PROFESSIONAL PRACTICE AND VALUATION
TOPIC NAME: VALUATION
SUBJECT CODE: 2I70610
BRANCH: CIVIL ENGG,. 7TH SEM
PREPARED BY:
GUIDED BY: Prof. Pritesh Rathod
Prof. Sunil Jaganiya
content
■ Terms
■ Objects/purpose of valuation
■ Property income
■ Depreciation and Obsolescence
■ Methods of calculating Depreciation
■ Different forms of value
■ Factor affecting value of property
■ Valuation Tables and their uses
■ Valuation methods for property
■ Types of rent
Terms
■ Cost – The term cost is used to indicate the actual amount incurred in
producing a commodity.
■ Prime Cost – The expenditures or charges represented directly in the
commodity produced are called the prime cost.
■ Supplementary cost – Other expenditures or charges like rent, management,
services, salaries, depreciation, etc. represented indirectly in the production of
the commodity are called the supplementary cost.
■ Value – Value means its worth or utility.
■ Price – The term price is used to indicate the cost of the commodity plus profit
of the manufacturer.
Valuation
■ Valuation is the art of estimating or determining the fair price or value of a property such as a
building, a factory, other engineering structures, land, etc.
■ The value of a property depends on :
I. Nature of structure
II. Life
III. Maintenance
IV. Location
V. Bank interest
VI. Legal control
VII. Supply and demand
VIII.Purpose of valuation
Estimation
■ Estimation for any construction work may be defined as the process of
calculating the quantities and cost of various items required in connection with
the work.
■ Purpose of estimation:
I. Preliminary study of the project
II. Administrative approval
III. To investigate feasibility
IV. To get loan from bank
V. For insurance purpose
VI. For deciding taxes
VII. To decide rent of a building
Objects/Purpose of Valuation
■ Buying or Selling property
■ Security of loans
■ Rent fixation
■ Insurance
■ Taxation
■ Compulsory acquisition
■ Betterment charges
■ Speculation
■ Court fees
■ Gift tax
■ Balance sheet
Property income
■ Gross income – The total income from different sources is called gross income.
■ Net income – When outgoings are deducted from gross income it is called net
income.
■ Outgoing – The term outgoing is used to indicate the expenses which are to be
incurred in connection with the property so as to maintain the revenue from it.
Depreciation and Obsolescence
Depreciation Obsolescence
Physical loss in the value of the property due to
wear, tear and decay etc. is known as
depreciation.
Loss in the value of the property due to change in
design, in fashion, in structures, etc. is known as
obsolescence.
The decrease in the value of the property is
gradual and slow.
The value of property increase or decrease at a
rapid rate.
Depreciation depends on its original condition,
quality of maintenance and mode of use.
Obsolescence depends on normal progress in the
arts, inadequacy to present or growing needs, etc.
This is variable according to the age of the
property. More the age, more will be amount for
depreciation.
This is not dependent on age of the building. A
new building may suffer in its usual rent due to
obsolescence.
There are different methods by which the amount
of depreciation can be calculated.
At present there is no method of calculation of
obsolescence.
Methods of calculating Depreciation
■ Straight line method
■ Constant percentage method
■ Sinking fund method
■ Quantity survey method
Straight line method
■ In this method it is assumed that the property loses its value by the same amount every year. A
fixed amount of the original cost is deducted every year so that at the end of the utility period
only the scrap value is left.
■ D =
C−S
n
D = Annual depreciation
C = original cost
S = scrap value
N = life in year
■ Depreciation of the property after m years
=
C − S
n
× m = m × D
■ Book value after m years
= C −
C − s
n
× m = C − m × D
Constant percentage method
■ In this method it is assumed that the property will lose its value by a constant
percentage of tis value at the beginning of every year.
p = 1 −
S
C
1
n
p = percentage rate of annual depreciation
S = scrap value
C = original cost
n = life of years
Sinking fund method
■ In this method the depreciation of the property is assumed to be equal to the
annual sinking fund plus the interest on the sinking fund for that year.
■ A= Annual sinking fund
■ b,c,d,…etc. = interest on the sinking fund for the subsequent years.
