Introduction
 Heating, Ventilation and air – conditioning (HVAC) systems are used in
pharmaceutical plat to prevent contamination and to provide
comfortable working conditions.
 HVAC are called Air Handling Units (AHU).
 AHU comprises of air supply, coarse filtration, heating or cooling and
HEPA filtration.
 Flow of air into the room may be horizontal or vertical.
 AHU producing class A (class 100 L), class B (class 100 T) & class C
(class 10,000) HEPA filters may be located in AHU.
Introduction
HVAC Qualification
 To ensure that equipment is designed as per
requirement, installed properly.
 Action of proving that any equipment works correctly
and leads to the expected results.
HVAC Qualification
Validation master plan
User requirements specifications
Design Qualification
Installation Qualification
Operational Qualification
Performance Qualification
Re Qualification
Qualification
Validation
HVAC User Requirement Qualification
 Room Temperature & Relative Humidity.
 Clean Room Classifications for areas i.e. B, C or D.
 Single Pass or Re-circulated HVAC system.
 Room pressure / Air flow directions.
 GMP requirements,
HVAC User Requirement Qualification
 Capacity of HVAC depends on.
1. Room Volume.
2. No. of Air Changes Required.
3. Production / Consumption Data.
4. Seasonal Fluctuation.
5. Air classification of Rooms.
6. Future Development.
HVAC User Requirement Qualification
 Parameters to be defined in levels of Protection:
1. Filter type and position.
2. Air changes.
3. Air flow patterns.
4. Pressure differentials.
5. Contamination levels by particulate matter & micro –
organisms.
HVAC Design Qualification
 As per URS
 DQ must be as per
1. Class of cleanliness
2. Category of products to be manufactured.
3. Room design criteria
4. Reference to regulatory requirements
• It Should include
1. Functional Specifications
2. Technical Specification
3. Detailed Air flow Schematics
4. Detailed layout drawing of the system
HVAC Design Qualification
 Ensures that design
1. Meets URS
2. Details facility airflow and pressure cascade philosophy
3. Takes into account process & personnel flow
4. Details materials of construction
5. Details safety requirements
6. Details of all equipment and utilities
HVAC Installation Qualification
IQ includes –
 Manufacturers' equipment and workmanship verification.
 Calibration verification.
 SOP verification.
 Utilities connection verification.
 Change parts & replacement parts verification.
 Lubricant verification.
 Maintenance procedure verification.
 Lubrication verification.
HVAC Operational Qualification
 Air system balancing & pressure differential test.
 Air volume for non-uni-directional air flow terminal HEPA filter test.
 HEPA filter integrity test.
 Pressure differential stress test.
 Start up & shut down test.
 Control & monitoring device test.
 Air flow velocity & uniformity test.
 Air parallelism test.
HVAC Performance Qualification
PQ is similar to OQ but in PQ HVAC is assessed for its performance within the
area it is serving by simulating the process or by actually conducting it.
 Air system balancing & pressure differential test.
 Air volume for non-uni-directional air flow terminal HEPA filter test.
 HEPA filter integrity test.
 Pressure differential stress test.
 Start up & shut down test.
 Control & monitoring device test.
 Air flow velocity & uniformity test.
 Air parallelism test.
HVAC Performance Qualification
 Temperature – humidity control test.
 Air cleanliness test (Nonviable particle counting).
 Air borne bio burden test.
HVAC Performance Qualification
HVAC Performance Qualification
THANKYOU
ANY QUESTIONS

More Related Content

PPTX
Validation of hvac
PPT
Validation of hvac
PPTX
Tablet equipments
PPTX
Auditing of microbiology laboratory
PDF
HVAC validation.pdf
PDF
Clean room
PPTX
Qualification of Dry Heat Sterilizer or Tunnel.pptx
PPTX
Auditing of microbiological lab
Validation of hvac
Validation of hvac
Tablet equipments
Auditing of microbiology laboratory
HVAC validation.pdf
Clean room
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Auditing of microbiological lab

What's hot (20)

PPTX
Validation of utility system (water system)
PPTX
Validation utility system
PPTX
QUALIFICATION OF MANUFACTURING EQUIPMENTS
PPT
21 cfr part 210 and 211
PDF
Audit of vendors and Production department
PPTX
Pharmaceutical validation of water system
PPTX
cGMP Guidelines According to Schedule M
PPTX
Current Good Manufacturing Practices
PDF
Introduction to validation
PPTX
Validation utility system
PPTX
Auditing of vendors and production department
PPTX
Qualification of tablet compression (machine) & Capsule filling machine
PPTX
Vendor Audit
PPTX
Validation of pharaceutical water system and pure steam
PPTX
Packaging material vendor audit
Validation of utility system (water system)
Validation utility system
QUALIFICATION OF MANUFACTURING EQUIPMENTS
21 cfr part 210 and 211
Audit of vendors and Production department
Pharmaceutical validation of water system
cGMP Guidelines According to Schedule M
Current Good Manufacturing Practices
Introduction to validation
Validation utility system
Auditing of vendors and production department
Qualification of tablet compression (machine) & Capsule filling machine
Vendor Audit
Validation of pharaceutical water system and pure steam
Packaging material vendor audit
Ad

