REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
TAHUN ANGGARAN 2016
PAKET PEKERJAAN
LOKASI
: PERENCANAAN MASTERPLAN RTH PERKOTAAN
:
TAHUN ANGGARAN
: 2016
JUMLAH
No.
U R A I A N
( Rp. )
II
BIAYA LANGSUNG PERSONIL :
A. Professional Staf
B. Supporting Staf
136,000,000.00
44,000,000.00
Rp.
180,000,000.00
Rp.
Rp.
Rp.
Rp.
4,000,000.00
18,800,000.00
45,000,000.00
6,300,000.00
Rp.
74,100,000.00
Real Cost = Rp.
254,100,000.00
PPN 10 % = Rp.
25,410,000.00
BIAYA LANGSUNG NON PERSONIL :
A. Biaya Peralatan & Perlengkapan
B. Biaya Transportasi
C. Biaya Peralatan dan Bahan
D. Biaya Pelaporan
Jumlah Total =
Terbilang :
Rp.
Rp.
Rp.
279,510,000.00
Dibulatkan = Rp.
279,510,000.00
Dua Ratus Tujuh Puluh Sembilan Juta Lima Ratus
Sepuluh Ribu 0 Rupiah
DAFTAR KUANTITAS HARGA
PEKERJAAN
LOKASI
TAHUN ANGGARAN
I.
BIAYA LANGSUNG PERSONIL
NO
A.
: PERENCANAAN MASTERPLAN RTH PERKOTAAN
:
: 2016
JABATAN
PERSONIL WAKTU HARGA SATUAN
(ORANG) (BULAN)
(Rp.)
JUMLAH HARGA
(Rp.)
PROFESSIONAL STAFF
Team Leader (Ahli PWK)
1.00
Rp. 10,000,000.00
Rp.
40,000,000.00
Ahli Arsitektur
1.00
Rp.
8,000,000.00
Rp.
32,000,000.00
Ahli Pemetaan / GIS
1.00
Rp.
8,000,000.00
Rp.
32,000,000.00
Ahli Lingkungan / Teknik Sipil
1.00
Rp.
8,000,000.00
Rp.
32,000,000.00
= Rp.
136,000,000.00
Sub Total A
B.
SUPPORTING STAFF
Surveyor
1.00
Rp.
4,000,000.00
Rp.
16,000,000.00
Administrasi
1.00
Rp.
3,000,000.00
Rp.
12,000,000.00
Drafter
1.00
Rp.
4,000,000.00
Rp.
16,000,000.00
Sub Total B = Rp.
44,000,000.00
II. BIAYA LANGSUNG NON PERSONIL
No.
URAIAN
JUMLAH
WAKTU
( Bulan )
VOLUME
HARGA SATUAN
JUMLAH HARGA
A . BIAYA OPERASIONAL KANTOR
1
Sewa Komputer + Printer A4
1.00
UB
Rp.
250,000.00 Rp.
1,000,000.00
Printer A3
1.00
UB
Rp.
250,000.00 Rp.
1,000,000.00
Alat Tulis Kantor
1.00
Ls
Rp.
2,000,000.00 Rp.
2,000,000.00
Sub Total A = Rp.
4,000,000.00
B . BIAYA TRANSPORTASI
1
Sewa Kendaraan Roda 2 (Dua)
1.00
UB
Rp.
700,000.00 Rp.
2,800,000.00
Sewa Kendaraan Roda 4 (Empat)
1.00
UB
Rp.
4,000,000.00 Rp.
16,000,000.00
Sub Total B = Rp.
###
C. BIAYA PERALATAN DAN BAHAN
1
Pembelian Citra Archive
2.00
Scan
Rp. 10,000,000.00 Rp.
20,000,000.00
Total Station / GPS Geodetic
1.00
Pkt
Rp. 15,000,000.00 Rp.
15,000,000.00
Peralatan Survey
1.00
Pkt
Rp. 10,000,000.00 Rp.
10,000,000.00
Sub Total A = Rp.
D.
###
BIAYA PELAPORAN
Laporan Bulanan
3.00
Buku
Rp.
300,000.00 Rp.
3,600,000.00
Laporan Akhir
3.00
Buku
Rp.
500,000.00 Rp.
1,500,000.00
Dokumentasi
3.00
Ls
Rp.
400,000.00 Rp.
1,200,000.00
Sub Total C = Rp.
6,300,000.00
Copy Sheet ini Ke File Anda
### Dua
Ratus
Tujuh
Sesuaikan selPuluh
yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda
Sembilan
Juta Lima
0
Ratus
1
Sepuluh
2
Ribu
0
3
Rupiah
4
5
6
7
8
9
Sheet anda
279510000
Satu
Dua
Tiga
Empat
Lima
Enam
Tujuh
Delapan
Sembilan
Sepuluh Ribu
Lima Ratus
Sembilan Juta
Tujuh Puluh
Dua Ratus
29-Apr-00
279
510
000
Milyaran
Jutaan
Ribuan
Ratusan
2.8E+008