0% found this document useful (0 votes)
2K views1 page

Non Conformance Report

This document is a nonconformance report detailing an issue with a subcontract. It includes sections to define the nonconformance by referencing drawings, specifications, or items; determine required corrective actions by the subcontractor; approve the corrective actions; and confirm completion. Signatures and attachments are included throughout to document the process.

Uploaded by

kerons
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Non Conformance Report

This document is a nonconformance report detailing an issue with a subcontract. It includes sections to define the nonconformance by referencing drawings, specifications, or items; determine required corrective actions by the subcontractor; approve the corrective actions; and confirm completion. Signatures and attachments are included throughout to document the process.

Uploaded by

kerons
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project........

Nonconformance Report
A. Definition of nonconformance: Subcontract No. Reference (dwg/spec) : : Item : Zone : Originator: Name: Signature Date: Attachments (pages A1, A2, A3, etc.) B. Definition of disposition: The following subcontractor/Company Department ............................................................................................. is requested to define corrective action required.

NCR No.: (Audit No.)

Company Quality Department: Name: Signature Date: Corrective action required: Name: Signature Date: Attachments (pages B1, B2, B3, etc.) C. Approval of disposition and instruction to implement: The above defined corrective action is approved and shall be implemented by:

Quality Department: Name: Signature Date: Attachments (pages C1, C2, C3, etc.) D. Close-out Corrective action is complete and documented Quality Department: Name: Signature Date: Attachments (pages D1, D2, D3, etc.) Field distribution: Copy: Originator/Construction Specialist Original Company QA

www.red-bag.com C:\RB_Forms\RBY010A.DOT\

Attachment 1 BN-G-Y010