Skip to content

chore: update generator logic for nodejs_gapic_combined_pkg rule, and update templates #1981

chore: update generator logic for nodejs_gapic_combined_pkg rule, and update templates

chore: update generator logic for nodejs_gapic_combined_pkg rule, and update templates #1981

Triggered via pull request September 23, 2025 16:58
Status Failure
Total duration 2m 51s
Artifacts

ci.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 1 notice
lint
Process completed with exit code 1.
test (24)
Process completed with exit code 1.
test (20)
Process completed with exit code 1.
test (20)
The strategy configuration was canceled because "test._24" failed
docs
Process completed with exit code 1.
test (22)
The operation was canceled.
test (22)
The strategy configuration was canceled because "test._24" failed
test (18)
The operation was canceled.
test (18)
The strategy configuration was canceled because "test._24" failed
windows
Process completed with exit code 1.
windows
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677