⇒ Mechanical Engineer with @ 16 years of rich experience in the field of
Maintenance in Petrochemical Industries. Presently, working as Executive
(Mechanical) with Reliance Industries Ltd., Hazira, India, in a PTA
plant.
⇒ The main assignment is to work as a Maintenance Resources Planner, for
Mechanical section of a 750KTA PTA producing plant . solely responsible for
preparation of
Annual budget,
Preventive and corrective maintenance plans,
Raising purchase indents for spares and consumables ,
Work requests for services requirement for annual plan, one time jobs.
Functioning as a link between stores and plant maintenance , also a
Functioning as a link between plant maintenance and purchase &
contracts dept .
Technical specifications entry into purchase requisitions, job scope
writing for extra ordinary service requirements , technical bid analysis ,
clarifications , quotation evaluations , vendor / contractor performance
evaluation . expedition of material as well as services for completion of
projects in time .
Career Highlights
Since Novemeber, 1992 working with Reliance Industries Ltd., Hazira,
India. Presently, working as an Executive (Mechanical-Maintenance)
(PTA Plant). The Reliance Group is India’s largest business house with total
revenues of Rs. 1,50,000 crores. The group’s activities span exploration &
production (E&P) of oil & gas, refining/ marketing, petrochemicals (polyester,
polymers, and intermediates), textiles.
− Nov.’92 to May-94.’- Worked as a trainee technician – mechanical in
POLYETHELENE Plant of Reliance Industries Ltd., Hazira, Surat.
− May-94 to July-2003 – Worked as a technician – mechanical in
POLYVENYL CHLORIDE Plant of Reliance Industries Ltd., Hazira,
Surat.
− July-2003 to Nov-2005- worked as an Executive –Mechanical in
RELPIPE Plant , ( 20 Lines of HDPE Extruders ) of Reliance
Industries Ltd., Hazira, Surat.
− Nov-2005 to July-2006 – worked as a Project Engineer for
construction of 750 KTA , PTA Production plant. of Reliance
Industries Ltd., Hazira, Surat.
Page 1 of 4
PE, PVC plant – Worked as mechanical technician & involved in
commissioning , project work & Maintenance & overhauling of all type
Rotating & static equipments Like Dryer, Agitators, Centrifugal pumps,
Centrifugal compressor, Reciprocating compressor, Reciprocating pumps &
compressors., centrifuge, gear boxes , and worked exclusively for trouble
shooting of Mechanical seals.
PTA plant- Working as a Maintenance Resources Plannner since Nov-2006
till the date .
Current Job Role
− Planning (Day to Day, Weekly & Monthly Plans) and effecting Preventive
Maintenance Schedules of various equipments to increase Equipment
Reliability; thereby accomplishing planned production targets.
− Raising purchase requisitions for routine maintenance and reliability
centered jobs , material and services planning for turnaround jobs .
− Reports generation on regular basis , to keep monitoring of the inventory
levels ,unavailability of material , task based material requirement
mapping , quality checks of the received material , tracking of the receipts,
consumption, inventory , availability , reliability of the plant.
− Cataloguing of the new spares, On-going specification check , changes if
required.
− Involved in RCA’s ( Root cause analysis for failures, shortcomings etc. )
Identifying scope for User for SAP PM and MM modules.
SAP-PM Activities
o Preparation of yearly PM schedule, Preparation of weekly job
schedule, Preparation of Failure reports (FIR/FAR), PM Order
scheduling (Resource planning), Notification/PM Order cycle
completion, History updating.
SAP MM Activities
o Preparation of Material Master, PR creation & Follow up, Acceptance of
goods received & Preparation of material receipts, consumption and
inventory levels.
Routine/Shutdown Planning
− Includes Preventive / Predictive Maintenance Plans creation, Job list
preparation, Work Breakdown Structure creation, Material, Manpower &
Resource Planning, Continuous monitoring, Reliability checks.
− Coordinating material / spare parts planning related activities encompassing
identification of vendors, requirement specification & offer evaluation.
Page 2 of 4
External Contracts Handling
− Involved with developing of External Contracts including activities like
preparation of Contract scope of work, Technical Evaluation, Contracts
control system & Contracts Evaluation system.
Project Management
− Handling project activities for set up/ expansion, involving working out
various requirements with respect to utilities, machines, and manpower &
handling related operations.
− Handled Erection & Commissioning of various Equipment to ensure the
completion of projects within stipulated time/ cost parameters.
Maintenance Activities handled.
− Centrifugal pumps, reciprocating pumps, diaphragm pumps, screw
pumps, vacuum pumps of different make like Sulzer, kirloskar, KSB,
sundyne, Milton Roy etc.
− Reciprocating compressor- Burton Corblin make, centrifugal
compressors- Elliott make, Rotary filters-Steri Technology, centrifugal
blowers, agitators.
− Various types of mechanical Seals like Inboard, Outboard, single,
double arrangement and back to back with different types of flushing
plans.
− Various types of storage tanks including cryogenic material storage
tanks, spheres bullets and cylindrical tanks.
− Loading /unloading arms for hydrocarbon and other chemicals at Tank
farm.
− Reactors, Pressure vessels, various types of heat exchanges &
columns, filter press.
− Incineration system, absorber, scrubber systems for process vent
gases.
− Ball valves, plug valves, butterfly valves, diaphragm valves, gate
Valves, and globe valves.
Achievements:
Worked on deputation for Annual Shutdowns at various plants of the
complex.
Having handled the de-bottlenecking activities in an expansion project of
New down stream equipments to polymer Extruder and die-heads , starting
from erection, commissioning ,and stabilization phase.
Worked for Construction and Erection of 21000INM alloy steel ( P91) piping ,
in 95days record time from ground inspection of pipe components to
Hydrotest , and commissioning in stipulated time.
Worked as an MRP controller with sole responsibility of material
management for a turnaround job of 02 PTA plants in gap of 03 months.
{ complete job of turnaround planning , material indenting , storage ,
preservation , timely and effectively issue, and stock transfer after
completion of turnaround }
Page 3 of 4
Training Attended
MS-Project – for beginner and professional engineer.
Quality control techniques
Computer – MS-office , software, networking.
Educational Credentials
1988.1992 ::DIPLOMA MECHANICAL ENGINEERING from TECHNICAL
EXAMINATION BOARD- GUJARAT - INDIA.
2006-2009 :: PART TIME DEGREE IN MECHANICAL ENGINEERING FROM
SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHN0LOGY ( RESULTS
AWAITED )
Other Particulars
Date of Birth : 18 JAN-1974
th
Marital Status : Married.
Passport : E5062960 DT:07.07.2003
Contact Details : C 503, Rutvan Apptts. [Link] row house , Adajan
SURAT-395009
Gujarat - India.
With regards,
UDAY S. DAYAL
Page 4 of 4