■ C= original cost
Life in years Annual sinking
fund
Interest in
sinking fund
Depreciation
for that year
Total
depreciation
Book value
1 A - A A C –A
2 A b A+b 2A+b C – (2A+b)
3 A c A+c 3A+b+c C – (3A+b+c)
4 A d A+d 4A+b+c+d C – (4A+b+c+d)
So on…
If i is the rate of interest, annual sinking fund installment to accumulate 1 Rs. In
n years.
p =
i
(1+i)n−1
If i is the rate of interest and 1 Rs. Is deposited every year total sinking fund
accumulated at the end of n years is
q =
(1+i)n−1
i
Rate of depreciation in n years
= (p×q)%
The cost of newly constructed building was Rs. 150000. the life of building is 75
years. Determine the depreciation in the 30th year of life by straight line method,
constant % method, and sinking fund method at the 8% compound interest. The
scarp value of building is 10% of its construction cost.
■ C = Rs 150000
■ S = 0.10×150000 = 15000 Rs.
■ N= 75 years i = 8%
(i) straight line method
D =
C−S
n
=
150000 −15000
75
= 1800 𝑅𝑠.
 total depreciation after m = 30 years
= 18000×30 = 54000 Rs.
(ii) Constant percentage method
p = 𝐶
S
C
m
n
= 150000
15000
150000
30
75
= 150000 × 0.3981 = 59715 𝑅𝑠.
 Total depreciation after 30 years
(C- S) = 150000 – 59715 = 90285 Rs.
■ (iii) sinking fund method
(C – S) = 150000 – 15000 = 135000 Rs.
Sinking fund coefficient for 75 years life
p =
i
(1+i)n−1
=
0.08
(1+0.08)75−1
= 2.498 × 10−4
q =
(1+i)n−1
i
=
(1+0.08)30−1
0.08
= 113.28
Rate of depreciation for 30 years
p×q = 2.498 × 10−4 × 113.28 = 0.02829
Total depreciation in 30 years
(C – S)×0.02829 = 135000×0.02829 = 3819.15 Rs.
Different forms of value
1. Market value 9. Investment value
2. Book value 10. Sentimental value
3. Scrap value 11. Speculative value
4. Salvage value 12. Annual value
5. Accommodation value 13. Potential value
6. Distress value 14. Occupation value
7. Monopoly value 15. Present value
8. Replacement value
Factors affecting value of a property
■ Demand and supply
■ Maintenance
■ Rise in population
■ Abnormal condition
■ Cost of construction
■ Purpose of purchase
■ Town planning Act
■ Climatic condition
■ Life
■ Improvement by public schemes
■ Migration
■ Interest of schedule banks
Valuation tables and their uses
■ In order to save time and reduce the charges of error in elaborate and laborious mathematical
calculation the valuation tables are prepared so that by referring to them suitable coefficient can be
found out.
■ TABLE -1
■ To find the amount to which Rs. 1 will accumulate at the end of given number of years
Let, i = interest per annum on Rs. 1
Interest of Rs. 1 after 1 years = i
■ Amount receivable after 1 year = ( 1+i)
■ Amount receivable after 2 year = ( 1+ i) + (1 + i) i = 1+i + i +𝑖2= (1 + 𝑖)2 Rs.
■ For Rs. 1 amount receivable after n years.
= (1 + 𝑖) 𝑛 𝐶 = (1 + 𝑖) 𝑛
■ TABLE -2
■ To find the present value of Rs. 1 receivable at the end of a given number of years.
p =
1
(1+i)n
■ TABLE -3
■ To find the amount of annual sinking fund for the redemption of Rs. 1 capital instalment of S.F.
p =
i
(1+i)n−1
■ TABLE – 4
■ If Rs. 1 is invested every year how much amount will be accumulated after n years
q =
(1+i)n−1
i
■ Example: joinA and B properly
■ (1) On investment of Rs. 1/- amount receivable after 80 years @ 2%
= (1 + 𝑖) 𝑛 = (1 + 0.02)80 = 4.8754
(2) Present value of Rs. 1/- receivable after 70 years @ 3%
p =
1
(1+i)n =
1
(1+0.03)70 = 0.1263
(3) Amount receivable after 60 years @ 4% on investment of Rs. 1 every year
q =
(1+i)n−1
i
=
(1+0.04)60−1
0.04
= 237.9907
1 On investment of Rs. 1/- amount receivable after 80 years @ 2%
2 Present value of Rs. 1/- receivable after 70 years @ 3%
3 Amount receivable after 60 years @ 4% on investment of Rs. 1 every
year
4 Years purchase in 40 years @ 6%
5 Amount of sinking fund investment for redemption if Rs. 1 capital after
50 years @ 5%
■ (4) Years purchase in 40 years @ 6%
S. F. =
i
(1+i)n−1
=
0.06
(1+0.06)40−1
= 0.00646
𝑌. 𝑃. =
1
𝑖+𝑆.𝐹.
