change Request form
A part of the CM planning process
 Records change required
 Change suggested by
 Reason why change was suggested
 Urgency of change
 Records change evaluation
 Impact analysis
 Change cost
 Recommendations(system maintenance staff)
Page 7Classification: Restricted
VERSION AND RELEASE MANAGEMENT
Invent identification scheme for system versions and plan when new system
version is to be produced.
Ensure that version management procedures and tools are properly applied
and to plan and distribute new system releases.
Versions/Releases
Versions - An instance of a system, which is functionally distinct in some way from
other system instances.
Release -An instance of a system, which is distributed to users outside of the
development team.
Page 8Classification: Restricted
Project Management
Project Staffing
Project budget may not allow to utilize highly – paid staff.
Staff with the appropriate experience may not be available.
Project Scheduling
Bar charts and Activity Networks
Scheduling problems
Page 9Classification: Restricted
Project Planning
Plan Description
Quality plan Describes the quality procedures and
standards used in a project.
Validation plan Describes the approach, resources and
schedule used for system validation.
Configuration
management
plan
Describes the configuration management
procedures and structures to be used.
Maintenance
plan
Predicts the maintenance requirements of
the system/ maintenance costs and
efforts required.
Staff
development
plan
Describes how the skills and experience
of the project team members will be
developed.
Page 10Classification: Restricted
Risk Management
• Risk identification
• Risk Analysis
• Risk Planning
• Risk Monitoring
Page 11Classification: Restricted
Risk Risk
type
Description
Staff
turnover
Project Experienced staff will leave the
project before it is finished.
Management
change
Project There will be a change of
organizational management with
different priorities.
Hardware
unavailability
Project Hardware which is essential for the project
will not be delivered on schedule.
Requiremens
change
Project &
Product
There will be a larger number of
changes to the requirements than
anticipated.
Page 12Classification: Restricted
Risk Risk type Description
Specification delays Project &
Product
Specifications of essential interfaces are
not available on schedule.
Size under estimate Project &
Product
The size of the system has been under
estimated.
CASE tool under
performance
Product CASE tools which support the project do
not perform as anticipated.
Technology change Business The underlying technology on which the
system is built is superseded by new
technology.
Product
competition
Business A competitive product is marketed
before the system is completed.
Page 13Classification: Restricted
Thank You

More Related Content

PPTX
Quality Management and Quality Standard
PPT
Project Management
PPTX
Test Strategy and Planning
PPSX
Test Strategies and Planning
PPSX
Test Strategy and Planning
PPSX
Fundamentals of SDLC for Business Analysts
PDF
A Proven Process & Framework to Manage Your Change Project
PPSX
Requirements Management
Quality Management and Quality Standard
Project Management
Test Strategy and Planning
Test Strategies and Planning
Test Strategy and Planning
Fundamentals of SDLC for Business Analysts
A Proven Process & Framework to Manage Your Change Project
Requirements Management

What's hot (11)

PDF
White Paper How To Define Outsourced Qa Project Plan, Quality Assurance, Proj...
PDF
Risk management overview
PDF
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PPT
Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00
PPSX
SDLC
PPTX
Capability Maturity Model Integartion
PPT
Managing IT Projects
DOC
Change management process 17.01.15
PPSX
Requirement Elicitation Techniques
DOCX
Summary
PPSX
Role of BA in Testing
White Paper How To Define Outsourced Qa Project Plan, Quality Assurance, Proj...
Risk management overview
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00
SDLC
Capability Maturity Model Integartion
Managing IT Projects
Change management process 17.01.15
Requirement Elicitation Techniques
Summary
Role of BA in Testing
Ad

Similar to Test Management (20)

PPT
Software Project Management lecture 7
PPSX
Requirement Management
PPTX
Itil prc review
PPSX
Session 04 - Project Planning
PPSX
Requirement Engineering
PPT
Q7503 12post
PPTX
Configuration Managment Powerpoint
PPT
A Brief Introduction to Software Configuration Management
PPTX
Software Engineering
PDF
Feb Apln OC Shawna C
PPTX
CMII & Agile: There's a better way to do it - let's find it
PPTX
Software Professional Services Project Management
PDF
Sea spin5 2013
PPT
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
PPTX
Types of Testing
PPTX
Test Planning and Test Estimation Techniques
PDF
Agile and CMMI: Yes, They Can Work Together
PPTX
Leveraging Change Control for Security
PDF
Intro to Agile Methods for Execs, Leaders, and Managers
Software Project Management lecture 7
Requirement Management
Itil prc review
Session 04 - Project Planning
Requirement Engineering
Q7503 12post
Configuration Managment Powerpoint
A Brief Introduction to Software Configuration Management
Software Engineering
Feb Apln OC Shawna C
CMII & Agile: There's a better way to do it - let's find it
Software Professional Services Project Management
Sea spin5 2013
adosadaojdoisadaodiaosdijasodiasodjowqidoqidjowqdwq
Types of Testing
Test Planning and Test Estimation Techniques
Agile and CMMI: Yes, They Can Work Together
Leveraging Change Control for Security
Intro to Agile Methods for Execs, Leaders, and Managers
Ad

More from Fayis-QA (15)