Viewers also liked (9)

PPT
Microbial limit test 112070804013
DOC
Hvac validation protocol
PDF
Validation Master Plan
PPT
Clean Room_Presentation
PPT
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
PPTX
pharmaceutical clean room
PPTX
Cleanroom, Classification, Design and
PPTX
HVAC Basic Concepts of Air Conditioning
PPT
Hvac presentation for beginers
Microbial limit test 112070804013
Hvac validation protocol
Validation Master Plan
Clean Room_Presentation
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
pharmaceutical clean room
Cleanroom, Classification, Design and
HVAC Basic Concepts of Air Conditioning
Hvac presentation for beginers
Ad

Similar to Validation of Heat ventilation air conditioning (20)

PDF
Key_issues_in_Qualification_of_HVAC_systems_1687758626.pdf
PPTX
Heating Ventilation and Air Conditioner HVAC Qualification
PPTX
Validation of hvac system
PDF
Cleanroom Qualification
PPTX
HVAC system
PPTX
Hvac part 3
PPT
Validation of equipments
PDF
Validation of HVAC pharma geeta TUBE (Utility Systems)
PPTX
Support utilities validation.pptx (asmita magare)
PDF
HVAC Validation (Air Handling Units).pdf
DOCX
Doc1 copy
PPTX
Qualification of manufacturing equipment.
PPTX
Equipment Qualification.pptx
PPT
Principle of Validation and Qualification
PPTX
Validation of utilities
PPTX
Qualification of HVAC Systems As Per WHO
PPTX
Air circulation maintenance industry for sterile and non sterile area
PPTX
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
 
PPTX
Facility Qualification & Consideration of Validation Aspects
PPTX
instrument validation
Key_issues_in_Qualification_of_HVAC_systems_1687758626.pdf
Heating Ventilation and Air Conditioner HVAC Qualification
Validation of hvac system
Cleanroom Qualification
HVAC system
Hvac part 3
Validation of equipments
Validation of HVAC pharma geeta TUBE (Utility Systems)
Support utilities validation.pptx (asmita magare)
HVAC Validation (Air Handling Units).pdf
Doc1 copy
Qualification of manufacturing equipment.
Equipment Qualification.pptx
Principle of Validation and Qualification
Validation of utilities
Qualification of HVAC Systems As Per WHO
Air circulation maintenance industry for sterile and non sterile area
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
 
Facility Qualification & Consideration of Validation Aspects
instrument validation

Recently uploaded (20)

PDF
Compact First Student's Book Cambridge Official
DOCX
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
PDF
African Communication Research: A review
PPT
hsl powerpoint resource goyloveh feb 07.ppt
PPTX
growth and developement.pptxweeeeerrgttyyy
PDF
Kalaari-SaaS-Founder-Playbook-2024-Edition-.pdf
PDF
Laparoscopic Imaging Systems at World Laparoscopy Hospital
PPTX
IT infrastructure and emerging technologies
DOCX
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
PPTX
Thinking Routines and Learning Engagements.pptx
PDF
GSA-Past-Papers-2010-2024-2.pdf CSS examination
PDF
Unleashing the Potential of the Cultural and creative industries
PPTX
MMW-CHAPTER-1-final.pptx major Elementary Education
PPTX
Power Point PR B.Inggris 12 Ed. 2019.pptx
PDF
Review of Related Literature & Studies.pdf
PPSX
namma_kalvi_12th_botany_chapter_9_ppt.ppsx
PDF
Health aspects of bilberry: A review on its general benefits
PPTX
Theoretical for class.pptxgshdhddhdhdhgd
PPTX
CHROMIUM & Glucose Tolerance Factor.pptx
PPTX
Copy of ARAL Program Primer_071725(1).pptx
Compact First Student's Book Cambridge Official
EDUCATIONAL ASSESSMENT ASSIGNMENT SEMESTER MAY 2025.docx
African Communication Research: A review
hsl powerpoint resource goyloveh feb 07.ppt
growth and developement.pptxweeeeerrgttyyy
Kalaari-SaaS-Founder-Playbook-2024-Edition-.pdf
Laparoscopic Imaging Systems at World Laparoscopy Hospital
IT infrastructure and emerging technologies
THEORY AND PRACTICE ASSIGNMENT SEMESTER MAY 2025.docx
Thinking Routines and Learning Engagements.pptx
GSA-Past-Papers-2010-2024-2.pdf CSS examination
Unleashing the Potential of the Cultural and creative industries
MMW-CHAPTER-1-final.pptx major Elementary Education
Power Point PR B.Inggris 12 Ed. 2019.pptx
Review of Related Literature & Studies.pdf
namma_kalvi_12th_botany_chapter_9_ppt.ppsx
Health aspects of bilberry: A review on its general benefits
Theoretical for class.pptxgshdhddhdhdhgd
CHROMIUM & Glucose Tolerance Factor.pptx
Copy of ARAL Program Primer_071725(1).pptx

