Project:
ETAP
2 x 660 MW NCC POWER PROJECT
7.1.0C
Page:
63
Location:
INDIA
Date:
04-23-2012
Contract:
NCC
SN:
L&TS&LIND1
Engineer:
KEC-ELECTRICAL
Revision:
Base
Filename:
NORMAL
Config.:
Case 2.2
Fault at bus:
Nominal kV
Voltage c Factor
Study Case: SC1
GRID BUS
= 400.000
= 1.05 (User-Defined)
Contribution
From Bus
ID
3-Phase Fault
To Bus
ID
GRID BUS
Total
GENERATOR
BUS#1
GENERATOR
BUS#2
GRID
%V
From Bus
kA
Symm. rms
% Voltage at From Bus
Va
Vb
Vc
kA Symm. rms
Ia
3I0
0.00
50.087
0.00
106.46
105.70
44.406
GRID BUS
42.36
3.316
72.66
72.73
96.38
4.920
GRID BUS
41.86
3.277
72.47
72.53
96.38
4.896
100.00
43.500
100.00
100.00
100.00
34.596
GRID BUS
Initial Symmetrical Current (kA, rms)
Peak Current (kA), Method C
Breaking Current (kA, rms, symm)
Steady State Current (kA, rms)
:
:
:
:
3-Phase
50.087
130.194
46.799
Positive & Zero Sequence Impedances
Looking into "From Bus"
Line-To-Ground Fault
L-G
44.406
115.426
44.406
44.406
# Indicates a fault current contribution from a three-winding transformer
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
L-L
43.153
112.170
43.153
43.153
44.406
R1
% Impedance on 100 MVA base
X1
R0
X0
1.82E-002
3.02E-001
1.97E-002
4.15E-001
9.079 *
8.80E-002
4.57E+000
4.06E-002
2.03E+000
9.079 *
8.76E-002
4.62E+000
4.06E-002
2.03E+000
2.32E-002
3.48E-001
4.67E-002
7.01E-001
26.259
L-L-G
47.838
124.349
47.838
47.838