=
1
0.06+0.00646
= 15.0463
(5) Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5%
i
(1+i)n−1
=
0.05
(1+0.05)50−1
= 0.0048
1 4.8754
2 0.1263
3 237.99
4 15.0463
5 0.0048
Valuation methods for property and land
■ (A) Valuation methods for property
1. Rental method
2. Land and building based method
3. Profit based method
4. Development method
1. Rental method
■ In this method the net rental income from a property is calculated after deducting
all outgoings from the gross rent and years purchase is calculated after adopting
the current bank interest.
■ The valuation of a property is worked out as under.
■ Capitalized value = Net income ×year’s purchase
C.V.= N.I. × Y.P.
Net income = Net rent = Gross Rent – outgoing
When the rent from a property is known this method is useful for valuation of a
property.
This present value of land can be obtained as
1
(1+i)n
Value of property = value of land + value of building
2. Land and building based method
■ Properties which are used for special purpose outside the general range of
commercial and residential properties as for school police station or which
perform non- profitable community functions where there is no direct evidence
of income valuation of such properties are made by this method.
■ Valuation for under developed or owner occupied or vacant possession or
damaged properties may be done by this method of valuation.
■ Cost of new construction of building = total construction area×present rate of
construction
■ Calculate depreciated cost of building
■ Present value of property = cost of land + depreciated cost of building
3. Profit based method
■ This method of valuation is very similar to the rental method of valuation and is
most applicable in case of valuation of shops, hotels, cinemas, etc.
■ In tis method net profit is worked out after deducting all usual outgoings
including interest of capital investment and also remuneration of labour
rendered by owner.
■ Capitalized value = Net income × year's purchase
C.V. = N.I. ×Y.P.
Net income = total income - outgoing
4. Development method
■ Sometimes undeveloped or under developed property is bought
developed and then offered for sale. The valuation of such properties
would depend on initial investment development cost and expected profit.
■ This method of valuation is based on:
(a) Development of building estates
(b) Hypothetical building schemes
(a) Development of building estates
■ In this method an estate is developed with all the essential amenities and
sold out in small plots in most advantageous manner so that the estate is
worth more. When a city continues too expand then the land is known as
Ripe for building.
■ Valuation by development of building estates = present value – total
outgoings
(b) Hypothetical building schemes
■ In this method value of a vacant plot of land is estimated by capitalizing the
assumed rent that can be obtained from a building if erected on the land after
developing the same and then deducting the cost of development and building.
■ This is not a suitable method of valuation of land because the cost of land
depends on the magnitude of development of land.
B. Valuation method for open land
1. Comparative method
2. Hypothetical method
3. Belting method
1. Comparative Method
■ In this method the various transactions of nearby lands are property studied and then a fair rate
of land under consideration is decided.
■ Thus this method will be useful only in case of an active market where there are large number of
statistics are available for comparison.
■ Following factors are to be taken into account while analyzing value of land by this method.
(I) Situation
(II) Size
(III) Shape
(IV) Frontage and depth
(V) Front road width
(VI) Vistas
(VII)Nature of soil
2. Hypothetical Method
■ In this method value of a vacant plot of land is estimated by capitalizing the
assumed rent that can be obtained from a building.
■ If erected on the land after developing the same and then deducting the cost of
development and building.
■ This is not a suitable method of valuation of land because the cost of land
depends on the magnitude of development of land.
Valuation procedure
■ Permissible covered area = total area – (1/3) area of open space land
■ find, rental area = total area – 20 % for area of walls and wastes
■ Calculate net rent per month = gross rent – outgoing
■ Find outY.P.
■ Find out the cost of building from the total covered area and current
plinth area rent.
■ Workout the development cost of the land.
■ Find out the total cost of building and development cost.
■ Deduct the total cost of building and development cost.
3. Belting Method
■ When a plot of big size is to be
valued or when a plot with less
frontage and more depth is to be
valued it is logical to adopt the
method of belting.
■ It is due to the principle that the
value of land in general deceases
as the plot increases.
■ In this method whole area is to
be divided into the number of
belts.
Example: figure shows the plot of land. If width of first belt is 30 m and its
value is estimated to Rs. 100/sq.m. find value of the entire plot by belting
methodV1,V2,V3 ae the values and B1,B2,B3 are width.
■ Let us divide the plot in 6 parts
■ Width of first B1 =30 m
■ Width of second belt B2 = 1.5×30 = 45m
■ Width of third belt B3 = 125 -30 – 45 = 50m
■ BB1/30 = 40/125 BB1=9.6m
■ CC1/75= 40/125 CC1=24m
Plot no. Area Sq. m. Rate per Sq. m. Value of land Rs.