PPSX
HP LoadRunner
PPSX
VBScript in Software Testing
PPSX
Selenium WebDriver with Java
PPSX
Core Java Basics
PPSX
Introduction to Automation Testing
PPSX
HP ALM QC
PPSX
Defect Life Cycle
PPSX
Testing Concepts and Manual Testing
PPSX
Quality Standard
PPSX
Agile in QA
PPSX
SDLC
PPSX
Introduction to Software Testing Part- 2
PPSX
Test Case Design and Technique
PPSX
Agile
PPSX
Types of Testing
HP LoadRunner
VBScript in Software Testing
Selenium WebDriver with Java
Core Java Basics
Introduction to Automation Testing
HP ALM QC
Defect Life Cycle
Testing Concepts and Manual Testing
Quality Standard
Agile in QA
SDLC
Introduction to Software Testing Part- 2
Test Case Design and Technique
Agile
Types of Testing

Recently uploaded (20)

PDF
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
PDF
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
PDF
Data Virtualization in Action: Scaling APIs and Apps with FME
PPTX
SGT Report The Beast Plan and Cyberphysical Systems of Control
PDF
INTERSPEECH 2025 「Recent Advances and Future Directions in Voice Conversion」
PDF
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
PDF
Rapid Prototyping: A lecture on prototyping techniques for interface design
PDF
Introduction to MCP and A2A Protocols: Enabling Agent Communication
PPTX
Build automations faster and more reliably with UiPath ScreenPlay
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PPTX
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
PPTX
Microsoft User Copilot Training Slide Deck
PDF
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
PPTX
Training Program for knowledge in solar cell and solar industry
PDF
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
PDF
Electrocardiogram sequences data analytics and classification using unsupervi...
PDF
Advancing precision in air quality forecasting through machine learning integ...
PDF
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
PDF
NewMind AI Weekly Chronicles – August ’25 Week IV
PDF
Co-training pseudo-labeling for text classification with support vector machi...
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
Data Virtualization in Action: Scaling APIs and Apps with FME
SGT Report The Beast Plan and Cyberphysical Systems of Control
INTERSPEECH 2025 「Recent Advances and Future Directions in Voice Conversion」
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
Rapid Prototyping: A lecture on prototyping techniques for interface design
Introduction to MCP and A2A Protocols: Enabling Agent Communication
Build automations faster and more reliably with UiPath ScreenPlay
giants, standing on the shoulders of - by Daniel Stenberg
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
Microsoft User Copilot Training Slide Deck
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
Training Program for knowledge in solar cell and solar industry
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
Electrocardiogram sequences data analytics and classification using unsupervi...
Advancing precision in air quality forecasting through machine learning integ...
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
NewMind AI Weekly Chronicles – August ’25 Week IV
Co-training pseudo-labeling for text classification with support vector machi...

Test Management

  • 1. Quality Assurance / Software Testing Training Requirement Management Configuration Management Project Management Risk Management
  • 2. Page 2Classification: Restricted Agenda • Requirement Management • Configuration Management • Project Management • Risk Management
  • 3. Page 3Classification: Restricted Requirements, CM, Strategy & DLC • Requirement Management • Configuration Management • Project Management • Risk Management • Test Strategy and Planning • Overview of Test Strategy • Test Planning (Pre->Test->Post Activities) • Risk Analysis • Estimations • Typical Test issues
  • 4. Page 4Classification: Restricted Requirement Management Testing Cycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product. Requirements management is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project. A requirement is a capability to which a project outcome (product or service) should conform
  • 5. Page 5Classification: Restricted Configuration Management PC version Initial system DEC version VMS version Unix version Mainfram e version Workstatio n version Sun version CM should be based on a set of standards, which are applied within an organization.
  • 6. Page 6Classification: Restricted CM Planning • Documents, required for future system maintenance, should be identified and included as managed documents. • It defines the types of documents to be managed and a document naming scheme. Change Management • Keeping and managing the changes and ensuring that they are implemented in the most cost-effective way. Change Request form A part of the CM planning process  Records change required  Change suggested by  Reason why change was suggested  Urgency of change  Records change evaluation  Impact analysis  Change cost  Recommendations(system maintenance staff)
  • 7. Page 7Classification: Restricted VERSION AND RELEASE MANAGEMENT Invent identification scheme for system versions and plan when new system version is to be produced. Ensure that version management procedures and tools are properly applied and to plan and distribute new system releases. Versions/Releases Versions - An instance of a system, which is functionally distinct in some way from other system instances. Release -An instance of a system, which is distributed to users outside of the development team.
  • 8. Page 8Classification: Restricted Project Management Project Staffing Project budget may not allow to utilize highly – paid staff. Staff with the appropriate experience may not be available. Project Scheduling Bar charts and Activity Networks Scheduling problems
  • 9. Page 9Classification: Restricted Project Planning Plan Description Quality plan Describes the quality procedures and standards used in a project. Validation plan Describes the approach, resources and schedule used for system validation. Configuration management plan Describes the configuration management procedures and structures to be used. Maintenance plan Predicts the maintenance requirements of the system/ maintenance costs and efforts required. Staff development plan Describes how the skills and experience of the project team members will be developed.
  • 10. Page 10Classification: Restricted Risk Management • Risk identification • Risk Analysis • Risk Planning • Risk Monitoring
  • 11. Page 11Classification: Restricted Risk Risk type Description Staff turnover Project Experienced staff will leave the project before it is finished. Management change Project There will be a change of organizational management with different priorities. Hardware unavailability Project Hardware which is essential for the project will not be delivered on schedule. Requiremens change Project & Product There will be a larger number of changes to the requirements than anticipated.
  • 12. Page 12Classification: Restricted Risk Risk type Description Specification delays Project & Product Specifications of essential interfaces are not available on schedule. Size under estimate Project & Product The size of the system has been under estimated. CASE tool under performance Product CASE tools which support the project do not perform as anticipated. Technology change Business The underlying technology on which the system is built is superseded by new technology. Product competition Business A competitive product is marketed before the system is completed.