Daily Report
Project Name: Myanmar Aquarium Project
Project Code:
4YG 04700
Proj Start Date
2014
Contract Period
31-Dec-2016
Remain Period
Estimate Completion Date
Report Date :
4-Aug-2016
Thursday
1 Year Calendar Day
150
No. of Day
AM
Weather
Calendar Day
Report No.
6~8
8~10
DPR-0366
PM
10 ~12
12~2
Surveyer Geotech Workers
Mason
2~4
Fine
4~6
Rain
Smith
Welder
Work Force
Trades
PM
PE
Today
SSE
Trades
Scaffolde Steel
r
Erector
Today
Site Engr QA/QC
QS
2
Roofing
worker
Painter
D&W
Installer
Admin
Safety
Security Site Store
3
Office
Staff
Driver
29
Carpente
r
10
Ceiling
worker
11
Total
72
6
Machine & Equipments onsite
Description
previous
Today
Remarks
Cum.
Description
Excavator
60 Ton Crane
Dozer
50 Ton Crane
Water Boxer
25 Ton Crane
Boom Lift
Generator
previous
Today
Cum.
Remarks
Description
previous
Today
Cum.
Remarks
Material Delivery On Site
Description
AG (G35 ) Boom Pump
FO-OP-01 REV-00
Unit
M3
Quantity
Today
Total
Description
Unit
Quantity
Today
Total
Description
Unit
Quantity
Today
Total
Remarks
142
Page: 1/2
Daily Report
Project Name: Myanmar Aquarium Project
Project Code:
4YG 04700
Report Date :
4-Aug-2016
QC - Test Sampling
Thursday
Item
No. of Day
Report No.
DPR-0366
Remarks
Test 12 Nos ( Mould No - 324~335 ) For Second Floor Slab at F & B Building
Sample
Taken
HSE
LTI Free Day
UA,UC
Near Miss
FAI
MTC
LTA
383897 hrs
Daily TBT
Conducted By
Safety Officer
Confined Space Safety
Works Carried out Details
Trades Of Work
I
Block - A ; F & B Building
Slab
1.1
2
2.1
Casting Concrete for Second Floor Slab
Location
Remark
Between Grid Line ; A1 & A5
COMPLETE
IC-12 ; Near Grid Line A5
COMPLETE
IC & WS Man Hole
Brickwork
Special Event
Visitors
on site
Site
Instructio
n
Purpose
Project Manager
Name
Signature
Project Engineer
Name
Signature
Sai Thaung Nyunt
Prepare By: Site Engineer
Name
Chu Pwint May
Signature
FO-OP-01 REV-00
FO-OP-01 REV-00
Page: 2/2