Building Construction Quotation Details

This document provides construction cost quotations and details for building construction from R.C. Construction in Chennai, India. It includes specifications for basement level work including excavation depths and concrete mixes. It also details lintel, roofing, electrical, plumbing, flooring, woodwork, painting and other construction aspects. Payment is in installments with 10% advanced and the remainder split between construction phases up to completion.

Uploaded by

Albert Pizarro
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
85% found this document useful (34 votes)
128K views5 pages

Building Construction Quotation Details

This document provides construction cost quotations and details for building construction from R.C. Construction in Chennai, India. It includes specifications for basement level work including excavation depths and concrete mixes. It also details lintel, roofing, electrical, plumbing, flooring, woodwork, painting and other construction aspects. Payment is in installments with 10% advanced and the remainder split between construction phases up to completion.

Uploaded by

Albert Pizarro
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Building Construction Contract Quotations
  • Material and Steel Details
  • Cement and Sand Ratios
  • Wood and Electrical Works
  • Miscellaneous and Payment Details

Cell : 9677272267 7200501300

Sri Malmalayanur Prameswari Thunai

R.C. CONSTRUCTION
No.4, First Floor, [Link] Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : rcconstructionschennai@[Link] / [Link] constructions in [Link]

BUILDING CONSTRUCTION CONTRACT QUOTATIONS


Construction Cost of Building with Materials
1. Incase of Continuous column & Footings Foundation with load bearing wall structure Per [Link] Incase of Dummy column & Footing foundation with load bearing wall structure Per [Link]

Rs.

2.

Rs.

BASEMENT LEVEL WORK DETAILS


Earth work excavation for column foundation : Depth of River sand filling for column Foundation : Depth of plain cement concrete (PCC) using 1 size Blue Granite metal for column foundation bed concreting work :

46" x 36" x 36" 3 inch

9 inch

DETAILS OF STEELS USED FOR COLUMN & FOOTING AND COLUMN BED 1. Column : Main Rod 12 mm dia @ 6 Nos Stirrups Rod (Rings) 6mm dia @ 9" c/c

2.

Column bed : Main rod & Distribution rod 8mm dia @ 6" c/c Depth of Bed concrete RCC [Link] mix column : 4 inch Depth of Bed Concrete RCC [Link] mix for column footing Tapper portion : 6 inch Depth of RCC Tie Beam above Ground Level for sitting of Basement & superstructure : 1 feet

Cell : 9677272267 7200501300


Sri Malmalayanur Prameswari Thunai

R.C. CONSTRUCTION
No.4, First Floor, [Link] Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : rcconstructionschennai@[Link] / [Link] constructions in [Link]

DETAILS OF STEELS USED FOR TIE BEAM 1. 2.


Main rod

12 mm dia @ 5 Nos

Distribution rod (Rings) : 8mm dia @ 9" c/c Height of Basement level brick work above Tie Beam level : Total Height of Basement including Tie Beam above Ground level Depth of Earth filling in Basement : Depth of River sand filling in Basement : Depth of plain cement concrete (PCC) in Basement :

2 feet : 3 feet 2 feet 2 inch 4 inch

ABOVE BASEMENT TO LINTEL & ROOFING LEVEL DETAILS


Height of Lintel above Basement Height of Roof above Basement Thickness of Roof concrete Main Rods Stirrups (Rings) : :

: :

7 feet 10 feet : 4 inch

1. 2.

8mm dia 4 Nos 6mm dia 9" c/c

STEEL DESIGN OF ROOF 1. Main rods 2. Distribution Rod

: :

10 mm dia 6" c/c 8mm dia 8" c/c

CONCRETE MIX RATIO FOR CONCRETE WORKS 1. Plain Cement concre work i.e cement : Sand : 1 Blue Metal (Jelly) : : 1 Bond 5 Bond 7 Bond [Link] mix

Cell : 9677272267 7200501300


Sri Malmalayanur Prameswari Thunai

R.C. CONSTRUCTION
No.4, First Floor, [Link] Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : rcconstructionschennai@[Link] / [Link] constructions in [Link]

2.