1 60×30 = 1800 V1 =100 180000
2 60×45 = 2700 V2 = 2/3×100=66.67 180009
3 60× 50 = 3000 V3 = 1/2×100 =50 150000
4 1/2×9.6×30=144 3/4×V1 =3/4×100 =75 10800
5 (9.6 + 24)×45/2 = 756 ¾ ×V2 = ¾ ×66.67 =50 37800
6 (24 + 40) ×50/2 = 1600 ¾ ×V3 = 3/4×50 = 37.5 60000
Total Rs. 618609
Types of Rent
■ Rent: Rent may be defined as an annual or periodic payment for the use of land or building
and land.
■ Various forms of rent are:
1. Standard rent 9. Contractual rent
2. Head rent 10. Nominal rent
3.Rack rent 11. Monopoly rent
4. Situation rent 12. Gross rent
5. Sitting rent 13. Net rent
6. Subsidized rent 14. Ground rent
7. Improved rent
8. Profit rent
Valuation

More Related Content

PPTX
Valuation part of Building
PDF
Valuation
PPTX
Valuation
PPTX
Types of Contract in Construction Management
PPTX
Purpose of Valuation
PDF
Design mannual for small scale irrigation scheme book
PPTX
Chapter 13 ( valuation)
PPTX
Valuation part of Building
Valuation
Valuation
Types of Contract in Construction Management
Purpose of Valuation
Design mannual for small scale irrigation scheme book
Chapter 13 ( valuation)

What's hot (20)

PPTX
Valuation
PPTX
Valuation in Civil Engineering
PPTX
Valuation - professional prractice and valuation
PPTX
Valuation(1)
PPTX
Estimating and costing
PPTX
Approximate estimate
PPTX
Types of estimates
PPTX
ESTIMATING AND COSTING
PDF
Prefabrication
PPTX
Damp proofing
PPT
Depreciation & obsolescence
PPTX
Estimating & Costing - I
PPTX
Analysis of rates
PDF
Types of Tender and their Process
PPT
TALL BUILDINGS
PPTX
Urban Roads
PPTX
Contract and Arbitration
PPTX
Rate analysis
PPTX
Valuation - Estimation, Costing and Valuation Engineering
PPTX
Tenders contract -arti
Valuation
Valuation in Civil Engineering
Valuation - professional prractice and valuation
Valuation(1)
Estimating and costing
Approximate estimate
Types of estimates
ESTIMATING AND COSTING
Prefabrication
Damp proofing
Depreciation & obsolescence
Estimating & Costing - I
Analysis of rates
Types of Tender and their Process
TALL BUILDINGS
Urban Roads
Contract and Arbitration
Rate analysis
Valuation - Estimation, Costing and Valuation Engineering
Tenders contract -arti
Ad

Similar to Valuation (20)

PPTX
Professional practice and Valuation (1).pptx
PPTX
Sppu be civil sem 8 qsct unit no. 04 valuation
PPTX
Valuation 08.04.2020
PPTX
Depreciation 2 (1)
PDF
Unit v depreciation
PPTX
Unit v depreciation
PDF
unit three.pdf
PPTX
engineering economics presentation1.pptx
PPT
EngEconPatel03NOV04.ppt
PPTX
Depreciation.pptx related to the Chemical Process Control And Instrumentation .
PPT
04_aktiva-tetap power point untuk materi
PPT
Engineering economics
PPTX
Qus 3205 sum of years digit depreciation method
PPTX
Engineering economics Slides for Postgraduates
PDF
RP 475 Chapt Three Final Process Economics.pdf
PPT
Financial accounting mgt101 power point slides lecture 18
PDF
Capital budgeting
PDF
Chapter 5 Depreciation Mathematic of Investement
PPT
Engineering economics slides discussing the depreciations and other factors.ppt
PPT
EMGT6225iyyruwiiaiiBHSHSUSUIIIOOO M1.ppt
Professional practice and Valuation (1).pptx
Sppu be civil sem 8 qsct unit no. 04 valuation
Valuation 08.04.2020
Depreciation 2 (1)
Unit v depreciation
Unit v depreciation
unit three.pdf
engineering economics presentation1.pptx
EngEconPatel03NOV04.ppt
Depreciation.pptx related to the Chemical Process Control And Instrumentation .
