0% found this document useful (0 votes)
240 views1 page

NCR Format

A site non-conformance report was issued on July 21, 2014 for a mechanical discipline issue. The report details the preparer's name and position and includes sections to note the disposition, corrective action taken, and verification for release of the non-conformance report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
240 views1 page

NCR Format

A site non-conformance report was issued on July 21, 2014 for a mechanical discipline issue. The report details the preparer's name and position and includes sections to note the disposition, corrective action taken, and verification for release of the non-conformance report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Report:

SITE/NCR/001
SITE NON CONFORMANCE REPORT
Date:
DISCIPLINE : Mechanical REPORT No : Site/NCR/001 DATE : 21.07.14
QCP No. : QCP Phase No. :


Prepared by: Name: Position: Sign. Date:
DISPOSITION
Use as is Repair Rework Reject
Void ttachment : !es No
Prepared by: Name: Position: Sign. Date:
CORRECTIE ACTION TA!EN
Prepared by: Name: Position: Sign. Date:
ERIFICATION FOR RELEASE OF NCR
Prepared by: Name: Position: Sign. Date:
Re"ease# $% :

Sign:
Date:
Page " o# "

You might also like