Reniforcement Cement Concrete work i.e cement : Sand : Blue metal (Jelly) :

: [Link] mix 1 Bond 2 Bond 3 Bond

CEMENT AND RIVER SAND RATIO FOR USING IN BRICK WORK & PLASTERING WORK

Brick work i.e 1 Bond Cement 6 Bond Sand Plastering i.e 1 Bond - Cement 4 Bond Sand

1:6 mix

1:4 mix

PROVISION OF ITEMS IN EACH ROOMS


Each Room only one cupboard (size 46" x 70") will be provided with cuddapah slab Each room only one loft in any one side of the room will be provided. In Verandah, shoe cupboard (size 30" x 26") will cuddapah slab will be provided. In Hall ceiling finishing with Border work will be provided on 4 sides. In Kitchen, kitchen Platform finishing with Granite slab Top with cuddapah sink Kitchen counter boil finished with wall Tiles 3 feet height.

FLOORING

Provided ceramic floor tiles in all room, (Tile cost per sqft Rs.30/-) and Provided ceramic wall tiles in Bath, Wc: (Tile cost per [Link] Rs.20/-) Any other flooring to be made, difference in cost of tiles & labour and other materials to be paid by the building owner. In Bath room inside wall finished with ceramic wall tiles 7 feet height above floor level, and rough finished ceramic floor tiles for flooring. In wc inside wall finished with ceramic wall tiles 4 feet height above floor level and Rough finished ceramic floor tiles for flooring.

Cell : 9677272267 7200501300


Sri Malmalayanur Prameswari Thunai

R.C. CONSTRUCTION
No.4, First Floor, [Link] Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : rcconstructionschennai@[Link] / [Link] constructions in [Link]

WOOD WORK

Main Door (size 36" x 70") using with teak frame & paneled shutter and finishing complete. Inside other Doors using with country wood (kongu) frame & water proof flush shutters and finishing complete. Inside windows using with country wood (kongu) frame & Iron grills and glazed shutters using with 2nd quality Teak wood and finishing complete. All Room windows size (40" x 40") In kitchen window size (30" x 26") In bath & WC ventilator size (20" x 16") In bath & WC provided with sintex doors.

ELECTRICAL WORKS DETAILS


Each rooms Except pooja 5 power points will be provided. More than 5 Power points, each points cost in Rs. 400/- paid by the building owners.

PAINTING WORK

All inside rooms wall surface painted with best quality acrylic emulsion wall paint (Asian) over one coat of JK white cement paint. All outers walls surface painted with best quality supercem cement paint, over one coat of JK white cement paint. Wooden& Steel works are painted with Acrylic paints (Asian) over one coat of primer. Colouring choice by building owner Responsibility.

OVER HEAD TANK AND PLUMBING WORKS DETAILS

Construction of Over head tank (Size 50" x 40" x 40")

Cell : 9677272267 7200501300


Sri Malmalayanur Prameswari Thunai

R.C. CONSTRUCTION
No.4, First Floor, [Link] Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : rcconstructionschennai@[Link] / [Link] constructions in [Link]

For all plumbing works (in bath room, Toilet, Wash Bain, kitchen, sink etc) the first quality branded materials will be used for concelled pipeline works for all water line inside the building. Wash basin provision; closet provision. All waste line will be connected to main chamber Drainage lines using superior grade plastic pipes (Parry ware white ceramic fittings Metro tap fittings)

MISCELLANEOUS The contractor Responsibility for below item. Heir charges for concrete mixer machine. Heir charges for ladder Water curing work etc.

MORE OF PAYMENT Advance Upto Basement level Upto Lintel level Upto Roof level Upto Inside wall plastering work Upto outside wall plastering work On handing over of possession : : : : : : : 10% of total construction cost 25% of total construction cost 10% of total construction cost 25% of total construction cost 15% of total construction cost 10% of total construction cost 5% of total construction cost

Common questions

Powered by AI

Concrete mix ratios such as 1:2:4 for Reinforced Cement Concrete (RCC) and 1:4:8 for PCC ensure the concrete's strength and stability, directly impacting the structural integrity. Similarly, plastering mix ratios of 1:6 for brickwork and 1:4 for cement surface provide an even, strong finish resistant to chipping and wear. These precise mixtures determine the material's durability, handling various loads, and environmental conditions while ensuring long-term resilience, thus influencing the overall quality, lifespan, and maintenance requirements of the construction .

The document outlines the use of first-quality branded materials for concealed pipelines, which are critical for preventing leaks and ensuring durability. Issues may arise from improper material selection, incorrect installation, or non-compliance with quality standards. These challenges can be mitigated by ensuring adherence to the use of specified superior-grade plastic pipes for drainage coupled with branded ceramic fittings and routine quality checks during installation to verify compliance with specifications .

