Supply Project Timeline Overview

This document outlines a proposed program of works including 9 tasks from a letter of intent through to the construction of a barrage with start and end dates and durations for each task. The tasks are to be completed from June 1999 through June 2001.

Uploaded by

Assem Elhajj
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views2 pages

Supply Project Timeline Overview

This document outlines a proposed program of works including 9 tasks from a letter of intent through to the construction of a barrage with start and end dates and durations for each task. The tasks are to be completed from June 1999 through June 2001.

Uploaded by

Assem Elhajj
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Task 1) Letter of Intent 2) Detailed Investigation 3) Submission of Report 4) Award of Contract 5) Detail Engineering Design 6) General Mobilisation 7) Construction

pipeline 8) Supply Water 9) Construction of Barrage

Start Date 7/1/1999 7/1/1999 9/28/1999 10/7/1999 10/21/1999 8/30/1999 12/19/1999 10/13/2000 12/19/1999

Duration in days 10

End Date 7/1/1999

90 9/28/1999 10 10/7/1999 15 ###### 60 ###### 180 ###### 300 ###### Formular in B9 = 10 ###### 450 3/13/2001 Formular in B11=

Proposed Programme of Works

1) Letter of Intent 2) Detailed Investigation


3) Submission of Report

4) Award of Contract
5) Detail Engineering Design

6) General Mobilisation
7) Construction pipeline

8) Supply Water 9) Construction of Barrage


Jun/1999 Dec/1999 Jun/2000

Year

+D7 +D7

Dec/2000

Jun/2001