04_aktiva-tetap power point untuk materi
Engineering economics
Qus 3205 sum of years digit depreciation method
Engineering economics Slides for Postgraduates
RP 475 Chapt Three Final Process Economics.pdf
Financial accounting mgt101 power point slides lecture 18
Capital budgeting
Chapter 5 Depreciation Mathematic of Investement
Engineering economics slides discussing the depreciations and other factors.ppt
EMGT6225iyyruwiiaiiBHSHSUSUIIIOOO M1.ppt
Ad

More from Aditya Mistry (20)

PPTX
Traffic studies
PPTX
Earthquake design example
PPTX
Cross section of the canal, balancing depth and canal fsl
PPT
Urban transportation system
PPT
Water and Waste Water Engineering
PPT
Railway Bridge and Tunnel Engineering
PPT
Applied Fluid Mechanics
PPT
Advance Construction & Equipment
PPTX
Traffic control devices
PPTX
Shear strength of soil
PPTX
Stiffness Matrix
PPTX
Flood Management
PPTX
Air Pollution
PPTX
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
PPTX
Special concrete and concreting method
PPTX
Modern surveying instruments
PPTX
Earthquake resistant building
PPTX
Direct and bending stress
PPT
Temporary works
PPT
Notches and weir
Traffic studies
Earthquake design example
Cross section of the canal, balancing depth and canal fsl
Urban transportation system
Water and Waste Water Engineering
Railway Bridge and Tunnel Engineering
Applied Fluid Mechanics
Advance Construction & Equipment
Traffic control devices
Shear strength of soil
Stiffness Matrix
Flood Management
Air Pollution
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
Special concrete and concreting method
Modern surveying instruments
Earthquake resistant building
Direct and bending stress
Temporary works
Notches and weir

Recently uploaded (20)

PPTX
Real Estate Management PART 1.pptxFFFFFFFFFFFFF
PPTX
Software-Development-Life-Cycle-SDLC.pptx
PPT
Module_1_Lecture_1_Introduction_To_Automation_In_Production_Systems2023.ppt
PPTX
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
PDF
Performance, energy consumption and costs: a comparative analysis of automati...
PDF
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
PDF
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
PDF
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
PPTX
chapter 1.pptx dotnet technology introduction
PDF
THE PEDAGOGICAL NEXUS IN TEACHING ELECTRICITY CONCEPTS IN THE GRADE 9 NATURAL...
PPTX
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
PDF
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf
PPTX
Design ,Art Across Digital Realities and eXtended Reality
PPTX
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
PPTX
Soft Skills Unit 2 Listening Speaking Reading Writing.pptx
PDF
Software defined netwoks is useful to learn NFV and virtual Lans
PPTX
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
PDF
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
PPT
Basics Of Pump types, Details, and working principles.
Real Estate Management PART 1.pptxFFFFFFFFFFFFF
Software-Development-Life-Cycle-SDLC.pptx
Module_1_Lecture_1_Introduction_To_Automation_In_Production_Systems2023.ppt
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
Performance, energy consumption and costs: a comparative analysis of automati...
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
chapter 1.pptx dotnet technology introduction
THE PEDAGOGICAL NEXUS IN TEACHING ELECTRICITY CONCEPTS IN THE GRADE 9 NATURAL...
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf
Design ,Art Across Digital Realities and eXtended Reality
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
Soft Skills Unit 2 Listening Speaking Reading Writing.pptx
Software defined netwoks is useful to learn NFV and virtual Lans
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
Basics Of Pump types, Details, and working principles.

Valuation

  • 2. TOPIC NAME: VALUATION SUBJECT CODE: 2I70610 BRANCH: CIVIL ENGG,. 7TH SEM PREPARED BY: GUIDED BY: Prof. Pritesh Rathod Prof. Sunil Jaganiya
  • 3. content ■ Terms ■ Objects/purpose of valuation ■ Property income ■ Depreciation and Obsolescence ■ Methods of calculating Depreciation ■ Different forms of value ■ Factor affecting value of property ■ Valuation Tables and their uses ■ Valuation methods for property ■ Types of rent
  • 4. Terms ■ Cost – The term cost is used to indicate the actual amount incurred in producing a commodity. ■ Prime Cost – The expenditures or charges represented directly in the commodity produced are called the prime cost. ■ Supplementary cost – Other expenditures or charges like rent, management, services, salaries, depreciation, etc. represented indirectly in the production of the commodity are called the supplementary cost. ■ Value – Value means its worth or utility. ■ Price – The term price is used to indicate the cost of the commodity plus profit of the manufacturer.