According to the document, each room includes one cupboard with a Cuddapah slab and a single loft option. Verandahs have a shoe cupboard with a Cuddapah slab provided. Kitchens feature a platform with a granite slab top and a Cuddapah sink, and the walls are tiled up to a 3-foot height. These specifications optimize the functionality of interior spaces by providing necessary storage, hygienic surfaces, and easy maintenance features which enhance the overall usability and practicality of the building .

The contractor's responsibilities include providing concrete mixers, ladders, and managing water curing work as part of the construction process. This indicates the contractor's role in ensuring that all necessary resources and procedures are effectively managed to maintain construction quality and efficiency. Such responsibilities ensure that the contractor remains accountable for site readiness and the continuity of work processes, potentially reducing project delays and ensuring consistency in material application and structural integrity .

The basement construction involves several steps starting with earthwork excavation for the column foundation, measuring 4’6" x 3’6" x 3’6". After excavation, a 3-inch depth of river sand filling is applied, followed by a 9-inch deep plain cement concrete (PCC) bed made using 1½” size Blue Granite metal. The steel used for the tie beam includes a main rod of 12 mm diameter with 5 Nos and distribution rods (rings) of 8mm diameter at 9” c/c. The basement brickwork rises 2 feet above the tie beam level, totaling a height of 3 feet above ground level. Additionally, the basement is filled with 2½ feet of earth, 2 inches of river sand, and 4 inches of plain cement concrete .

The document specifies using high-quality acrylic emulsion wall paints and supercem cement paints for durability and resistance to environmental elements. For woodwork, teak frames for main doors and high-quality finishes for other wooden structures ensure longevity and aesthetic appeal. The sturdiness of such materials prevents premature wear and aesthetic degradation, while the use of quality finishes and paint enhances the building's visual appeal, ensuring the materials' longevity and minimizing maintenance over time .

Ceramic tiles are employed in all rooms and bathrooms, with specifications for floor and wall tiles delineated by height and cost. They provide a durable, moisture-resistant surface that is easy to clean and maintain. Their use in high-moisture areas like bathrooms and kitchens minimizes water damage and prevents mold growth. Additionally, ceramic tiles contribute aesthetically, offering a wide range of design choices to enhance the decor while being cost-effective, making them ideal for functional and decorative purposes .

The payment structure divides costs into stages: 10% as an advance, 25% up to basement level, 10% up to lintel level, 25% up to roof level, 15% for inside plastering, 10% for outside plastering, and 5% on final possession. This staged payment ensures that contractors maintain a steady cash flow while only receiving full payment upon satisfactory progress and completion. Such a structured approach can promote trust and transparency between contractor and client, as payments are tied to clear construction milestones, reducing the risk of disputes and ensuring accountability .

The overhead tank detailed in the document measures 5’0" x 4’0" x 4’0", and it's a critical component of the building's water storage and distribution system. These specifications ensure adequate water capacity and pressure for daily usage. Correct dimensions are crucial for balancing water supply with building requirements without causing excessive stress on the structure. Furthermore, precise tank construction prevents leaks, contamination, and structural failure, ensuring efficient, reliable water management throughout the building’s lifecycle .

Steel reinforcement is used to strengthen concrete structures against tensile forces. In the column and footing, the main rods are 12mm diameter while stirrups are 6mm diameter at 9” c/c. For the tie beam, the main rod specification includes 12mm diameter with 5 Nos, and 8mm distribution rods at 9" c/c. For roof construction, main rods are 10mm diameter placed at 6” c/c and distribution rods are 8mm diameter at 8” c/c. Specific placement and specification are crucial as they ensure structural integrity and prevent structural failures by adequately resisting loads and providing the necessary tensile strength .

Cell : 9677272267
7200501300
Sri Malmalayanur Prameswari Thunai
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periya
Cell : 9677272267
7200501300
Sri Malmalayanur Prameswari Thunai
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periya
Cell : 9677272267
7200501300
Sri Malmalayanur Prameswari Thunai
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periya
Cell : 9677272267
7200501300
Sri Malmalayanur Prameswari Thunai
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periya
Cell : 9677272267
7200501300
Sri Malmalayanur Prameswari Thunai
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periya

You might also like