0% found this document useful (0 votes)
751 views1 page

QCF009 Insp Report-Precast Concrete

This inspection report documents a pre-cast concrete pour for a main element. It records details of the pre-placement inspection such as formwork, steel reinforcement, and lighting. It also documents the post-concreting inspection including curing method, surface condition, and approval to lift and store the element. The report is signed off by representatives of the subcontractor, contractor, and client to indicate acceptance.

Uploaded by

minhnn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
751 views1 page

QCF009 Insp Report-Precast Concrete

This inspection report documents a pre-cast concrete pour for a main element. It records details of the pre-placement inspection such as formwork, steel reinforcement, and lighting. It also documents the post-concreting inspection including curing method, surface condition, and approval to lift and store the element. The report is signed off by representatives of the subcontractor, contractor, and client to indicate acceptance.

Uploaded by

minhnn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

TECHNIP CONSORTIUM

INSPECTION REPORT FOR PRE-CAST CONCRETE


LOCATION & CONSTRUCTION UNIT: CONCRETE GRADE: PRECAST ELEMENT NO.: TYPE & BRIEF DESCRIPTION:

FORM No. SUBC. No. SHEET:


DATE OF POUR: REF. DRAWING: MAIN ELEMENT

QCF 009 ______________ _____ o f ______

PRE PLACEMENT INSPECTION DESCRIPTION


SURVEY & LAYOUT FORM LINE & GRADE FORM CLEAN UP OR COATING (OIL OR SEALER) STEEL REINFORCEMENT EMBEDMENTS (ANCHOR BOLTS, PLATES, etc.) POUR CLEAN UP (WASHED or BLOWN) LIGHTING FOR NIGHT PLACEMENT VIBRATORS & SPARES OTHER AUXILLARY EQUIPT IFC Drawings IFC Drawing Must be clean Must be in place Must be available REF. ACCEPTANCE CRITERIA

SIGNATURE & DATE


SUBCONTR.
CONTRACTOR
CLIENT/PMC

POST CONCRETING INSPECTION


CURING METHOD: Water or Membrane CURING AGE DAYS TIE HOLE / TIE BAR HONEYCOMB CONDITION OF SURFACE CRACKS GROUT LOSS OTHER CHAMPERS JOINTS (DILATATION / CONSTRUCTION) MAKE GOOD MINOR SURFACE DEFECTS SURVEYORS CHECK STRUCTURE & OTHER INSERTS SURVEY RECORD NO. LOCATION LEVEL NONE 50 mm cover NONE REMOVAL OF FORMWORK ON:

IDENTIFICATION, COATING AND MARKING APPROVAL TO LIFT & STORAGE

REMARKS:

ACCEPTED

NOT ACCEPTED

INSPECTED BY: Name (Subcontractor) Signed Date

INSPECTED BY: Name (Contractor) Signed Date

INSPECTED BY: Name (Client) Signed Date