  • 5. Valuation ■ Valuation is the art of estimating or determining the fair price or value of a property such as a building, a factory, other engineering structures, land, etc. ■ The value of a property depends on : I. Nature of structure II. Life III. Maintenance IV. Location V. Bank interest VI. Legal control VII. Supply and demand VIII.Purpose of valuation
  • 6. Estimation ■ Estimation for any construction work may be defined as the process of calculating the quantities and cost of various items required in connection with the work. ■ Purpose of estimation: I. Preliminary study of the project II. Administrative approval III. To investigate feasibility IV. To get loan from bank V. For insurance purpose VI. For deciding taxes VII. To decide rent of a building
  • 7. Objects/Purpose of Valuation ■ Buying or Selling property ■ Security of loans ■ Rent fixation ■ Insurance ■ Taxation ■ Compulsory acquisition ■ Betterment charges ■ Speculation ■ Court fees ■ Gift tax ■ Balance sheet
  • 8. Property income ■ Gross income – The total income from different sources is called gross income. ■ Net income – When outgoings are deducted from gross income it is called net income. ■ Outgoing – The term outgoing is used to indicate the expenses which are to be incurred in connection with the property so as to maintain the revenue from it.
  • 9. Depreciation and Obsolescence Depreciation Obsolescence Physical loss in the value of the property due to wear, tear and decay etc. is known as depreciation. Loss in the value of the property due to change in design, in fashion, in structures, etc. is known as obsolescence. The decrease in the value of the property is gradual and slow. The value of property increase or decrease at a rapid rate. Depreciation depends on its original condition, quality of maintenance and mode of use. Obsolescence depends on normal progress in the arts, inadequacy to present or growing needs, etc. This is variable according to the age of the property. More the age, more will be amount for depreciation. This is not dependent on age of the building. A new building may suffer in its usual rent due to obsolescence. There are different methods by which the amount of depreciation can be calculated. At present there is no method of calculation of obsolescence.
  • 10. Methods of calculating Depreciation ■ Straight line method ■ Constant percentage method ■ Sinking fund method ■ Quantity survey method
  • 11. Straight line method ■ In this method it is assumed that the property loses its value by the same amount every year. A fixed amount of the original cost is deducted every year so that at the end of the utility period only the scrap value is left. ■ D = C−S n D = Annual depreciation C = original cost S = scrap value N = life in year ■ Depreciation of the property after m years = C − S n × m = m × D ■ Book value after m years = C − C − s n × m = C − m × D
  • 12. Constant percentage method ■ In this method it is assumed that the property will lose its value by a constant percentage of tis value at the beginning of every year. p = 1 − S C 1 n p = percentage rate of annual depreciation S = scrap value C = original cost n = life of years
  • 13. Sinking fund method ■ In this method the depreciation of the property is assumed to be equal to the annual sinking fund plus the interest on the sinking fund for that year. ■ A= Annual sinking fund ■ b,c,d,…etc. = interest on the sinking fund for the subsequent years. ■ C= original cost
  • 14. Life in years Annual sinking fund Interest in sinking fund Depreciation for that year Total depreciation Book value 1 A - A A C –A 2 A b A+b 2A+b C – (2A+b) 3 A c A+c 3A+b+c C – (3A+b+c) 4 A d A+d 4A+b+c+d C – (4A+b+c+d) So on… If i is the rate of interest, annual sinking fund installment to accumulate 1 Rs. In n years. p = i (1+i)n−1 If i is the rate of interest and 1 Rs. Is deposited every year total sinking fund accumulated at the end of n years is q = (1+i)n−1 i Rate of depreciation in n years = (p×q)%
  • 15. The cost of newly constructed building was Rs. 150000. the life of building is 75 years. Determine the depreciation in the 30th year of life by straight line method, constant % method, and sinking fund method at the 8% compound interest. The scarp value of building is 10% of its construction cost. ■ C = Rs 150000 ■ S = 0.10×150000 = 15000 Rs. ■ N= 75 years i = 8% (i) straight line method D = C−S n = 150000 −15000 75 = 1800 𝑅𝑠.  total depreciation after m = 30 years = 18000×30 = 54000 Rs. (ii) Constant percentage method p = 𝐶 S C m n = 150000 15000 150000 30 75 = 150000 × 0.3981 = 59715 𝑅𝑠.  Total depreciation after 30 years (C- S) = 150000 – 59715 = 90285 Rs.
