Power Fault Analysis Report

This document provides a fault current study for a 660 MW power project in India. It analyzes faults at the GRID BUS including 3-phase, line-to-ground, line-to-line, and line-to-line-to-ground faults. The fault currents contributed by the GENERATOR BUSSES and GRID are reported in kA and percentages. Positive and zero sequence impedances into the GRID BUS are also provided.

Uploaded by

386
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views1 page

Power Fault Analysis Report

This document provides a fault current study for a 660 MW power project in India. It analyzes faults at the GRID BUS including 3-phase, line-to-ground, line-to-line, and line-to-line-to-ground faults. The fault currents contributed by the GENERATOR BUSSES and GRID are reported in kA and percentages. Positive and zero sequence impedances into the GRID BUS are also provided.

Uploaded by

386
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project:

ETAP

2 x 660 MW NCC POWER PROJECT

7.1.0C

Page:

63

Location:

INDIA

Date:

04-23-2012

Contract:

NCC

SN:

L&TS&LIND1

Engineer:

KEC-ELECTRICAL

Revision:

Base

Filename:

NORMAL

Config.:

Case 2.2

Fault at bus:
Nominal kV
Voltage c Factor

Study Case: SC1

GRID BUS
= 400.000
= 1.05 (User-Defined)
Contribution

From Bus
ID

3-Phase Fault
To Bus
ID

GRID BUS

Total

GENERATOR
BUS#1
GENERATOR
BUS#2
GRID

%V
From Bus

kA
Symm. rms

% Voltage at From Bus


Va
Vb
Vc

kA Symm. rms
Ia
3I0

0.00

50.087

0.00

106.46

105.70

44.406

GRID BUS

42.36

3.316

72.66

72.73

96.38

4.920

GRID BUS

41.86

3.277

72.47

72.53

96.38

4.896

100.00

43.500

100.00

100.00

100.00

34.596

GRID BUS

Initial Symmetrical Current (kA, rms)


Peak Current (kA), Method C
Breaking Current (kA, rms, symm)
Steady State Current (kA, rms)

:
:
:
:

3-Phase
50.087
130.194
46.799

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault

L-G
44.406
115.426
44.406
44.406

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer

L-L
43.153
112.170
43.153
43.153

44.406

R1

% Impedance on 100 MVA base


X1
R0

X0

1.82E-002

3.02E-001

1.97E-002

4.15E-001

9.079 *

8.80E-002

4.57E+000

4.06E-002

2.03E+000

9.079 *

8.76E-002

4.62E+000

4.06E-002

2.03E+000

2.32E-002

3.48E-001

4.67E-002

7.01E-001

26.259
L-L-G
47.838
124.349
47.838
47.838