Validation of Heat ventilation air conditioning

  • 1. URS, DQ, IQ, OQ, PQ of HVAC system Presented to – Dr. Alka N Chaudhary Associate Professor Division of Pharmaceutical Sciences, SGRRITS, Dehradun. By – Prashant Tomar M.Pharmacy QAT 2nd Semester SGRRITS, Dehradun.
  • 2. Introduction  Heating, Ventilation and air – conditioning (HVAC) systems are used in pharmaceutical plat to prevent contamination and to provide comfortable working conditions.  HVAC are called Air Handling Units (AHU).  AHU comprises of air supply, coarse filtration, heating or cooling and HEPA filtration.  Flow of air into the room may be horizontal or vertical.  AHU producing class A (class 100 L), class B (class 100 T) & class C (class 10,000) HEPA filters may be located in AHU.
  • 4. HVAC Qualification  To ensure that equipment is designed as per requirement, installed properly.  Action of proving that any equipment works correctly and leads to the expected results.
  • 5. HVAC Qualification Validation master plan User requirements specifications Design Qualification Installation Qualification Operational Qualification Performance Qualification Re Qualification Qualification Validation
  • 6. HVAC User Requirement Qualification  Room Temperature & Relative Humidity.  Clean Room Classifications for areas i.e. B, C or D.  Single Pass or Re-circulated HVAC system.  Room pressure / Air flow directions.  GMP requirements,
  • 7. HVAC User Requirement Qualification  Capacity of HVAC depends on. 1. Room Volume. 2. No. of Air Changes Required. 3. Production / Consumption Data. 4. Seasonal Fluctuation. 5. Air classification of Rooms. 6. Future Development.
  • 8. HVAC User Requirement Qualification  Parameters to be defined in levels of Protection: 1. Filter type and position. 2. Air changes. 3. Air flow patterns. 4. Pressure differentials. 5. Contamination levels by particulate matter & micro – organisms.
  • 9. HVAC Design Qualification  As per URS  DQ must be as per 1. Class of cleanliness 2. Category of products to be manufactured. 3. Room design criteria 4. Reference to regulatory requirements • It Should include 1. Functional Specifications 2. Technical Specification 3. Detailed Air flow Schematics 4. Detailed layout drawing of the system
  • 10. HVAC Design Qualification  Ensures that design 1. Meets URS 2. Details facility airflow and pressure cascade philosophy 3. Takes into account process & personnel flow 4. Details materials of construction 5. Details safety requirements 6. Details of all equipment and utilities
  • 11. HVAC Installation Qualification IQ includes –  Manufacturers' equipment and workmanship verification.  Calibration verification.  SOP verification.  Utilities connection verification.  Change parts & replacement parts verification.  Lubricant verification.  Maintenance procedure verification.  Lubrication verification.
  • 12. HVAC Operational Qualification  Air system balancing & pressure differential test.  Air volume for non-uni-directional air flow terminal HEPA filter test.  HEPA filter integrity test.  Pressure differential stress test.  Start up & shut down test.  Control & monitoring device test.  Air flow velocity & uniformity test.  Air parallelism test.
  • 13. HVAC Performance Qualification PQ is similar to OQ but in PQ HVAC is assessed for its performance within the area it is serving by simulating the process or by actually conducting it.  Air system balancing & pressure differential test.  Air volume for non-uni-directional air flow terminal HEPA filter test.  HEPA filter integrity test.  Pressure differential stress test.  Start up & shut down test.  Control & monitoring device test.  Air flow velocity & uniformity test.  Air parallelism test.
  • 14. HVAC Performance Qualification  Temperature – humidity control test.  Air cleanliness test (Nonviable particle counting).  Air borne bio burden test.