  • 16. ■ (iii) sinking fund method (C – S) = 150000 – 15000 = 135000 Rs. Sinking fund coefficient for 75 years life p = i (1+i)n−1 = 0.08 (1+0.08)75−1 = 2.498 × 10−4 q = (1+i)n−1 i = (1+0.08)30−1 0.08 = 113.28 Rate of depreciation for 30 years p×q = 2.498 × 10−4 × 113.28 = 0.02829 Total depreciation in 30 years (C – S)×0.02829 = 135000×0.02829 = 3819.15 Rs.
  • 17. Different forms of value 1. Market value 9. Investment value 2. Book value 10. Sentimental value 3. Scrap value 11. Speculative value 4. Salvage value 12. Annual value 5. Accommodation value 13. Potential value 6. Distress value 14. Occupation value 7. Monopoly value 15. Present value 8. Replacement value
  • 18. Factors affecting value of a property ■ Demand and supply ■ Maintenance ■ Rise in population ■ Abnormal condition ■ Cost of construction ■ Purpose of purchase ■ Town planning Act ■ Climatic condition ■ Life ■ Improvement by public schemes ■ Migration ■ Interest of schedule banks
  • 19. Valuation tables and their uses ■ In order to save time and reduce the charges of error in elaborate and laborious mathematical calculation the valuation tables are prepared so that by referring to them suitable coefficient can be found out. ■ TABLE -1 ■ To find the amount to which Rs. 1 will accumulate at the end of given number of years Let, i = interest per annum on Rs. 1 Interest of Rs. 1 after 1 years = i ■ Amount receivable after 1 year = ( 1+i) ■ Amount receivable after 2 year = ( 1+ i) + (1 + i) i = 1+i + i +𝑖2= (1 + 𝑖)2 Rs. ■ For Rs. 1 amount receivable after n years. = (1 + 𝑖) 𝑛 𝐶 = (1 + 𝑖) 𝑛
  • 20. ■ TABLE -2 ■ To find the present value of Rs. 1 receivable at the end of a given number of years. p = 1 (1+i)n ■ TABLE -3 ■ To find the amount of annual sinking fund for the redemption of Rs. 1 capital instalment of S.F. p = i (1+i)n−1 ■ TABLE – 4 ■ If Rs. 1 is invested every year how much amount will be accumulated after n years q = (1+i)n−1 i
  • 21. ■ Example: joinA and B properly ■ (1) On investment of Rs. 1/- amount receivable after 80 years @ 2% = (1 + 𝑖) 𝑛 = (1 + 0.02)80 = 4.8754 (2) Present value of Rs. 1/- receivable after 70 years @ 3% p = 1 (1+i)n = 1 (1+0.03)70 = 0.1263 (3) Amount receivable after 60 years @ 4% on investment of Rs. 1 every year q = (1+i)n−1 i = (1+0.04)60−1 0.04 = 237.9907 1 On investment of Rs. 1/- amount receivable after 80 years @ 2% 2 Present value of Rs. 1/- receivable after 70 years @ 3% 3 Amount receivable after 60 years @ 4% on investment of Rs. 1 every year 4 Years purchase in 40 years @ 6% 5 Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5%
  • 22. ■ (4) Years purchase in 40 years @ 6% S. F. = i (1+i)n−1 = 0.06 (1+0.06)40−1 = 0.00646 𝑌. 𝑃. = 1 𝑖+𝑆.𝐹. = 1 0.06+0.00646 = 15.0463 (5) Amount of sinking fund investment for redemption if Rs. 1 capital after 50 years @ 5% i (1+i)n−1 = 0.05 (1+0.05)50−1 = 0.0048 1 4.8754 2 0.1263 3 237.99 4 15.0463 5 0.0048
  • 23. Valuation methods for property and land ■ (A) Valuation methods for property 1. Rental method 2. Land and building based method 3. Profit based method 4. Development method
  • 24. 1. Rental method ■ In this method the net rental income from a property is calculated after deducting all outgoings from the gross rent and years purchase is calculated after adopting the current bank interest. ■ The valuation of a property is worked out as under. ■ Capitalized value = Net income ×year’s purchase C.V.= N.I. × Y.P. Net income = Net rent = Gross Rent – outgoing When the rent from a property is known this method is useful for valuation of a property. This present value of land can be obtained as 1 (1+i)n Value of property = value of land + value of building
  • 25. 2. Land and building based method ■ Properties which are used for special purpose outside the general range of commercial and residential properties as for school police station or which perform non- profitable community functions where there is no direct evidence of income valuation of such properties are made by this method. ■ Valuation for under developed or owner occupied or vacant possession or damaged properties may be done by this method of valuation. ■ Cost of new construction of building = total construction area×present rate of construction ■ Calculate depreciated cost of building ■ Present value of property = cost of land + depreciated cost of building
  • 26. 3. Profit based method ■ This method of valuation is very similar to the rental method of valuation and is most applicable in case of valuation of shops, hotels, cinemas, etc. ■ In tis method net profit is worked out after deducting all usual outgoings including interest of capital investment and also remuneration of labour rendered by owner. ■ Capitalized value = Net income × year's purchase C.V. = N.I. ×Y.P. Net income = total income - outgoing
  • 27. 4. Development method ■ Sometimes undeveloped or under developed property is bought developed and then offered for sale. The valuation of such properties would depend on initial investment development cost and expected profit. ■ This method of valuation is based on: (a) Development of building estates (b) Hypothetical building schemes
  • 28. (a) Development of building estates ■ In this method an estate is developed with all the essential amenities and sold out in small plots in most advantageous manner so that the estate is worth more. When a city continues too expand then the land is known as Ripe for building. ■ Valuation by development of building estates = present value – total outgoings
  • 29. (b) Hypothetical building schemes ■ In this method value of a vacant plot of land is estimated by capitalizing the assumed rent that can be obtained from a building if erected on the land after developing the same and then deducting the cost of development and building. ■ This is not a suitable method of valuation of land because the cost of land depends on the magnitude of development of land.
  • 30. B. Valuation method for open land 1. Comparative method 2. Hypothetical method 3. Belting method
  • 31. 1. Comparative Method ■ In this method the various transactions of nearby lands are property studied and then a fair rate of land under consideration is decided. ■ Thus this method will be useful only in case of an active market where there are large number of statistics are available for comparison. ■ Following factors are to be taken into account while analyzing value of land by this method. (I) Situation (II) Size (III) Shape (IV) Frontage and depth (V) Front road width (VI) Vistas (VII)Nature of soil
  • 32. 2. Hypothetical Method ■ In this method value of a vacant plot of land is estimated by capitalizing the assumed rent that can be obtained from a building. ■ If erected on the land after developing the same and then deducting the cost of development and building. ■ This is not a suitable method of valuation of land because the cost of land depends on the magnitude of development of land.
  • 33. Valuation procedure ■ Permissible covered area = total area – (1/3) area of open space land ■ find, rental area = total area – 20 % for area of walls and wastes ■ Calculate net rent per month = gross rent – outgoing ■ Find outY.P. ■ Find out the cost of building from the total covered area and current plinth area rent. ■ Workout the development cost of the land. ■ Find out the total cost of building and development cost. ■ Deduct the total cost of building and development cost.
  • 34. 3. Belting Method ■ When a plot of big size is to be valued or when a plot with less frontage and more depth is to be valued it is logical to adopt the method of belting. ■ It is due to the principle that the value of land in general deceases as the plot increases. ■ In this method whole area is to be divided into the number of belts.
  • 35. Example: figure shows the plot of land. If width of first belt is 30 m and its value is estimated to Rs. 100/sq.m. find value of the entire plot by belting methodV1,V2,V3 ae the values and B1,B2,B3 are width.
  • 36. ■ Let us divide the plot in 6 parts ■ Width of first B1 =30 m ■ Width of second belt B2 = 1.5×30 = 45m ■ Width of third belt B3 = 125 -30 – 45 = 50m ■ BB1/30 = 40/125 BB1=9.6m ■ CC1/75= 40/125 CC1=24m Plot no. Area Sq. m. Rate per Sq. m. Value of land Rs. 1 60×30 = 1800 V1 =100 180000 2 60×45 = 2700 V2 = 2/3×100=66.67 180009 3 60× 50 = 3000 V3 = 1/2×100 =50 150000 4 1/2×9.6×30=144 3/4×V1 =3/4×100 =75 10800 5 (9.6 + 24)×45/2 = 756 ¾ ×V2 = ¾ ×66.67 =50 37800 6 (24 + 40) ×50/2 = 1600 ¾ ×V3 = 3/4×50 = 37.5 60000 Total Rs. 618609
  • 37. Types of Rent ■ Rent: Rent may be defined as an annual or periodic payment for the use of land or building and land. ■ Various forms of rent are: 1. Standard rent 9. Contractual rent 2. Head rent 10. Nominal rent 3.Rack rent 11. Monopoly rent 4. Situation rent 12. Gross rent 5. Sitting rent 13. Net rent 6. Subsidized rent 14. Ground rent 7. Improved rent 8. Profit rent